Laserfiche WebLink
<br />K:\03288-190\Admin\Construction Admin\Change Orders\Change Order No. 2\03288-190 LTR CO2 to City 071520.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM July 15, 2020 <br /> <br /> <br /> <br /> <br />Mr. Brian Bear <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br /> <br />Re: Water Tower No. 4 <br /> Change Order No. 2 <br />City of Hugo, MN <br /> WSB Project No. 03288-190 <br /> <br /> <br />Dear Mr. Bear: <br /> <br />The attached Change Order No. 2 includes two credits for the following changes to the contract <br />for the above referenced project: <br /> <br />1. A deduction of $3,000 from the contract amount to eliminate the Water Tower’s seepage <br />pit and associated drain piping. <br /> <br />2. A deduction of $2,500 from the contract amount to reduce the length of 18” RCP pipe by <br />25-feet. The revised total length of pipe will be 95-feet. <br /> <br />We recommend accepting this change order. If the City is in agreement, please sign the attached <br />Change Order No. 2 and return one copy to WSB. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Mark Erichson, PE <br />Sr. Project Manager <br /> <br />Enclosures <br /> <br />cc: Scott Anderson <br /> Mike Loeffler <br /> <br />kkp <br />