Laserfiche WebLink
UP <br />DN <br />DN <br />DN <br />DNDN <br />UP <br />UP <br />3 <br />1 <br />B C D E <br />2 <br />2.1 <br />2.2 <br />F4 <br />A5.201 <br />_______ <br />F7 <br />A5.201 <br />_______ <br />F4 <br />A5.202 <br />_______ <br />MEZZ STORAGE <br />A200 <br />MEZZ MECH <br />A201 <br />A201A <br />1.1 18'-8"36'-4"3'-8"22'-8"31'-0"19'-10" 16'-0" <br />F7 <br />A5.202 <br />_______ <br />_______C3 <br />A4.901 <br />_______B6 <br />A4.201 <br />F3 <br />A5.202 <br />_______ <br />F1 <br />A5.201 <br />_______ <br />F3 <br />A5.201 <br />_______ <br />_______C3 <br />A4.901 <br />A201BW2 <br />W2 <br />W2 <br />F6 <br />A5.201 <br />_______ <br />10 <br />10 <br />10 <br />10 <br />10 <br />10 <br />10 <br />F1 <br />A5.202 <br />_______C7 <br />A5.202 <br />_______ <br />_______B2 <br />A4.201 <br />19 <br />19 <br />10 <br />15 <br />15 <br />L1 <br />16'-4" 8'-0" 13'-5" 4'-0" 15'-6" 4'-0" 15'-3" 4'-0" 2'-2" <br />18'-1" 4'-0" 15'-6" 4'-0" 15'-3" 4'-0" 2'-2"2'-2"5'-8"4'-4"5'-8"4'-4"5'-8"W1W1W1 <br />W1W1W1 <br />W2 <br />W2 <br />W2 <br />2'-2"5'-8"4'-4"5'-8"4'-4"5'-8"4'-0"5".4'-0"7'-4"2'-5" <br />GA2 <br />GA2 <br />FLOOR PLAN KEY NOTES: <br />1 DOOR ACTUATOR; SEE DETAILS FOR MOUNTING <br />HEIGHTS. <br />2 BOLLARDS AT INTERIOR AND EXTERIOR OF OVER <br />HEAD DOORS, TYP - SEE DETAIL B1/A6.101. <br />3 TUB SINK - SEE MECHANICAL <br />4 CORNER GUARD <br />5 EMERGENCY EYE WASH. SEE MECH. <br />6 NOT USED <br />7 FIRE ALARM ANUNCIATOR PANEL, FLUSH MOUNTED <br />IN GYP WALL, SEE ELEC <br />8 LOCATION OF SEMI-RECESSED DEFIBRILLATOR <br />CABINET (NIC) <br />9 LOCATION OF STACKED WASHER AND <br />DRYER (NIC) <br />10 MECHANICAL EQUIPMENT PAD. SEE MECH FOR MORE <br />DETAIL. <br />11 STEEL PIPE RAIL / RAILING PAINTED <br />12 ACCESSIBLE BENCH BY LOCKER <br />13 VEHICLE LIFT, COORDINATE WITH SUPPLIER FOR <br />EXACT DIMENSIONS <br />14 TRENCH DRAIN, SEE DETAIL ; SEE ALSO <br />MECH <br />15 8'-0" TALL WIRE MESH PARTITION. COORDINATE WITH <br />ROOF DECK AND STRUCTURE ABOVE <br />16 TV MOUNT; SEE INTERIOR ELEVATION FOR HEIGHT. <br />17 GRATED FLOOR SINK, SEE DETAIL E5/A4.706 ; SEE <br />ALSO MECH <br />18 FLOOR DRAIN. COORDINATE WITH MECHANICAL <br />19 MECHANICAL EQUIPMENT CURB. SEE MECH FOR <br />MORE DETAIL. <br />20 TACK BOARD; SEE E7/A4.706 . <br />21 TRASH AREA ENCLOSURE, SEE CIVIL <br />22 CARD READER, SEE ELEC FOR LOCATION <br />23 REFER TO MECH FOR LOCATION OF FLAMMABLE <br />WASTE TRAP <br />24 REFER TO MECH FOR LOCATION OF SUMP PIT <br />25 PIT FOR FUTURE LIFT WITH TEMPORARY CONCRETE <br />SLAB ON SAND INFILL, SEE STRUCTURAL, SEE <br />DETAIL D5/A5.502 <br />26 STEEL COLUMN, SEE STRUCTURAL <br />F3/A4.706 <br />FOR FRAME DEPTH, ONLY EXCEPTIONS TO THE FOLLOWING TABLE ARE SCHEDULED: <br />GYPSUM BOARD PARTITIONS: THROAT OF FRAME TO MATCH WALL THICKNESS. <br />MASONRY PARTITIONS: <br />4" WALL: 3 3/4" FRAME <br />6" WALL: 5 3/4" FRAME <br />8" AND GREATER WALL: 7 3/4" FRAME <br />FRAME DEPTHS ARE SCHEDULED IN NOMINAL DIMENSIONS. SEE FRAME/ DOOR TYPES (DETAIL <br />SECTION 51000) FOR CORRESPONDING ACTUAL DIMENSIONS. <br />ALL DOORS ARE 1 3/4" THICK UNLESS OTHERWISE NOTED. <br />FOR GLASS TYPES, ONLY EXCEPTIONS TO THE FOLLOWING TABLE ARE SCHEDULED: <br />INTERIOR NON RATED: <br />CLEAR (SAFETY WHEN REQUIRED BY TABLE IN GLAZING SPECIFICATION.) <br />INTERIOR AND EXTERIOR RATED: <br />FIRE RATED <br />EXTERIOR NON-RATED: <br />CLEAR INSULATED (SAFETY INSULATED WHEN REQUIRED BY TABLE IN GLAZING SPECIFICATION.) <br />SEE SHEET AX.XX FOR FRAME TYPES. <br />SEE SHEET AX.XX FOR DOOR TYPES. <br />AT DOOR SCHEDULE, LABEL DESIGNATION "45/20" INDICATES: <br />FOR ALL OPENINGS WITH SIDE LITES AND SCHEDULED TO BE RATED FOR 20 MINUTES, THE <br />DOOR AND ANY GLASS WITHIN THE DOOR IS TO BE RATED FOR 20 MINUTES; THE FRAME AND <br />ADJACENT SIDELITE(S) GLASS AND FRAME IS TO BE RATED FOR 45 MINUTES." <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />DOOR SCHEDULE GENERAL NOTES <br />SEE DETAIL 54012 FOR USE WITH ALTERNATE #1 <br />SEE DETAIL 43018 FOR USE WITH ALTERNATE #11. <br />2. <br />DOOR SCHEDULE REMARKS <br />PROVIDE FIRE NUMBER AT EXTERIOR DOORS <br />DOOR NUMBER IN "_". <br />3. <br />1. PROVIDE CERAMIC TILE TO A HEIGHT OF 5'-0" WITH EPOXY PAINT ABOVE, EPT-6A <br />2. <br />3. <br />4. <br />5. <br />PAINT CEILING AND ALL EXPOSED STRUCTURE, PIPING, CONDUIT, MECHANICAL DUCTS, <br />VENTS, ETC, PT 8. <br />ROOM FINISH SCHEDULE REMARKS <br />SLOPE CONC. FLOOR TOWARDS FLOOR DRAINS. SEE PLANS FOR FLOOR SLOPING <br />INFORMATION. <br />EPOXY PAINT TO 7'-2" HIGH. <br />SEE INTERIOR ELEVATION FOR WALL GRAPHIC. <br />F <br />E <br />D <br />C <br />B <br />A <br />1 2 3 4 5 6 7 8 <br />A <br />MN <br />NorthCheck: <br />Drawn: <br />Date: <br />Comm: <br />License Number: <br />I hereby certify that this plan, specification or report was prepared by <br />me or under my direct supervision and that I am a duly Licensed <br />under the laws of the State of <br />Scale: <br />Date <br />9/29/2020 4:33:38 PMC:\Users\hkoesters\Documents\202063_WBL BUS GARAGE_HKoesters.rvtAs indicatedCentral: \\Wae-srv-mn.woldae.com\StPaul\ISD624\Bus Garage\202063 New BusGarage\02_ARCH\Revit\202063_WBL BUS GARAGE.rvtINDEPENDENT SCHOOL <br />DISTRICT #624 <br />TRANSPORTATION <br />FACILITY <br />A2.02 <br />MEZZ LEVEL <br />FLOOR PLAN <br />4855 Bloom Avenue <br />White Bear Lake, MN 55110 <br />13411 Fenway Blvd N <br />Hugo,MN 55038 <br />EBL <br />HAK <br />8/14/2020 <br />202063 <br />Minnesota <br />8/14/2020 <br />Paul Aplikowski <br />42737 <br />ARCHITECT <br />0 <br />1/8" = 1'-0" <br />BASEMEZZF2 <br />6' 12' <br />PLAN GENERAL NOTES <br />1. ALL PLAN DIMENSIONS ARE NOMINAL TO FACE OF <br />WALL. WALL THICKNESSES ARE SHOWN NOMINAL, SEE <br />WALL TYPES FOR ACTUAL THICKNESS. <br />2. ALL GYP. WALLS ARE TO BE 5 INCHES THICK UNLESS <br />OTHERWISE NOTED. <br />3. ALL CONCRETE BLOCK WALLS ARE TO BE 8 INCHES <br />THICK UNLESS OTHERWISE NOTED. <br />4. COORDINATE SIZE AND LOCATION OF ALL DUCT AND <br />SHAFT OPENINGS IN WALLS AND FLOORS W/ MECH. <br />AND ELEC. PROVIDE ALL REQUIRED LINTELS FOR <br />OPENINGS. SEE LINTEL SCHEDULE. <br />5. FIELD VERIFY ALL MILLWORK OPENINGS. <br />6. SET FLOOR DRAINS 3/4" BELOW FINISHED CONCRETE <br />FLOORS UNLESS OTHERWISE NOTED. PROVIDE <br />CONSISTENT SLOPE FROM WALL TO DRAIN BY <br />SLOPING CONCRETE, MIN. 1/4" PER FOOT. <br />7. VERIFY LOCATION, SIZE AND QUANTITY OF ALL <br />MECHANICAL AND ELECTRICAL EQUIPMENT PADS. <br />8. ALL DOOR/SIDELITE OPENINGS TO BEGIN 4" FROM <br />ADJACENT WALL UNLESS OTHERWISE NOTED. <br />9. ALL GYP. WALLS ARE CENTERED ON GRID UNLESS <br />OTHERWISE NOTED. <br />10. FIRE RATED WALLS ARE INDICATED ON CODE PLANS. <br />ROOM FINISH SCHEDULE GENERAL NOTES <br />1. SEE DETAILS OF CONSTRUCTION FOR ABBREVIATIONS <br />2. IF ALL WALLS IN ROOM HAVE THE SAME FINISH, THE "N <br />WALL-TYP" COLUMN WILL BE USED. <br />3. DISCREPANCIES BETWEEN THE ROOM FINISH <br />SCHEDULE AND DRAWINGS SHALL BE REPORTED TO <br />THE ARCHITECT FOR FINISH DETERMINATION. <br />4. PROVIDE VINYL BASE AT CASEWORK. <br />5. REFER TO MATERIAL FINISH/ COLOR SCHEDULE FOR <br />SPECIFIC FINISH TYPES AND COLORS. <br />6. FOR CEILING MATERIAL WHEN MORE THAN ONE <br />CEILING MATERIAL OCCURS THE CEILING FINISH IS <br />INDICATED THUS: "/". <br />7. PROVIDE GYPSUM BOARD SOFFIT ABOVE CASEWORK. <br />(SEE CASEWORK ELEVATIONS AND REFLECTED <br />CEILING PLANS.) <br />ROOM FINISH SCHEDULE <br />ROOM NO ROOM NAME FLOOR BASE <br />N WALL - TYP E WALL S WALL W WALL <br />REMARKSMATL FIN MATL FIN MATL FIN MATL FIN <br />A200 MEZZ STORAGE GYP BD WIRE MESH <br />PARTITION <br />PRECAST PRECAST <br />A201 MEZZ MECH CONC PRECAST GYP BD GYP BD PRECAST <br />DOOR / OPENING SCHEDULE <br />DOOR NO <br />DOOR / OPENING LABEL/ <br />RATING <br />OVERALL <br />WIDTH <br />FRAME <br />GL <br />MOUNTING CONDITIONS <br />HDW GRP REMARKSTYPE QTY WIDTH HEIGHT MATL TYPE DEPTH MATL HEAD JAMB SILL <br />A201A F 2 3'-0" 7'-0" HM -- 6'-4" FR 2 -- HM -- D1/A4.801 D1/A4.801 21 <br />A201B F 1 3'-0" 5'-8" HM -- 3'-4" FR 1A -- HM -- A1/A5.602 C1/A5.602 D2/A5.504 04 <br />Revisions <br />Description Date Num <br />Addendum #1 Aug, 25, 2020 1 <br />Addendum #3 September 4, 2020 2 <br />Addendum #5 September 11 3