ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT <br />SOILS INFORMATION <br />PROJECT NAME: HUGO FLATS <br />PROJECT LOCATION (BRIEFLY DESCRIBE WHERE CONSTRUCTION ACTIVITY OCCURS. INCLUDE ADDRESS IF AVAILABLE.) <br />ADDRESS: - <br />CITY OR TOWNSHIP: HUGO <br />STATE: MN <br />ZIP CODE: 55038 <br />LATITUDE/LONGITUDE OF APPROXIMATE CENTROID OF PROJECT: 45.162254,-92.998244 <br />METHOD OF LAT/LONG COLLECTION (CIRCLE ONE): GPS ONLINE TOO USGS TOPOGRAPHIC <br />ALL CITIES WHERE CONSTRUCTION WILL OCCUR: HUGO <br />ALL COUNTIES WHERE CONSTRUCTION WILL OCCUR: WASHINGTON <br />ALL TOWNSHIPS WHERE CONSTRUCTION WILL OCCUR: - <br />PROJECT SIZE (NUMBER OF ACRES TO BE DISTURBED): 12.5 <br />PROJECT TYPE (CIRCLE ONE): RESIDENTIAL COMMERCIAL/INDUSTRIAL ROAD CONSTRUCTION <br />RE STDE <br />NTrAE-& RD CONSTRUCTION OTHER (DESCRIBE): XXXXX <br />CUMULATIVE IMPERVIOUS SURFACE (TO THE NEAREST TENTH ACRE) <br />EXISTING AREA OF IMPERVIOUS SURFACE: 3.0 <br />POST CONSTRUCTION AREA OF IMPERVIOUS SURFACE: 9.0 <br />TOTAL NEW AREA OF IMPERVIOUS SURFACE: 6.0 <br />RECEIVING WATERS <br />WATER BODY ID <br />NAME OF WATER BODY <br />WATER BODY TYPE <br />SPECIAL WATER? (Y/N) <br />IMPARIED WATER (Y/N) <br />07010206-519 <br />CLEARWATER CREEK <br />CREEK <br />N <br />Y <br />DATES OF CONSTRUCTION <br />CONSTRUCTION START DATE: 06/20 <br />ESTIMATED COMPLETION DATE: 06/21 <br />Map <br />Unit <br />Map Unit Name <br />Symbol <br />75 <br />Bluffton loam <br />158B <br />Zimmerman fine <br />sand, 1 to 6 <br />percent slopes <br />158C <br />Zimmerman fine <br />sand, 6 to 12 <br />percent slopes <br />161 <br />Isantl loamy fine <br />sand, <br />depressional <br />162 <br />Lino ioarny fine <br />sand <br />265 <br />SodervNle loamy <br />fine sand <br />540 <br />Seelyeville muck <br />543 <br />Markey muck <br />544 <br />Cathro muck <br />1813E <br />Llna variant <br />loamy fine sand, <br />2 to 6 percent <br />slopes <br />GENERAL CONSTRUCTION PROJECT INFORMATION <br />DESCRIBE THE CONSTRUCTION ACTIVITY (WHAT WILL BE BUILT, GENERAL TIMELINE, ETC): SEVERAL PROPOSED TOWNHOME BUIDLINGS AND THEIR ASSOCAITED SITE FEATURES WILL BE CONSTRUCTED. AS WELL AS AN EXTENSION <br />OF A PUBLIC ROAD. <br />DESCRIBE SOIL TYPES FOUND AT THE PROJECT: SANDLY LOAM (HSG C) <br />SITE LOCATION MAP - ATTACH MAPS (U.S. GEOLOGIC SURVEY 7.5 MINUTE QUADRANGLE, NATIONAL WETLAND INVENTORY MAPS OR EQUIVALENT) SHOWING THE LOCATION AND TYPE OF ALL RECEIVING WATERS, INCLUDING <br />WETLANDS, DRAINAGE DITCHES, STORMWATER PONDS, OR BASINS, ETC. THAT WILL RECEIVE RUNOFF FROM THE PROJECT. USE ARROWS SHOWING THE DIRECTION OF FLOW AND DISTANCE TO THE WATER BODY. <br />GENERAL SITE INFORMATION (III.A) <br />1. DESCRIBE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICIES (BMP'S). INCLUDE THE TIMING FOR INSTALLATION AND PROCEDURES <br />USED TO ESTABLISH ADDITIONAL TEMPORARY BMP'S AS NECESSARY. (III.A.4.A) <br />THE PROJECT IS PROTECTED BY TWO (W) MAIN BMP'S, SILT FENCE AND INLET PROTECTION DEVICES. THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE AND MONITORED AS NECESSARY. INLET <br />PROTECTION DEVIDES WILL BE INSTALLED IN ALL CATCH BASINS ON THE SITE AND ANY OFF SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES ADDITIONAL BMP'S SUCH AS EROSION <br />CONTROL BLANKET MAY BE UTILITZED. <br />2. ATTACH TO THIS SWPPP A TABLE WITH THE ANTICIPATED QUANITITIES FOR THE LIFE OF THE PROJECT FOR ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S (III.A.4.13) SEE PAGE SW1.3 <br />3. ATTACH TO THIS SWPPP A SITE MAP THAT INCLUDES THE FOLLOWING FEATURES (III.A.3.B-F): <br />EXIST AND FINAL GRADES. INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST -CONSTRUCTION STORMRWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN THE PROJECT LIMITS. <br />LOCATIONS OF IMPERVIOUS SURFACES AND SOIL TYPES. <br />• EXISTING AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST -CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN PROJECT LIMITS. <br />• LOCATIONS OF AREAS NOT TO BE DISTRUBED. <br />• LOCATION OF AREAS OF PHASED CONSTRUCTION. <br />• ALL SURFACE WATERS AND EXISTING WETLANDS WITHIN ONE MILE FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER RUNOFF FROM THE SITE (IDENTIFIABLE ON MAPS SUCH AS USGS 7.5 MINUTE <br />QUADRANGLE MAPS OR EQUIVALENT. WHERE SURFACE WATERS RECEIVING RUNOFF ASSOCIATED WITH CONSTRUCTION ACTIVITY WILL NOT FIT ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW, <br />INDICATING BOTH DIRECTION AND DISTANCE TO THE SURFACE WATER. <br />• METHODS TO BE USED FOR FINAL STABILIZATION OF ALL EXPOSED SOIL AREA <br />4. WERE STORMWATER MITIGATION MEASURES REQUIRED AS THE RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR OTHER REQUIRED LOCAL, STATE OR FEDERAL REVIEW OF THE PROJECT? NO <br />IF YES, DESCRIBE HOW THESE MEASURES WERE ADDRESSED IN THE SWPPP. (III.A.6) <br />N/A <br />5. IS THE PROJECT LOCATED IN A KARST AREA SUCH THAT ADDITIONAL MEASURES WOULD BE NECESSARY OT PROJECT DRINKING WATER SUPPLY MANAGEMENT AREAS AS DESCRIBED IN MINN. R. CHAPTERS 7050 AND 7060? NO <br />IF YES, DESCRIBE THE ADDITIONAL MEASURES TO BE USED. (III.A.7) <br />N/A <br />6. DOES THE SITE DISCHARGE TO A CALCEREOUS FEN LISTED IN MINN. R. 7050.0180, SUBP. 6 B? NO <br />IF YES, A LETTER OF APPROVAL FROM THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES MUST BE OBTAINED PRIOR TO APPLICATION FOR THIS PERMIT. (PART I B.6 AND PART III.A.8) <br />7. DOES THE SITE DISCHARGE TO A WATER THAT IS LISTED AS IMPAIRED FOR THE FOLLOWING POLLUTANT(S) OR STRESSOR(S): PHOSPHORUS, TURBIDITY, DISSOLVED OXYGEN OR BIOTIC IMPAIRMENT? USE THE SPECIAL AND <br />IMPAIRED WATERS SEARCH TOOL AT: WWW.PCA.STATE.MN.US/WATER/STORMWATER/STORMWATER-C.HTML <br />YES <br />IF NO, SKIP TO TRAINING <br />DOES THE IMPAIRED WATER HAVE AN APPROVED TOTAL MAXIMUM DAILY LOADS (TMDL) WITH AN APPROVED WASTE LOAD ALLOCATION FOR CONSTRUCTION ACTIVITY? NO <br />IF YES: <br />A. LIST THE RECEIVING WATER, THE AREAS OF THE SITE DISCHARGING TO IT, AND THE POLLUTANT(S) IDENTIFIED IN THE TMDL. <br />B. LIST THE BMP'S AND ANY OTHER SPECIFIC CONSTRUCTION STORMWATER RELATED IMPLEMENTATION ACTIVITIES IDENTIFIED IN THE TMDL. <br />IF THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF THE IMPAIRED WATER AND THE WATER FLOWS TO THE IMPAIRED WATER BUT NO SPECIFIC BMPS FOR CONSTRUCTION ARE IDENTIFIED IN THE TMDL, THE ADDITIONAL <br />BMPS IN APPENDIX A (C.1, C.2, C.3 & (CA -TROUT STREAM)) MUST BE ADDED TO THE SWPPP AND IMPLEMENTED. (III.A.7). THE ADDITIONAL BMPS ONLY APPLY TO THOSE PORTIONS OF THE PROJECT THAT DRAIN TO ONE OF THE <br />IDENTIFIED DISCHARGE POINTS. <br />N/A <br />8. IDENTIFY ADJACENT PUBLIC WATERS WHERE THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES (DNR) HAS DECLARED "WORK IN WATER RESTRICTIONS" DURING FISH SPAWNING TIMEFRAMES <br />N/A <br />SELECTION OF A PERMANENT STORMWATER MANAGEMENT SYSTEM (III.D.) <br />1. WILL THE PROJECT CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE? YES OR NO <br />IF YES, A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF FROM THE CUMULATIVE NEW IMPERVIOUS SURFACES MUST BE RETAINED ON SITE (SEE PART III.D OF THE PERMIT) THROUGH INFILTRATION UNLESS PROHIBITED DUE <br />TO ONE OF THE REASONS IN PART III.D.1.J. IF INFILTRATION IS PROHIBITED IDENTIFY OTHER METHOD OF OTHER VOLUME REDUCTION (E.G., FILTRATION SYSTEM, WET SEDIMENTATION BASIN, REGIONAL PONDING OR EQUIVALENT <br />METHOD <br />2. DESCRIBE WHICH METHOD WILL BE USED TO TREAT RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE PROJECT (III.D): <br />• WET SEDIMENTATION BASIN <br />• INFILTRATION/FILTRATION <br />• REGIONAL PONDS <br />• COMBINATION OF PRACTICES <br />INCLUDE ALL CALCULATIONS AND DESIGN INFORMATION FOR THE METHOD SELECTED. SEE PART III.D OF THE PERMIT FOR SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH METHOD. <br />REGIONAL PONDING <br />CALCULATIONS ARE WITHIN THE SITE STORM WATER MANAGEMENT REPORT AND PART OF THIS SWPPP AS ATTACHMENT D. <br />3. IF IT IS NOT FEASIBLE TO MEET THE TREATMENT REQUIREMENT FOR THE WATER QUALITY VOLUME, DESCRIBE WHY. THIS CAN INCLUDE PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY <br />PRECLUDES THE INSTALLATION OF ANY PERMANENT STORMWATER MANAGEMENT PRACTICES. DESCRIBE WHAT OTHER TREATMENT, SUCH AS GRASSES SWALES, SMALLER PONDS, OR GRIT CHAMBERS, WILL BE IMPLEMENTED <br />TO TREAT RUNOFF PRIOR TO DISCHARGE TO SURFACE WATERS. (III.C) <br />IT IS FEASIBLE TO MEET REQUIREMENT FOR WATER QUALITY VOLUME. <br />4. FOR PROJECTS THAT DISCHARGE TO TROUT STREAMS, INCLUDING TRIBUTARIES TO TROUT STREAMS, IDENTIFY METHOD OF INCORPORATING TEMPERATURE CONTROLS INTO THE PERMANENT STORMWATER MANAGEMENT <br />SYSTEM. <br />N/A <br />EROSION PREVENTION PRACTICES (IV.B) <br />DESCRIBE THE TYPES OF TEMPORARY EROSION PREVENTION BMP'S EXPECTED TO BE IMPLEMENTED ON THIS SITE DURING CONSTRUCITON: <br />1. DESCRIBE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES TO MINIMIZE EROSION. DELINEATE AREAS NOT TO BE <br />DISTURBED (E.G., WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) BEFORE WORK BEGINS. <br />SILT FENCE WILL BE INSTALLED AT ATHE DOWNHILL LOCATIONS OF THE SITE. <br />2. DESCRIBE METHODS OF TEMPORARILY STABILIZING SOILS AND SOIL STOCKPILES (E.G., MULCHES, HYDRAULIC TACKIFIERS, EROSION BLANKETS, ETC.): <br />TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, WITH PERMANENT COVER BEING EITHER SOD OR LANDSCAPE FEATURES. <br />3. DESCRIBE METHODS OF DISSIPATING VELOCITY ALONG STORMWATER CONVEYANCE CHANNELS AND AT CHANNEL OUTLETS (E.G., CHECK DAMS, SEDIMENT TRAPS, RIP RAP, ETC.): <br />SOD WILL BE UTILIZED ALONG CHANNELS AND RIP RAP AT CHANNEL. <br />4. DESCRIBE METHODS TO BE USED FOR STABILIZATION OF DITCH AND SWALE WETTED PERIMETERS (NOTE THAT MULCH, HYDRAULIC SOIL TACKIFIERS, HYDROMULCHES, ETC. ARE NOT ACCEPTABLE <br />SOIL STABILIZATION METHODS FOR ANY PART OF A DRAINAGE DITCH OR SWALE) <br />FINAL STABILIZATION OF SWALES WILL BE SOD <br />5. DESCRIBE METHODS TO BE USED FOR ENERGY DISSIPATION AT PIPE OUTLETS (E.G., RIP RAP, SPLASH PADS, GABIONS, ETC.) <br />RIP RAP WILL BE UTILIZED AT PIPE OUTLETS <br />6. DESCRIBE METHODS TO BE USED TO PROMOTE INFILTRATION AND SEDIMENT REMOVAL ON THE SITE PRIOR TO OFFSITE DISCHARGE, UNLESS INFEASIBLE (E.G., DIRECT STORMWATER FLOW TO <br />VEGETATED AREAS): <br />DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILIZED <br />7. FOR DRAINAGE OR DIVERSION DITCHES, DESCRIBE PRACTICES TO STABILIZE THE NORMAL WETTED PERIMETER WITHIN 200 LINEAL FEET OF THE PROPERTY EDGE OR POINT OF DISCHARGE TO <br />SURFACE WATER. THE LAST 200 LINEAL FEET MUST BE STABILIZED WITHIN 24 HOURS AFTER CONNECTING TO SURFACE WATERS AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY <br />OR PERMANENTLY CEASED FOR ALL DISCHARGES TO SPECIAL, IMPAIRED OR "WORK IN WATER RESTRICTIONS". ALL OTHER REMAINING PORTIONS OF THE TEMPORARY OR PERMANENT DITCHES OR <br />SWALES WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER, PROPERTY EDGE AND CONSTRUCTION IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED. <br />N/A, NO DITCHES ON SITE <br />8. DESCRIBE ADDITIONAL EROSION PREVENTION MEASURES THAT WILL BE IMPLEMENTED AT THE SITE DURING CONSTRUCTION (E.G., CONSTRUCTION PHASING, MINIMIZING SOIL DISTURBANCE, <br />VEGETATIVE BUFFERS, HORIZONTAL SLOPE GRADING, SLOPE DRAINING/TERRACING, ETC.): <br />OTHER EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO; MINIMIZING SITE EXPOSURE WHEN POSSIBLE. <br />9. IF APPLICABLE, INCLUDE ADDITIONAL REQUIREMENTS IN APPENDIX A PART C.3 REGARDING MAINTAINING A 100-FOOT BUFFER ZONE OR INSTALLING REDUNDANT BMPS FOR PORTIONS OF THE SITE <br />THAT DRAIN TO SPECIAL WATERS). <br />N/A <br />10. IF APPLICABLE, DESCRIBE ADDITIONAL EROSION PREVENTION BMPS TO BE IMPLEMENTED AT THE SITE TO PROTECT PLANNED INFILTRATION AREAS <br />MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO INFILTRATION AREAS. <br />SEDIMENT CONTROL PRACTICIES (IV.C) <br />DESCRIBE THE METHODS OF SEDIMENT CONTROL BMPS TO BE IMPLEMENTED AT THIS SITE DURING CONSTRUCTION TO MINIMIZE SEDIMENT IMPACTS TO SURFACE WATERS, INCLUDING CURB AND <br />GUTTER SYSTEMS <br />1. DESCRIBE METHODS TO BE USED FOR DOWN GRADIENT PERIMETER CONTROL: <br />SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE <br />2. DESCRIBE METHODS TO BE USED TO CONTAIN SOIL STOCKPILES: <br />SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY <br />3. DESCRIBE METHODS TO BE USED FOR STORM DRAIN INLET PROTECTION: <br />SEE INLET PROTECTION DETAILS <br />4. DESCRIBE METHODS TO MINIMIZE VEHICLE TRACKING AT CONSTRUCTION EXITS AND STREET SWEEPING ACTIVITIES: <br />THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE. <br />5. DESCRIBE METHODS, IF APPLICABLE, ADDITIONAL SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO BE INSTALLED TO KEEP RUNOFF AWAY FROM PLANNED INFILTRATION AREAS WHEN EXCAVATED <br />PRIOR TO FINAL STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA: <br />SILT FENCE TO BE INSTALLED IMMEDIATELY AFTER GRADING TO PROTECT INFILTRATION AREAS. <br />6. DESCRIBE METHODS TO BE USED TO MINIMIZE SOIL COMPACTION AND PRESERVE TOP SOIL (UNLESS INFEASIBLE) AT THIS SITE: <br />LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED <br />7. DESCRIBE PLANS TO PRESERVE A 50-FOOT NATURAL BUFFER BETWEEN THE PROJECT'S SOIL DISTURBANCE AND A SURFACE WATER OR PLANS FOR REDUNDANT SEDIMENT CONTROLS IF A BUFFER <br />IS INFEASIBLE: <br />DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. PROJECT WILL NOT DISTURB WITHIN 200 FEET OF WETLAND. <br />8. DESCRIBE PLANS FOR USE OF SEDIMENTATION TREATMENT CHEMICALS (E.G., POLYMERS, FLOCCULANTS, ETC.) SEE PART IV.C.10 OF THE PERMIT: <br />N/A <br />9. IS THE PROJECT REQUIRED TO INSTALL A TEMPORARY SEDIMENT BASIN DUE TO 10 OR MORE ACRES DRAINING TO A COMMON LOCATION OR 5 ACRES OR MORE IF THE SITE IS WITHIN 1 MILE OF A <br />SPECIAL OR IMPAIRED WATER? <br />NO <br />IF YES, DESCRIBE (OR ATTACH PLANS) SHOWING HOW THE BASIN WILL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH PART III.0 OF THE PERMIT. <br />N/A <br />DEWATERING AND BASIN DRAINING (IV.D) <br />1. WILL THE PROJECT INCLUDE DEWATERING OR BASIN DRAINING? NO <br />IF YES, DESCRIBE MEASURES TO BE USED TO TREAT/DISPOSE OF TURBID OR SEDIMENT -LADEN WATER AND METHOD TO PREVENT EROSION OR SCOUR OF DISCHARGE POINTS (SEE PART IV. D OF THE <br />PERMIT): <br />N/A <br />2. WILL THE PROJECT INCLUDE USE OF FILTERS FOR BACKWASH WATER? NO <br />IF YES, DESCRIBE HOW FILTER BACKWASH WATER WILL BE MANAGED ON THE SITE OR PROPERLY DISPOSED (SEE PART III.D.3. OF THE PERMIT): <br />N/A <br />ADDITIONAL BMP'S FOR SPECIAL WATERS AND DISCHARGES TO WETLANDS (APPENDIX A, PARTS C AND D) <br />1. SPECIAL WATERS. DOES YOUR PROJECT DISCHARGE TO SPECIAL WATERS? NO <br />2. IF PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATER MANAGEMENT PRACTICES, THEN <br />OTHER TREATMENT SUCH AS GRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS IS REQUIRED PRIOR TO DISCHARGE TO SURFACE WATERS. DESCRIBE WHAT OTHER TREATMENT WILL BE <br />PROVIDED. <br />N/A <br />3. DESCRIBE EROSION AND SEDIMENT CONTROLS FOR EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE TO A SPECIAL WATERS, AND TEMPORARY SEDIMENT BASINS FOR AREAS THAT <br />DRAIN FIVE OR MORE ACRES DISTURBED AT ONE TIME. <br />N/A <br />4. DESCRIBE THE UNDISTURBED BUFFER ZONE TO BE USED (NOT LESS THAN 100 LINEAR FEET FROM THE SPECIAL WATER). <br />N/A <br />5. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL ENSURE THAT THE PRE AND POST PROJECT RUNOFF RATE AND VOLUME FROM THE 1, AND 2-YEAR 24-HOUR <br />PRECIPITATION EVENTS REMAINS THE SAME. <br />N/A <br />6. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL MINIMIZE ANY INCREASE IN THE TEMPERATURE OF TROUT STREAM RECEIVING WATERS RESULTING IN THE 1, AND <br />2-YEAR 24-HOUR PRECIPITATION EVENTS. <br />N/A <br />7. WETLANDS. DOES YOUR PROJECT DISCHARGE STORMWATER WITH THE POTENTIAL FOR SIGNIFICANT ADVERSE IMPACTS TO A WETLAND (E.G., CONVERSION OF A NATURAL WETLAND TO A <br />STORMWATER POND)? YES OR NO <br />IF YES, DESCRIBE THE WETLAND MITIGATION SEQUENCE THAT WILL BE FOLLOWED IN ACCORDANCE WITH PART D OF APPENDIX A. <br />N/A <br />INSPECTIONS AND MAINTENANCE (IV.E) <br />DESCRIBE PROCEDURES TO ROUTINELY INSPECT THE CONSTRUCTION SITE: <br />• ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND <br />• WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN (7) DAYS AFTER THAT <br />INSPECTIONS MUST INCLUDE STABILIZED AREAS, EROSION PREVENTION,AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS. <br />INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION STORMWATER INSPECTION CHECKLIST" <br />1. Describe practices for storage of building products with a potential to leach pollutants to minimize exposure to stormwater: <br />ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE <br />2. Describe practices for storage of pesticides, herbicides, insecticides, fertilizers, treatment chemical, and landscape materials: <br />ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZED EXPOSURE <br />3. Describe practices for storage and disposal of hazardous materials or toxic waste (e.g., oil, fuel, hydraulic fluids, paint solvents, petroleum -based products, wood preservative, additives, curing compounds, and acids) according <br />to Minn. R. ch. 7045, including restricted access and secondary containment: <br />ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS. <br />4. Describe collection, storage and disposal of solid waste in compliance with Minn. R. ch. 7035: <br />ALL CONSTRUCTION DEBRIS AND SOLID WASTER WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS <br />5. Describe management of portable toilets to prevent tipping and disposal of sanitary wastes in accordance with Minn. R. ch. 7040: <br />SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS NEEDED BY THE PROVIDER. <br />6. Describe spill prevention and response for fueling and equipment or vehicle maintenance: <br />EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT SHALL BE CHECKED FOR LEAKS. <br />7. Describe containment and disposal of vehicle and equipment wash water and prohibiting engine degreasing on the site: <br />ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE <br />8. Describe storage and disposal of concrete and other washout wastes so that wastes do not contact the ground: <br />ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE. <br />FINAL STABILIZATION (IV.G) <br />1. DESCRIBE METHOD OF FINAL STABILIZATION (PERMANENT COVER) OF ALL DISTURBED AREAS: <br />FINAL STABILIZATION WILL BE ACCOMPLISHED WITH PAVEMENT, SOD AND LANDSCAPE MATERIALS. <br />2. DESCRIBE PROCEDURES FOR COMPLETING FINAL STABILIZATION AND TERMINATING PERMIT COVERAGE (SEE PART IV.G.1-5): <br />UPON STABILIZATION DESCRIBED ABOVE, THE CONTRCTOR AND OWNER SHALL MUTUALLY TRANSFER THE NPDES PERMIT TO THE NEXT OWNER WITH DOCUMENTS DESCRIBING THE NATURE OF <br />TERMINATION PROCEDURE. <br />DOCUMENTATION OF INFEASIBILITY: (IF APPLICABLE) <br />C�OIVRO <br />S�0�e <br />C7 G 00 M 1p, <br />Civil Engineering • Surveying • Landscape Architecture <br />4931 W. 35th Street, Suite 200 <br />St. Louis Park, MN 55416 <br />civilsitegroup.com 612-615-0060 <br />F_ <br />U <br />W <br />O <br />U <br />J <br />J <br />ZLO <br />N <br />U7 <br />W <br />Z <br />Q <br />F_ <br />0 <br />Q <br />Z <br />W <br />Z <br />Q <br />a <br />LU <br />0 <br />Z <br />Q <br />LU <br />2 <br />O <br />Z <br />a <br />O <br />= <br />W <br />o <br />Z <br />(� <br />Q <br />♦^ <br />� <br />� <br />O <br />v <br />0(.0 <br />O <br />V <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />- Matthew R. Pavek <br />DATE 02.21.2020 LICENSE No. 44263 <br />ISSUE/SUBMITTAL SUMMARY <br />DRAWN BY: KT, ND, JD REVIEWED BY: PS <br />PROJECT NUMBER: 19296 <br />REVISION SUMMARY <br />DATE I DESCRIPTION <br />WPPP - ATTACHMENTS <br />SW1 04 <br />4/17/2020 14:10:53 <br />COPYRIGHT CIVIL SITE GROUP I <br />