My WebLink
|
Help
|
About
|
Sign Out
Home
2020.10.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.10.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 9:27:47 AM
Creation date
10/21/2020 9:26:25 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/5/2019
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Exhibit B – Scope of Services Page 4 <br />B.2.2 Regulated Materials Inventory. <br />Consultant will complete a room-by-room inventory of regulated materials at each Site <br />building that may require special handling or disposal prior to demolition. Consultant will also <br />note other items present that may require special attention prior to or during demolition <br />including; wells, septic systems, above/underground tanks, hoists, and oil water separators. <br /> <br />B.2.3 Final Documentation and Reporting. <br />Consultant will summarize the results of the Destructive ARM Surveys in final reports. One <br />report will be generated for each of the three buildings. At a minimum, the reports will include <br />the following: <br />• Scope of work <br />• Sampling methods and procedures <br />• Figures identifying ACM sample locations <br />• Regulated materials inventory <br />• Investigation results including locations and quantities of identified ACM <br />• Conclusions and recommendations <br /> <br />B.2.4 Assumptions. <br />The following conditions are assumed for the ARM Assessment. <br />• Client will arrange and provide Site access. <br />• Buildings will be vacant at the time of the assessment <br />• Destructive sampling methods will be used. <br />• Any damage caused to building materials during sampling will not be <br />repaired/replaced by Consultant, including roofing materials. <br />• It is anticipated that the following additional samples will be collected and analyzed <br />under a standard 7 to10-day laboratory turnaround time: <br />o Small Storage Garage – ten (10) asbestos samples <br />o Large Storage Garage – twenty (20) asbestos samples <br />o Open Air Picnic Shelter – ten (10) asbestos <br />• Additional asbestos samples will be charged at a rate of $6 per sample. <br />• No lead-based paint samples will be collected. <br />• One ARM Assessment report will be generated per building (3 total reports). <br />• The Client will provide one review of each final report. <br /> <br /> <br />ARTICLE B.3 – ADDITIONAL SERVICES <br />Additional services shall be requested and authorized in writing and will be billed hourly according to the <br />current rate schedule. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.