Laserfiche WebLink
FD FD FDFD <br />1.b <br />3.b <br />4.b <br />A.b B.b C.b D.b E.b <br />160'-0"75'-0"TENANT <br />'B1' <br />B1-100 <br />TENANT <br />'B2' <br />B2-100 <br />TENANT <br />'B3' <br />B3-100 <br />TENANT <br />'B4' <br />B4-100 <br />SPK <br />RISER <br />B-100 <br />SHARED <br />ENTRY <br />SHARED <br />ENTRY24'-8 3/4"49'-8 3/4"9'-2 3/4"8'-7 3/4" <br />40'-0 5/8"39'-8 1/4"39'-8 1/4"40'-0 5/8" <br />R.O. <br />3'-4" <br />1'-10 3/4" <br />12'-0" R.O.13'-10 1/8" <br />R.O. <br />3'-4" <br />1'-10 3/4" <br />12'-0" R.O.13'-10 1/8" <br />R.O. <br />3'-4" <br />1'-10 3/4" <br />12'-0" R.O.13'-10 1/8" <br />R.O. <br />3'-4" <br />1'-10 3/4" <br />12'-0" R.O.13'-10 7/8" <br />34'-0 5/8"12'-0" R.O.12'-0" R.O.34'-0 5/8"6'-6 1/8"A03.2 <br />3 <br />A03.2 <br />1 <br />A03.2 <br />4 <br />A03.2 <br />2 <br />UTILITY <br />B1-102 <br />UTILITY <br />B3-102 <br />TOILET <br />B1-101 <br />TOILET <br />B3-101 <br />UTILITY <br />B4-102 <br />TOILET <br />B4-101 <br />UTILITY <br />B2-102 <br />TOILET <br />B2-101 <br />05 <br />PREFAB. ALUM CANOPY ABOVE PREFAB. ALUM CANOPY ABOVE <br />WALL MOUNTED CONDENSER UNIT, <br />TYP. @ EA. UNIT AT ALL BLDGS <br />TENTATIVE UTILITY METER <br />LOCATION, TYP @ EA. UNIT <br />FIRST FLOOR PLAN - BLDG 'B' <br />BID DOCUMENTS <br />EAGLES LANDING <br />12/9/2020 <br />A02.2 <br />1/8" = 1'-0"1 FIRST FLOOR - BLDG 'B' <br />N