Laserfiche WebLink
<br /> <br /> <br />Development 8 <br />topsoil prior to seeding. <br /> b) Upland areas shall be seeded in accordance with the grading, drainage, and <br />landscape plans listed in Exhibit A. The rate of application shall be one hundred (100) pounds per <br />acre. Areas seeded shall be mulched with Type 1 mulch at a rate of two (2) tons per acre. All mulch <br />shall be disk anchored. <br /> c) Wetlands, wetland replacement areas and storm water ponding areas shall be <br />seeded with MN/DOT Seed Mixture 25B, or as required by the permitting regulatory agency. The <br />minimum rate of application shall be thirty (30) pounds per acre, or as recommended by the supplier. <br /> d) All seeded areas shall be maintained for the term of this Agreement. Upland <br />areas shall be mowed as necessary or as directed by the City Engineer. <br /> e) All disturbed areas within the development shall be maintained to limit <br />vegetation growth to less than ten (10) inches except designated natural areas or designated open <br />spaces as shown on the approved plans. <br /> <br /> 15. Safe Rooms. The Developer shall require all builders to offer a safe room as an <br />option to any and all potential homebuyers. All safe rooms offered and built within the City must <br />meet or exceed FEMA requirements and standards. <br /> <br />B. ESCROWS, CHARGES AND UTILITY OVERSIZING: <br /> <br /> Developer shall pay the escrows, fees and charges listed on Exhibit C. <br /> <br />C. SPECIAL PLANNING REQUIREMENTS: <br /> <br /> The development shall be built and maintained in accordance with the planning <br />requirements listed on Exhibit A hereto, and any miscellaneous requirements listed on Exhibit B <br />hereto. <br /> <br />D. ADMINISTRATIVE REQUIREMENTS: <br /> <br /> 1. Miscellaneous Provisions. Developer specifically understands that this <br />subdivision approval is given subject to the following requirements: <br /> <br /> <br /> a) Expiration. The final plat documents must be submitted to the City <br />Council within one hundred twenty (120) days of preliminary plat approval or else the preliminary <br />plat approval shall be null and void and the final plat must be recorded with the Washington County <br />Recorder (and the mylar "hardshells" must be fully executed) within sixty (60) days of the Council <br />motion giving final plat approval or else said approval shall be null and void. All fees relating to this <br />subdivision shall be paid by the Developer, including the cost of recording documents with