Laserfiche WebLink
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 PAGES <br />AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing CB&I INC. - INVOICE NUMBER:235318-11 <br />Contractor's signed Certification is attached.APPLICATION NUMBER:11 <br />in tabulations below, amounts are stated to the nearest dollar.APPLICATION DATE:07/09/20 <br />Use Column 1 on Contracts where variable retainage for line items may apply.WORK FROM DATE:06/03/20 <br />WORK THRU DATE:07/02/20 <br />A B C E F G H I J K <br />ITEM DESCRIPTION OF WORK TOTAL COST PER SCHEDULED WORK PREVIOUS WORK MATERIALS TOTAL TOTAL BALANCE PREVIOUS CURRENT TOTAL <br />NO.OUANTITY UNIT VALUE FROM %COMPLETED PRESENTLY COMPLETED TO DATE TO FINISH RETAINAGE RETAINAGE RETAINAGE <br />PREVIOUS (D div C)THIS PERIOD STORED AND STORED %( C - G )5%5%5% <br />APPLICATIONS ( NOT IN TO DATE (G div.C) <br /> D OR E )( D + E + F ) <br />1 INSURANCE AND BONDS 1.00 $79,500.00 $79,500.00 79,500.00 100%0.00 79,500.00 100%0.00 3,975.00 0.00 3,975.00 <br />2 ENGINEERING & APPROVAL 1.00 $346,500.00 $346,500.00 329,173.45 95.0%0.00 329,173.45 95.0%17,326.55 16,458.67 0.00 16,458.67 <br />3 TANK MATERIAL 1.00 $502,300.00 $502,300.00 502,300.00 100%0.00 502,300.00 100%0.00 25,115.00 0.00 25,115.00 <br />4 TANK FABRICATION & SHIP 1.00 $517,275.00 $517,275.00 517,275.00 100%0.00 517,275.00 100%0.00 25,863.75 0.00 25,863.75 <br />5 SITE PREPARATION / MOBILIZATION OF EQUIPMENT 1.00 $20,000.00 $20,000.00 20,000.00 100%0.00 20,000.00 100%0.00 1,000.00 0.00 1,000.00 <br />6 CIP 12" CONCRETE PILING DELIVERED 5,850.00 $40.00 $234,000.00 93,600.00 2340.00 0.00 93,600.00 2340.00 140,400.00 4,680.00 0.00 4,680.00 <br />6.1 CIP 12" CONCRETE PILING DRIVEN 5,850.00 $2.50 $14,625.00 5,850.00 2340.00 0.00 5,850.00 2340.00 8,775.00 292.50 0.00 292.50 <br />6.2 CIP 120' DEEP=12" CONCRETE TEST PILE 1.00 $13,000.00 $13,000.00 13,000.00 1.00 0.00 13,000.00 1.00 0.00 650.00 0.00 650.00 <br />7 DRILLED PIER INSPECTION 1.00 $20,000.00 $20,000.00 20,000.00 100%0.00 20,000.00 100%0.00 1,000.00 0.00 1,000.00 <br />8 FOUNDATION CONSTRUCTION 1.00 $468,600.00 $468,600.00 468,600.00 100%0.00 468,600.00 100%0.00 23,430.00 0.00 23,430.00 <br />9 SHAFT ERECTION 1.00 $420,300.00 $420,300.00 420,300.00 100%0.00 420,300.00 100%0.00 21,015.00 0.00 21,015.00 <br />10 TANK ERECTION 1.00 $209,600.00 $209,600.00 146,720.00 70%52,400.00 199,120.00 95%10,480.00 7,336.00 2,620.00 9,956.00 <br />11 TANK PAINT - GROUND 1.00 $325,000.00 $325,000.00 0.00 0%0.00 0.00 0%325,000.00 0.00 0.00 0.00 <br />12 TANK HOIST / ROOF 1.00 $95,000.00 $95,000.00 0.00 0%0.00 0.00 0%95,000.00 0.00 0.00 0.00 <br />13 TANK PAINT - AIR 1.00 $97,300.00 $97,300.00 0.00 0%0.00 0.00 0%97,300.00 0.00 0.00 0.00 <br />14 STERILIZE AND TEST 1.00 $1,000.00 $1,000.00 0.00 0%0.00 0.00 0%1,000.00 0.00 0.00 0.00 <br />15 ELECTRICAL 1.00 $125,200.00 $125,200.00 0.00 0%0.00 0.00 0%125,200.00 0.00 0.00 0.00 <br />16 FINAL SITE WORK 1.00 $21,300.00 $21,300.00 0.00 0%0.00 0.00 0%21,300.00 0.00 0.00 0.00 <br />CO1 Credit 1.00 -$22,000.00 -$22,000.00 (22,000.00)100%0.00 (22,000.00)100%0.00 (1,100.00)0.00 (1,100.00) <br />3,488,500.00 2,594,318.45 74%52,400.00 0.00 2,646,718.45 75.87%841,781.55 129,715.92 2,620.00 132,335.92 <br />AIA DOCUMENT G703 - APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 - AIA*-1992 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 G703-1992 <br />D