My WebLink
|
Help
|
About
|
Sign Out
Home
2020.08.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.08.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:00:49 PM
Creation date
9/15/2020 12:57:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/17/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Roy Molitor 4th Addition 18 <br />EXHIBIT C <br /> <br />ESCROWS, FEES, AND CHARGES <br /> <br /> a) Escrow for City Costs and Fees. Developer shall deposit sufficient escrow <br />with the City as outlined in Section A. 1. The required beginning balance in the account is <br />calculated at $10,071.00. This sum is calculated to be four percent (4%) of the estimate of the <br />required improvements to be installed to serve the development, plus $5,000 which is the minimum <br />balance required in the account, which has been satisfied. <br /> <br /> b) Cash Escrow or Letter of Credit. Developer shall provide a financial <br />guarantee to the City, in the form of a cash escrow or letter of credit, in the amount equal to ten <br />percent (10%) of the cost to grade the property, plus one hundred twenty-five percent (125%) of the <br />estimated amount of the required roadway and utility improvements to be installed to serve the <br />development. This amount has been calculated by the City’s Engineer to be $158,468.75. This <br />amount may be reduced upon request of the Developer and approved by the City. At no point shall <br />the Letter of Credit be reduced below 10% of the original amount. The City shall have the right to <br />retain the financial guarantee until the improvements have been completed to the satisfaction of the <br />City and the warranty period has expired. <br /> <br /> c) Storm Water Trunk Fee. The Developer shall pay the City a Storm <br />Water Trunk Fee in the amount of $20,216. This sum is calculated to be $0.07 per square foot for <br />the 6.62 acres (288,803 square feet) of Net Developable Area within the Plat. This fee shall be paid <br />before the Final Plat is signed by the City. <br /> <br /> d) Storm Water Ponding Fee. The storm water ponding requirement has <br />been met by the Developer within the plat. No storm water ponding fee will be applied. <br /> <br /> e) Snow Plowing. The Developer agrees to pay a one-time lump sum <br />cash escrow to the City to cover the cost of snow plowing the roads within the plat, during the first <br />snow season, before the roads are formally accepted by the City of $.50 per lineal foot. The <br />Developer shall post a cash escrow with the City in the amount of $125.00 ($0.50 x 250 ft = <br />$125.00). <br /> <br /> f) Pavement Maintenance Fee. The Developer shall post a one-time <br />lump sum cash escrow with the City in the amount of $1,000.00 to cover the cost of the first <br />pavement maintenance method of the streets in the Plat. This sum is calculated to be $4.00 per foot <br />for the 250 feet of streets within the Plat. <br /> <br /> g) Park Dedication. Park Dedication for the plat was satisfied as part of <br />a previous development approval, and no additional park dedication is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.