Laserfiche WebLink
Can volume control be provided on-site or has it been planned for regionally?On-Site Infiltration (must be considered first)Water quality treatment volume provided: ______________% Met: ___________ On-Site Water ReuseWater quality treatment volume provided: ____________% Met: ___________Volume credits may be purchased from the City as available from a regionally planned reuse project within the same Resource of ConcernCan a different stormwater BMP be located onsite to provide water quality treatment?Stormwater PondsWater quality treatment volume provided: ____________% Met: ___________ Filtration/BiofiltrationWater quality treatment volume provided: _____________% Met: ____________ Can stormwater BMPs be located in a downstream location that intercepts the runoff volume leaving the project site prior to the ROC? Can stormwater BMPs be located anywhere within the same ROC Drainage Area that results in no greater mass of Total Phosphorus reaching the resource of concern than on-site BMPs? Volume credits may be purchased from the City as available within the same Resource of ConcernRequired water quality treatment volume from BMP selection (show calculation): Has the water quality treatment volume requirement been 100% met?If requirement is not 100% met, revise BMP design or apply for RCWD Stormwater Variance. YesNoNOYES NOYES Water quality treatment volume provided: __________% Met: __________Water quality treatment volume provided: __________% Met: __________NOYESBegin HereProject Name: ________________WSB Project #: ________________Reviewed By: _________________ROC: Resource of ConcernBMP: Best Management PracticeRCWD: Rice Creek Watershed DistrictNOYES