My WebLink
|
Help
|
About
|
Sign Out
Home
2020.08.17 RESO 2020-44 Site Plan for SW Corner of 140th and Fenway Ave
Hugo
>
City Council
>
City Council Resolutions
>
2020 CC Resolutions
>
2020.08.17 RESO 2020-44 Site Plan for SW Corner of 140th and Fenway Ave
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:53:28 AM
Creation date
8/24/2020 11:53:28 AM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
8/17/2020
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2020-44 <br />Page 2 <br />9. The applicant shall submit the final building material samples and colors for the <br />building to be reviewed and approved by staff. The materials shall be compatible and <br />cohesive with the existing building on Lot 1, Block 1, Roy Molitor 3rd Addition. <br />10. The architecture of the building shall be revised to show a more clearly defined main <br />entrance by using other architectural elements or providing more glass/windows in <br />that area. <br />11. The proposed metal awing design shall be reviewed and approved by staff. <br />12. The internal roof drainage system that shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br />13. The trash receptacles shall be stored inside the building. <br />14. Cross access and maintenance agreement between the subject lot and Lot 1, Block 1, <br />Roy Molitor 4th Addition for the shared access shall be reviewed and approved by <br />staff. The document shall be recorded against the property. <br />15. Easement and maintenance agreements between the subject lot and Lot 1, Block 1, <br />Roy Molitor 4 h Addition for the stormwater ponds and utility extensions shall be <br />reviewed and approved by staff. The document shall be recorded against the property. <br />Prior to issuance of a Certificate of Occupancy: <br />16. The applicant shall restore any part of the Fenway Boulevard Trail that is damaged <br />during construction. <br />17. All roof top and ground mechanical equipment must be screened from view of <br />adjacent properties. Staff shall perform an inspection when equipment is installed to <br />ensure compliance with City code. <br />18. All required landscaping shall be fully installed. <br />19. Drainage and utility easements shall be dedicated to the City over the wetland, <br />stormwater management facilities, and utility extensions. <br />20. A maintenance agreement for the stormwater management facilities between the City <br />and the applicant shall be reviewed. and approved by the City then recorded against <br />the property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.