My WebLink
|
Help
|
About
|
Sign Out
Home
2021.03.01 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.03.01 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:13:22 PM
Creation date
2/25/2021 4:04:29 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Meadows at Hugo\Preliminary Plat and PUD\Engineer Comments\LTR-r juba-Meadows at Hugo Pre Plat-PUD - 20210204.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM February 5, 2021 Ms. Rachel Juba Community Development Director City of Hugo 14669 Fitzgerald Avenue North Hugo, MN 55038 Re: Meadows at Hugo Preliminary Plat Review WSB Project No. 013597-000 Dear Ms. Juba: We have reviewed the Preliminary Plat submittal for the Meadows at Hugo. We have reviewed the following information related to this application: <br />• The Meadows at Hugo Preliminary Plat/PUD Submittal dated January 26, 2021 by Civil Site Group <br />• The Meadows at Hugo Stormwater Management Report dated January 26, 2021 by Civil Site Group <br />• The Meadows at Hugo Preliminary Plat dated January 26, 2021 by Civil Site Group <br />• The Meadows at Hugo Geotechnical Report dated December 4, 2020 by Haugo GeoTechnical Services <br />• The Meadows at Hugo Preliminary Plat/PUD Narrative dated January 26, 2021 by Civil Site Group <br />• Phasing Plan Based on the review of the documents, we offer the following comments related to this application: <br />General/Access <br /> 1. The subject property is located north of 159th Street, south of 165th Street and east of Water Tower No. 3. The parcel doesn’t have any public roadway frontage at this time, however with the Oneka Place Development, the City had received Outllot J that would allow for access to the subject property. The proposed access road to the site extends through this Outlot and through the City owned property where our water tower resides. 2. The extension of the roadway to the development site would be the developer’s responsibility. The intersection at this location would remain with no stop controls at 159th Street and a stop condition on Farnham Avenue from the north and south. 3. With access proposed from Farnham Avenue, the proposed plan does show future roadway connections to the north, which will ultimately connect with 165th Street. Staff concurs with not providing access to the property to the east as it is guided industrial, however utilities will be extended to this property.
The URL can be used to link to this page
Your browser does not support the video tag.