Laserfiche WebLink
7. <br />0 <br />U <br />C7 <br />Z <br />W <br />m <br />U) <br />0 <br />00 <br />00 <br />N <br />ID <br />0 <br />N <br />W <br />U) <br />W <br />W <br />W <br />00 <br />wsb <br />September 17, 2020 <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Grundhofer's Old Fashion Meats Expansion <br />WSB Project No. 016691-000 <br />Dear Ms. Juba: <br />We have reviewed the site plan submittal for the Grundhofer's site located east of Highway 61 <br />approximately 1,100 feet north of 152"d Street. In particular, we have reviewed the following plans <br />related to this particular request: <br />• Civil Plan Sets revised 8/28/20 by Rehder & Associates, Inc. <br />• Stormwater Management report dated 8/28/20 by Rehder & Associates, Inc. <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br />Grading, Street, and Utility Plans <br />1. The site is proposed to utilize the existing access while expanding the parking and building. <br />2. The existing parking area does not contain curb and gutter and the expansion of the lot <br />coupled with the sights existing grades makes it not practical to add curb and gutter for this <br />site. <br />3. No changes are proposed for the sanitary and water services to the parcel as part of this <br />project. <br />4. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br />Stormwater Management <br />The additional impervious added to this site is under 10,000 sf which is the threshold for <br />meeting stormwater management requirements, however due to the proximity to the ditch to <br />the east they trigger an erosion control rule requiring stormwater water management <br />requirements based on disturbed area. <br />Freeboard from the HWL is met. <br />Additional stormwater plan and model comments have been provided to applicant and will <br />need to be addressed in future submittals for documentation and permitting purposes. Staff is <br />comfortable the site will be meeting stormwater management requirements with the final plan <br />submittal. <br />A stormwater maintenance agreement and drainage and utility easements will be required <br />for the stormwater basin on the site. <br />SACommunity Development\Planning Commission\Packets\2020\09.24.20\016691-000 LTR RJuba- Grundhofers 091720.docx <br />