Laserfiche WebLink
Schwieters Addition <br />Hugo, MN <br />Project Narrative <br />Schwieters Addition is a proposed plat that is currently an approved campus development consisting of <br />1 existing commercial building and 3 additional approved building sites located on Lot 1 Block 1, Roy <br />Molitor Addition 3rd Addition. The Campus development and Conditional Use Permit were approved by <br />City Council on May 7, 2018. <br />Request <br />We are seeking approval for Preliminary Plat and Final Plat allowing the campus development to be <br />subdivided into 2 lots that allows for the sale and build of one of the approved campus building sites. <br />We are also seeking Site Plan approval for that new building to be located on the new lot that would <br />potentially be subdivided. <br />The new plat of the development conforms with the City Code and allowed setbacks of the buildings. <br />There will be cross easements for utilities, storm water ponding, and access easements, between the <br />two lots. <br />The new plat also considers the extension of 140t" street with an access into Lot 2 of the new plat. The <br />City and ourselves are working together on design for the construction of this extension. <br />This application will also conform with the current CUP that was approved by Council on May 7, 2018. <br />Our Site Plan application is for 22,580 SF of Office/Warehouse and 4600 SF of parking garage for delivery <br />vehicles. <br />Storm Water —The development currently utilizes one basin/ponding area for the entire site. This will <br />still be owned and maintained by Victor Land Holdings. <br />Architectural Design —The design and colors of the building conform with current architecture adjacent <br />to the proposed building. The garage door on the west side is used for dumpster storage and some <br />deliveries to be unloaded by forklift. <br />Landscaping — Additional landscape above city requirements was added to the north end of the building <br />that provides additional screening for the residential community to the north. Existing landscape <br />materials that are onsite will be moved to the north side of the storm water pond for additional <br />screening. <br />Exterior Storage — There is no exterior storage of building materials. Equipment and dumpsters are <br />located within the building structure. Delivery vehicles are parked within the enclosed garage. The west <br />side loading dock may have a semi -truck that is parked overnight for unloading. Fencing/gate is not <br />planned but may be added to secure the west side of the building. <br />Victor Land Holdings, LLC — Project Narrative <br />