Laserfiche WebLink
0 <br />U <br />Z <br />w <br />m <br />0 <br />Lo <br />00 <br />00 <br />N <br />0 <br />CD <br />W <br />D <br />U) <br />W <br />W <br />U) <br />m <br />W <br />00 <br />wsb <br />October 1, 2020 <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan Review <br />White Bear Lake Transportation Facility <br />WSB Project No. 016105-000 <br />Dear Ms. Juba: <br />We have reviewed the site plan submittal for the proposed White Bear Lake Transportation <br />Facility located east of Fenway Boulevard at 134th Street. In particular, we have reviewed the <br />following plans related to this particular request: <br />• Civil Plan Sheets dated 8/14/20 by Larson Engineering <br />• Architectural Plan Sheets dated 8/14/20 by Wold Architects and Engineers <br />• Stormwater Report dated 8/14/20 by Larson Engineering <br />• Soil Borings Completed by Twin Cities Testing Dated 3-17-06 <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br />Grading, Street, and Utility Plans <br />1. The site is proposed to have two accesses. Both are located on Fenway Boulevard, one at <br />134th Street and the second, approximately 300' south of 134th Street. Proposed access <br />locations are acceptable. <br />2. Water service to the site will be achieved by either tapping the existing 12" watermain running <br />along the northbound driving lane of Fenway Boulevard or by connecting to an existing 6" or <br />8" water service stub across from 134t" Street on Fenway Boulevard. The applicant is <br />proposing an 8" loop around the building with three hydrants for fire protection. <br />3. Sanitary sewer service is available to the site from an existing 8" sanitary sewer stub across <br />from 1341" Street on Fenway Boulevard. <br />4. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br />Stormwater Management <br />5. The stormwater water quality and rate control requirements are proposed to be met through <br />the use of onsite infiltration basins. The basins are sized to meet the City's water quality <br />requirements however the site is currently not meeting the City's 100-year rate control <br />limitation of 0.1 cubic feet per second per acre of drainage, but we are working with the <br />applicant with regards to modifications to their proposed plan. <br />SAUsers\R_Juba\DEVELOPMENT PROJECTS\WBL Transportation Facility\Site Plan\Engineer Comments\016105-000 LTR RJuba- WBL Transportation Facility <br />Site Plan 100120.docx <br />