My WebLink
|
Help
|
About
|
Sign Out
Home
2021.02.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.02.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 10:43:03 AM
Creation date
2/1/2021 10:40:55 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1" / 12"1" / 12"1 <br />1 <br />1" / 12"1 11 <br />1 <br />VALLEY <br />18 <br />TYP <br />2 <br />TYP <br />2 <br />33 <br />5 <br />5 <br />TYP <br />6 <br />7 <br />TYP <br />6 <br />TYP <br />2 <br />TYP <br />2 <br />TYP <br />2 <br />TYP <br />2 <br />TYP <br />2 <br />5 <br />44 <br />51" / 12"1. CONTRACTOR TO VERIFY ALL CONDITIONS AND REPORT DISCREPANCIES TO THE <br />ARCHITECT OR OWNER, PRIOR TO BEGINNING CONSTRUCTION. <br />2. ALL PENETRATIONS THROUGH ROOF ASSEMBLIES SHALL BE SEALED AT BOTH SIDES <br />WITH MATERIALS APPROPRIATE TO THE ASSEMBLY. <br />3. PROVIDE BLOCKING AS REQUIRED TO SUPPORT ALL ROOFTOP EQUIPMENT PER <br />MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />4. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN. <br />ROOF PLAN GENERAL NOTES: <br />KEY PLAN <br />DRAWING NUMBER <br />DRAWING TITLE <br />CLIENT <br />I hereby certify that this drawing was prepared by <br />me or under my direct supervision and that I am a <br />duly registered architect under the laws of the <br />State of Minnesota. <br />Title: XXXX <br />Registration Number: XXXX <br />Date: XXXX <br />By: <br />Title: XXXX <br />a r c h i t e c t s <br />4201 cedar avenue so. -minneapolis, MN 55407 <br />tel. (612) 904-1332 -fax (612) 904-7366 <br />Hagen, Christensen & McIlwain <br />CIVIL ENGINEER <br />STRUCTURAL ENGINEER <br />MECHANICAL / ELECTRICAL ENGINEER <br />N O T F O R C O N S T R U C T IO N <br />178 E 9TH STREET <br />SUITE 200 <br />SAINT PAUL, MN 55101 <br />6120 EARLE BROWN DRIVE <br />SUITE 700 <br />MINNEAPOLIS, MN 55430 <br />7705 BUSH LAKE ROAD <br />EDINA, MN 55439 <br />1/14/2021 3:47:30 PMC:\Users\Josh\Documents\2066_CITY OF HUGO LIONS PARK _ CENTRAL MODEL _2019_HCMarch.rvta2.2 <br />5524 UPPER 146TH STREET N <br />HUGO, MN 55038 <br />LIONS PARK CIVIC <br />PAVILION <br />ROOF PLAN <br />1/8" = 1'-0"a2.2 <br />1 ROOF PLAN <br />NORTH <br />KEYNOTES - ROOF PLAN <br />Number Description <br />1 NEW ROOF SYSTEM ASSEMBLY AT METAL DECK STRUCTURE: <br />- FULLY ADHERED, SINGLE PLY 60 MIL EPDM ROOF MEMBRANE <br />- TAPERED INSULATION AT 1/4" PER FOOT TO DRAIN AS REQ'D <br />2 PREFINISHED METAL ROOF COPING <br />3 PRIMARY ROOF DRAIN <br />4 OVERFLOW ROOF DRAIN - SET 2" ABOVE MAIN ROOF DRAIN <br />5 PREFINISHED METAL SCUPPER 2" ABOVE ROOF DRAIN ELEVATION <br />6 TAPERED INSULATION CRICKET AT 1/4" PER FOR SLOPE TO DRAIN OR AS REQ'D <br />7 ROOF TRANSITION CURB WITH PREFINISHED METAL CAP <br />8 METAL STANDING SEAM ROOF ASSEMBLY <br />REVISION DATE DESCRIPTION
The URL can be used to link to this page
Your browser does not support the video tag.