My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 021121
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2021 PC Packets
>
PC PACKET 021121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 3:45:08 PM
Creation date
3/11/2021 3:29:33 PM
Metadata
Fields
Template:
Commissions
Meeting Date
2/11/2021
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(C Rov HOR a qoJ I =. <br />I <br />I <br />J <br />WETLAND <br />WETLAND X <br />/ WETLAND X <br />2224 SF <br />FILL <br />I 7 1 LOW FLOOR=918.00 <br />\ _ LOW FLOOR=918.50 (per lot cert, verify) a verify) <br />\ (per lot cert, verify) <br />159TH ST-I-T- <br />I <br />I / / <br />1 r)XA1 FI r)oR=919 no / <br />WETLAND LEGEND: <br />PROPERTY LINE <br />m m m m m CONSTRUCTION LIMITS <br />a m ( M p <br />II Civil Engineering ^ Surveying ^ Landscape Architecture <br />4931 W. 35th Street, Suite 200 <br />St. Louis Park, MN 55416 <br />civilsitegroup.com 612-615-0060 <br />1 j <br />WETLAND CALCULATIONS: <br />r — — <br />DITCH 7 <br />-- =Edge of Water <br />-------- — — — — <br />WEI <br />58, <br />WETLf <br />20 <br />CITY OF HUGO SITE SPECIFIC NOTES: <br />1. RESERVED FOR CITY SPECIFIC NOTES. <br />WETLAND TO REMAIN (RESTORATION OF <br />PARTIALLY DRAINED SUBP. 4) <br />WETLAND RESTORATION AREA (VEGETATIVE <br />RESTORATION OF FARMED WETLANDS SUBP. 5) <br />WETLAND BUFFER AREA (SUBP. 6) <br />WETLAND CREATION AREA (SUBP. 7) <br />WETLAND FILL AREA <br />TOTAL EXISTING WETLAND AREA = 258075 SF (5.92 AC) <br />WETLAND FILL AREA <br />FILL AREA A11=318 <br />FILL AREA A2=13167 <br />FILL AREA B=13889 <br />FILL AREA C=13104 <br />FILL AREA D2=20011 <br />FILL AREA D3=2077 <br />FILL AREA D4=1331 <br />FILL AREA G1=10645 <br />FILL AREA G2=705 <br />FILL AREA X=2224 <br />TOTAL FILL AREA=77471 (1.78AC) <br />WETLAND MITIGATION CREDIT ACTIONS <br />NEW CREATED WETLANDS (SUBP. 7) <br />CREATION AREA 1=17984 <br />CREATION AREA 2=7659 <br />CREATION AREA 3=5860 <br />CREATION AREA 4=31576 <br />CREATION AREA 5=21652 <br />TOTAL ON -SITE CREATION AREA=84731 (1.95 AC) <br />PER SUBP. 7 - 75% CREDIT = 63548 SF (1.46 AC) <br />WETLAND RESTORATION AREA (VEGETATIVE RESTORATION OF FARMED WETLANDS SUBP. 5) <br />RESTORE AREA 1=949 <br />RESTORE AREA 2=7959 <br />RESTORE AREA 3=3089 <br />RESTORE AREA 4=4653 <br />RESTORE AREA 5=3897 <br />TOTAL WETLAND RESTORATION AREA = 20547 (0.47 AC) <br />PER SUBP. 5 - 50% CREDIT = 10274 SF (0.24 AC) <br />WETLAND RESTORATION AREA (RESTORATION OF PARTIALLY DRAINED WETLANDS SUBP. 4) <br />WETLAND A=63656 <br />WETLAND D1=10900 <br />WETLAND D2=4231 <br />WETLAND D4=2806 <br />WETLAND E=67678 <br />WETLAND F=16078 <br />WETLAND G=16910 <br />TOTAL WETLAND RESTORATION AREA = 182259 (4.18AC) <br />PER SUBP. 4 - 50% CREDIT = 91130 SF (2.09 AC) <br />WETLAND UPLAND BUFFER AREAS (SUBP. 2) <br />WETLAND BUFFER PER CREATION AND RESTORED WETLANDS (25' MINIMUM AVERAGE BUFFER WIDTH) <br />CREATION AREA 1 AND RESTORATION AREA 1-3 (CONTIGUOUS) <br />TOTAL WETLAND EDGE LENGTH=895' <br />TOTAL REQUIRED BUFFER AREA IF 25' AVERAGE=895' X 25' = 22,375 SF <br />TOTAL PROVIDED BUFFER AREA=29,160 SF <br />CREATION AREA 2 <br />TOTAL PROVIDED WETLAND BUFFER = 4,515 SF <br />CREATION AREA 3 <br />TOTAL PROVIDED WETLAND BUFFER = 3,106 SF <br />CREATION AREA 4 <br />TOTAL PROVIDED WETLAND BUFFER = 20,898 SF <br />CREATION AREA 5 <br />TOTAL PROVIDED WETLAND BUFFER = 24,343 SF <br />RESTORATION AREA 4 <br />TOTAL WETLAND EDGE LENGTH=193' <br />TOTAL REQUIRED BUFFER AREA IF 25' AVERAGE=193' X 25' = 4825 SF <br />TOTAL PROVIDED BUFFER AREA=5737 SF <br />RESTORATION AREA 5 <br />TOTAL WETLAND EDGE LENGTH=196' <br />TOTAL REQUIRED BUFFER AREA IF 25' AVERAGE=196' X 25' =4900 SF <br />TOTAL PROVIDED BUFFER AREA=6,557 SF <br />TOTAL BUFFER AREA=94316 (2.17AC) <br />PER SUBP. 2 - 25% CREDIT = 23579 SF (0.54 AC) <br />TOTAL FILL = 1.78 ACRES <br />REQUIRED MITIGATION 2:1=3.54 AC <br />ON -SITE MITIGATION CREDIT=188,531 SF = 4.33 ACRES <br />OFF SITE CREDITS - NOT USED <br />z00 <br />a <br />Know what's below. <br />Call before you dig. <br />O <br />N <br />N <br />� <br />L0 <br />u7 <br />E <br />O <br />_N <br />Z <br />N <br />o <br />J <br />_0 <br />O <br />C� <br />O O <br />2 <br />� <br />N <br />� <br />O <br />O <br />0 <br />1� <br />� <br />O <br />O <br />s <br />CO <br />U <br />W <br />O <br />ISSUE/SUBMITTAL SUMMARY <br />DRAWN BY:mp, kt REVIEWED BY: mp, kt <br />PROJECT NUMBER: 18301 <br />REVISION SUMMARY <br />DATE DESCRIPTION <br />WETLAND PLAN <br />W1 0 <br />■ <br />COPYRIGHT 2020CIVIL SITE GROUP IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.