My WebLink
|
Help
|
About
|
Sign Out
Home
2020.08.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.08.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:00:49 PM
Creation date
9/15/2020 12:57:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/17/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2020-__ Page 2 c. The developer is responsible for improvements to Finale Avenue as required by Resolution 2014-05 approving the PUD for LaValle Fields, except as otherwise modified in the development agreement for Hugo Gardens. Additionally, i. The Finale Avenue street design shall be revised to show on street parking on the east side of the street. ii. The Finale Avenue street width shall be increased to 32-feet to provide space for the on street parking. iii. The plans should show the planned trail east of Finale Avenue. iv. The developer is responsible for improvements to Finale Avenue North, as shown on the plans and amended with the resolution, from 146th Street North to the north end of the right-of-way dedicated for Finale Avenue on the plat. The entire length of the Finale Avenue North realignment through the project shall be constructed with the first layer of bituminous prior to the issuance of a Certificate of Occupancy for the 1st building. d. The City shall agree on a cost share for stormwater management and stormwater reuse. e. The developer shall evaluate the feasibility of a stormwater reuse project for the development. If a stormwater reuse project is feasible, as evaluated by the City, it shall be constructed. This may include the connection to another stormwater reuse system. The developer shall enter into an agreement with the City for the annual costs of the stormwater reuse system, if connecting to another system. f. The PUD amendment includes approval of the following building setbacks: i. Street front: 10 feet ii. Side: 10 feet iii. Rear: 25 feet g. The PUD amendment includes approval of the following parking setbacks: i. Street front: 10 feet ii. Side: 5 feet iii. Rear: 5 feet. h. The architectural plans must be revised to address the following: i. The applicant shall expand the color palette to provide additional colors for the buildings to eliminate monotony within the development. The applicant will work with staff to finalize the design and color palette. ii. The applicant shall provide a final color palette and physical material sample for City review and approval. iii. All ground-level mechanical units shall be low profile and located to the side or rear of the building and shall be screened from view of adjacent properties. iv. The gutters and drainpipes shall be integrated into the building design and shall be reviewed and approved by staff. i. The landscaping plan must be revised to address the following: i. An irrigation plan must be provided. ii. Retaining wall and fence details must be provided.
The URL can be used to link to this page
Your browser does not support the video tag.