My WebLink
|
Help
|
About
|
Sign Out
Home
2020.08.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.08.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 1:00:49 PM
Creation date
9/15/2020 12:57:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/17/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roy Molitor 4th Addition – Pre Plat, Final Plat, CUP Amendment, Easement Vacation, and Site Plan Page 5 <br />Fencing and Screening <br /> <br />The applicant is proposing roof top mechanical equipment for the building. The plans show a 2 <br />foot – 10 inches raised parapet wall from the roof line of the building. All roof top mechanical <br />equipment shall be adequately screened from view. It is in staff’s opinion that the parapet will <br />screen most of the roof top equipment. Staff has added that there will be an inspection during <br />construction and that as a condition of approval prior to the issuance of a certificate of occupancy <br />the equipment shall be screened. <br /> <br />The applicant has indicated that the trash stored inside the building or screened with materials <br />consistent with the building materials. <br /> <br />The applicant is not proposing any additional fencing around the lot as this time. <br /> <br />Streets and Access <br /> <br />The site has access from a proposed to be constructed small section of 140th Street and Fenway <br />Boulevard North. The applicant is proposing two entrances into the site. Staff is comfortable <br />with the access to the site. The City has received a funds from a previous development to go <br />towards the extension of 140th Street. These funds will be utilized for a portion of the costs <br />associated with the extension of 140th Street. The total amount of the funds is $91,575. Staff has <br />added a condition in the campus development CUP that the if there is another access to the 140th <br />Street proposed, the applicant is responsible for the cost and construction of 140th Street to the <br />west property line of the plat. <br /> <br />The 2040 Comprehensive Plan shows 140th Street as a future road. The applicant has contributed <br />money to the City for their share for the future construction of the 140th Street. This was <br />completed with the Roy Molitor Addition final plat application approval. The applicant is <br />proposing to use money for construction of a small section of the road. When this section 140th <br />Street is constructed, the applicant will be able to connect to it with a driveway. A driveway <br />permit would be required. <br /> <br />Parking <br /> <br />According to the Section 90-253 PARKING, based on the use and the size of the building 23 <br />parking stalls are required by ordinance. The applicant is proposing 34 parking stalls for the site, <br />which meets the ordinance standards for the use of the building. <br /> <br />Trails <br /> <br />There is a City trail along Fenway Boulevard North. There is a proposed trail shown on the <br />Trails Plan in the 2040 Comprehensive Plan on the north side of 140th Street North. Staff will <br />work with the applicant to see if it makes sense to include this small section of trail with the <br />construction of the road. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.