My WebLink
|
Help
|
About
|
Sign Out
Home
2020.12.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2020 CC Packets
>
2020.12.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 9:47:03 AM
Creation date
3/4/2021 9:44:00 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/7/2020
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scale in Feet <br />100’0’50’25’ <br />Hugo, Minnesota <br />August 14, 2020 | WSB Project number: 016114-000 <br />Goodview Avenue Trail Feasibility | Geneva Ave N to Egg Lake Rd <br />Option 2GOODVIEW AVE NEXISTING POWER <br />LINES <br /> SECTION C <br />OPTIONAL: 10’ WIDE <br />BOARDWALK IN <br />LIEU OF TRAIL (NO <br />WETLAND IMPACTS) <br />EXISTING PHOTOS <br />MAILBOX <br />FUTURE TRAIL <br />CONNECTION TO <br />HANIFL PARK <br />CROSSWALKK <br /> <br />GE <br />N <br />E <br />V <br />A <br /> <br />A <br />V <br />E <br /> <br />N <br />WETLAND <br />BOUNDARY <br />RESIDENTIAL <br />MONUMENT <br />SIGN <br /> SECTION D <br />WAYFINDING EXAMPLES <br />PEDESTRIAN ACTIVATED <br />SIGNAL AT CROSSWALK <br />MAY BE NECESSARY <br />8’ PAVED TRAIL WITH <br />5’ BLVD ON WEST SIDE <br />ONLY <br />K <br />Y <br /> <br />LOCATOR MAP <br /> SECTION C <br />ROUTE DESCRIPTION: <br />• 8’ WIDE SEPARATED BITUMINOUS TRAIL <br />BETWEEN GENEVA AVE N AND EGG LAKE <br />RD WITH 5’ WIDE BOULEVARD BUFFER <br />BETWEEN TRAIL AND ROAD <br />• CONNECTION TO FUTURE TRAIL <br />TO HANIFL THROUGH PROPOSED <br />DEVELOPMENT <br />PRO’S: <br />• SEPARATED TRAIL PROVIDES BETTER <br />USER EXPERIENCE <br />• IMPROVED SAFETY AND A FAMILY- <br />FRIENDLY ROUTE COMPARED TO ON- <br />STREET ROUTE OPTION <br />CON’S: <br />• HIGHER DEGREE OF IMPACTS TO <br />WETLANDS AND UTILITIES <br />• ACQUISITION OF ROW / EASEMENT MAY <br />BE NECESSARY <br />OPTION2A: 10’ WIDE BOARDWALK IN LIEU OF <br />TRAIL <br />PRO’S: MINIMIZES IMPACTS TO WETLANDS <br />AND HAS APPEALING CHARACTER WITH <br />POTENTIAL FOR VIEWING AREA BUMP-OUTS <br />CON’S: EXPENSIVE OPTION FOR <br />INSTALLATION, MAINTENANCE AND <br />REPLACEMENT THAT CAN BE SLIPPERY <br />DURING INCLEMENT WEATHER <br /> SECTION D <br />E <br />G <br />G <br /> <br />L <br />A <br />K <br />E <br /> <br />R <br />D <br />TRAIL <br />CONSTRUCTION <br />IMPACTS <br />CONCRETE WALK <br />CONNECTION <br />TO HARDWOOD <br />CREEK REGIONAL <br />TRAIL AT HWY 61 <br />K <br />impact <br />8’ WIDE BITUMINOUS TRAIL <br />10’ WIDE BOARDWALK <br />ON-STREET ROUTE <br />FUTURE TRAIL ROUTE <br />WETLAND IMPACTS <br />PARCELS <br />WETLAND BOUNDARY <br />LEGEND <br />MAILBOX <br />PROPOSED SECTIONS <br />PARCEL <br />LINES <br />TRAIL IMPACTS <br />TO EXISTING <br />WETLAND <br /> <br /> <br />TRAIL OPTION <br />WOULD IMPACT <br />EXISTING <br />CULVERT <br /> <br />T <br />WETLAND <br />BOUNDARY GOODVIEW AVE NWIDE PAVED SHOULDER <br />LANES ON BOTH SIDES <br />OF EGG LAKE RD <br />BETWEEN GOODVIEW <br />AVE N AND HWY 61 <br />PEDESTRIAN ACTIVATED <br />SIGNAL AT CROSSWALK <br />MAY BE NECESSARY <br />IMPACTS TO <br />EXISTING CULVERT <br />OPTIONAL: 10’ WIDE <br />BOARDWALK IN <br />LIEU OF TRAIL (NO <br />WETLAND IMPACTS) <br /> <br />8’ PAVED TRAIL <br />WITH 5’ BLVD ON <br />WEST SIDE ONLY <br />IMPACT TO <br />EXISTING OHP <br />POLE <br />S <br />M <br />CROSSWALK AT EGG <br />LAKE RD <br /> GOODVIEW AVE N | LOOKING SOUTH AT WEST DITCH GOODVIEW AVE N | LOOKING NORTH AT EAST DITCH <br />~ <br />~ <br />~
The URL can be used to link to this page
Your browser does not support the video tag.