Laserfiche WebLink
PLANTING SCHEDULE - TREESKEYSCIENTIFIC NAMECOMMON NAMEQTY.SIZENOTESCONIFEROUSBFABIES BALSEMEABALSAM FIR76' ht. BBBSPICEA GLAUCA PUNGENSBLUE SPRUCE46' ht. BBBHPICEA GLAUCA DENSATABLACK HILLS SPRUCE146' ht. BBNSPICEA ABIESNORWAY SPRUCE26' ht. BBNPPINUS RESINOSANORWAY PINE56' ht. BBOVERSTORYNMACER PLATANOIDESNORWAY MAPLE32.5" cal. BBBOQUERCUS MACROCARPABUR OAK12.5" cal. BBSOQUERCUS BICOLORSWAMP OAK172.5" cal. BBSMACER SACCHARUMSUGAR MAPLE142.5" cal. BBRMACER RUBRUMRED MAPLE22.5" cal. BBORNAMENTALJTSYRINGA RETICULATAJAPANESE LILAC TREE142" cal. BBCAMALUS IOENSISCRAB APPLE142" cal. BBSHRUBSLISYRINGA SPECIESLILAC53 gal. potRDLOCALLY AVAILABLE SPECIESRHODODENDRON33 gal. potPRPEACE ROSE OR EQ.SHRUB ROSE3524" ht. cont.DRDAYDREAM OR EQ.SHRUB ROSE4024" ht. cont.JSJUNIPERSCANDIA63 gal. potBBEUONYMUS ALATUSBURNING BUSH293 gal. potMPPINUS MUGOMUGHO PINE243 gal. potAVARROWOOD VIBURNUMARROWOOD VIBURNUM73 gal. potACVIRBURNUM TRILOBUMCRANBERRY123 gal. pot1-NP1-NS5-SM20-DR20-PR3-NM1-BO4-LI1-SO1-LI1-SO2-RM4-CA2-CAFUTURE DEVELOPMENT AREA3-RDMULCH W/ 4" HDEDGING ANDFILTER FABRICEXISTING OAK TO REMAIN. PROVIDEFENCING AROUND THE PERIMETERDRIP LINE THROUGHOUT ALL OFDEMOLITION AND CONSTRUCTION.5' WIDE CONTINUOUS SOD STRIPAROUND CURB LINE5' WIDE SOD STRIPPROVIDE CLUSTER OF TREESAPPROXIMATELY 100' EAST OF THEWEST PROPERTY LINE. THIS WILL BESTAKED PRIOR TO START OFLANDSCAPE WORK..3-BHTHIS AREA POWER-SEEDED WITHPRAIRIE MIXSOD ENTIRE AREA2-JT1-SO5' WIDE CONTINUOUSSOD STRIP2-CASOD1-BS2-BH4-NP5-LI7-MP3-SM6-JS60'North1PRELIMINARY LANDSCAPE PLAN1"=30'-0"Scale0'30'VEHICLESTORAGESHOPSVEHICLE MAINTENANCEWASH BAYOFFICE AREASTAGING140TH STREET NORTHGATE41 PARKING SPACESGRAVELPONDSTORMWATERINFILTRATIONPONDSEPTICSYSTEMSWELLSIGN:ACC.PARK.SIGN:ACC.PARK.SIGN:CITY OF HUGOPUBLICWORKSDUMPSTERAREASTOPSIGNGRAVELGATECURB CUTFUTUREDRIVESALT STORAGESEE A/0.33,612 S.F.FUEL ISLAND (SEE A0.2)POTENTIAL FUTURE OFFICE AREA ADDITIONEXISTINGWETLANDAREAEXISTINGWETLANDAREAEXISTINGWETLANDAREACOVEREDMATERIALS STORAGE(SEE A0.4 - ALTERNATE #1)ELEC.STOPSIGNSTOPSIGNUPUPUP83'-0"101'-2"500'-7"116'-8"24'-4" <br />R9' <br />- <br />4 <br />" <br />26'-4" <br />165'-4" <br />R <br />2 <br />4 <br />' <br />- <br />4 <br />" <br />20'-0" <br />116'-4" <br />165'-7"101'-4"24'-5" <br />26'-4" <br />24'-4" <br />63'-11" <br />237'-0"R10'-10"R24'-4"R9 <br />' <br />- <br />4 <br />"R24'-4"R2 <br />4 <br />' <br />- <br />4 <br />" <br />R2 <br />4 <br />' <br />- <br />4 <br />" <br />136'-8" <br />R <br />2 <br />4 <br />' <br />- <br />4 <br />" <br />80'-8"275'-11"13'-0"100'-7"75'-8"34'-4"82'-0"190'-0"50'-8" <br />31'-8" <br />50'-8"73'-4"31'-4"31'-4"76'-0"42'-0"236'-4"165'-7"360'-0"116'-0"262'-9"45'-0"509'-0"26'-10"60'-0"45'-0"R25'-8"R24'-4"52' <br />-7 <br />"376'-2"398'-8"376'-10"9'-0"20'-0"40'-1"40'-1"1-NS9-BH2-BF4-CA2-MP5-MP5-BB14-SO6-JT4-BB2-AV2-AV4-BB3-AV2-CA6-SM20-DRMULCH W/ 4" EDGING& FILTER FABRICMULCH W/ 4" HD EDGING& FILTER FABRIC6-JT12-AC15-PRMULCH W/ 4" HD EDGING &FILTER FABRIC @ SOUTH ONLY5-BF4-MP2-MP4-BS4-MP16-BBTHIS AREA TO BE POWER-SEEDEDTHIS AREA POWER-SEEDED WITHPRAIRIE MIX3SHRUB/PERENNIAL PLANTING DEAILN.T.S.PREPARED PLANTING BEDAND BACKFILL SOIL(THOROUGHLY LOOSENED)VERIFY SPACING WITH ARCHITECTEXTEND HOLE EXCAVATION WIDTHA MIN. OF 6" BEYOND THE PLANT'S ROOT SYSTEMNOTES:1.SCARIFY SIDES AND BOTTOM OF HOLE.2.PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT.3.REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TOREDIRECT AND PREVENT CIRCLING FIBROUS ROOTS. REMOVEOR CORRECT STEM GIRDLING ROOTS.4.PLUMB AND BACKFILL WITH PLANTING SOIL.5.WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS ANDFILL VOIDS.6.BACK FILL VOIDS AND WATER SECOND TIME.7.PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERINGUNLESS SOIL MOISTURE IS EXCESSIVE.8.MIX IN 3-4" OF ORGANIC COMPOST.EDGER, AS SPECIFIED2TREE PLANTING DETAILN.T.S.SODPLANTING SOILSTEEL STAKEDOUBLE SHREDDEDHARDWOOD MULCH4" TOPSOIL2X ROOT TO BALL WIDTHNOTES:1.SCARIFY SIDES AND BOTTOM OF HOLE.2.PROCEED WITH CORRECTIVE PRUNING.3.SET PLANT ON UNDISTURBED NATIVE SOIL OR THOROUGHLY COMPACTEDPLANTING SOIL. INSTALL PLANT SO THE ROOT FLARE IS AT OR UP TO 2" ABOVETHE FINISHED GRADE WITH BURLAP AND WIRE BASKET (IF USED), INTACT.4.SLIT REMAINING TREATED BURLAP AT 6" INTERVALS.5.BACKFILL TO WITHIN APPROXIMATELY 12" OF THE TOP OF THE ROOTBALL, THENWATER PLANT. REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP TWOHORIZONTAL RINGS, WHICHEVER IS GREATER. REMOVE ALL BURLAP AND NAILSFROM THE TOP 1/3 OF THE BALL. REMOVE ALL TWINE. REMOVE OR CORRECTSTEM GIRDLING ROOTS.6.PLUMB AND BACKFILL WITH PLANTING SOIL.7.WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL VOIDS.8.BACK FILL VOIDS AND WATER A SECOND TIME.9.PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS SOILMOISTURE IS EXCESSIVE.10.FINAL LOCATION OF TREE TO BE APPROVED BY OWNER.11.STAKE ASPENS WITH APPROVED STAKING METHOD. NOTES1. ALL DISTURBED AREAS ARE TO BEPOWER-SEEDED WITH PRAIRIE MIX. REFER TOCIVIL DRAWING FOR EXTENT OF EARTHWORK.THIS INCLUDES THE NE STORM POND ANDALL OTHER DISTURBED AREA OUTSIDE OF THEFENCE LINE.2. SOD AREAS SHOWN WITH3. ALL EXISTING TREES, SHRUBS, AND ROOTS TO BE REMOVED WITHIN THE FACILITY GROUNDS AND OUTSIDE OF THE FENCE LINE @ DISTURBED AREAS. SEE CIVIL DRAWINGS.4. ALL EXISTING TREES WITHIN THE WORK ZONE ARE "JUNK" TYPE (E.G. BH ELDER).5. NUMBER OF TREES MEETS CITY REQUIREMENT BASED ON BUILDING SIZE. IT IS REQUIRED THAT THE NUMBER OF SHRUBS FALL BETWEEN BUILDING SIZE & PERIMETER, TOTAL OF 107.EMWJLO20-011795 ST. CLAIR AVENUEST. PAUL, MN 55105 (651) 696-5186www.oertelarchitects.comJUNE 11, 2020Hugo, MN.City of HugoPublic WorksFacilityNOT <br /> <br />FO <br />R <br /> <br />CON <br />S <br />T <br />R <br />UC <br />T <br />ION OERTELARCHITECTSA0.LPROPOSEDLANDSCAPE PLAN