Laserfiche WebLink
GENERAL GRADING NOTES: <br />1. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 <br />OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR <br />OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />2. SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES. <br />3. THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITE <br />PREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN ACCORDANCE WITH THE REQUIREMENTS <br />OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS <br />WITH THE SOILS ENGINEER. <br />4. GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION <br />DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT REQUIREMENTS OF THE CITY. <br />5. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 <br />OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR <br />OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />6. PROPOSED SPOT GRADES ARE FLOW -LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED. <br />7. GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS <br />SLOPE, UNLESS OTHERWISE NOTED. <br />8. PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES <br />IN MAINTAINED AREAS IS 4:1 <br />9. PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN <br />HEIGHT SHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALL ENGINEER. DESIGN DRAWINGS <br />SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION <br />OF CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR A FINAL <br />FIELD CHECK OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL <br />AND SODDING ACTIVITIES. <br />11. IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL <br />MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE <br />SITE. <br />12. EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS <br />DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE <br />AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, <br />ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE <br />ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A <br />MINIMUM DEPTH OF 6 INCHES. <br />13. FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF <br />GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED <br />TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR <br />BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED <br />FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME <br />RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS <br />DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL <br />CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. <br />14. PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR <br />PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS <br />WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE <br />COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH <br />SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE <br />COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. NO TEST ROLL SHALL OCCUR <br />WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTION SYSTEMS. <br />15. TOLERANCES <br />15.1. THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, <br />OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. <br />15.2. THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN <br />0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT <br />IS MADE. <br />15.3. AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE <br />REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. <br />15.4. TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. <br />16. MAINTENANCE <br />16.1. THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA <br />FREE OF TRASH AND DEBRIS. <br />16.2. CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO <br />SPECIFIED TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE WARRANTY PERIOD, <br />EROSION CONTROL NOTES: <br />SEE SWPPP ON SHEETS SW1.0 - SW1.5 <br />CITY OF HUGO GRADING NOTES: <br />ALL PONDS SHALL BE CLAY LINED. <br />DICE CREEK WATERSHED NOTES: <br />ALL ELEVATIONS SHOWN ON THE PLANS ARE IN VGVD29. TO CONVERT TO <br />NAVD88 ADD 0.15'. <br />GRADING PLAN <br />LEGEND: <br />EX. 1' CONTOUR ELEVATION INTERVAL <br />1.0' CONTOUR ELEVATION INTERVAL <br />1137 <br />�41.26 <br />SPOT GRADE ELEVATION (GUTTER/FLOW LINE <br />UNLESS OTHERWISE NOTED) <br />891.00 G <br />SPOT GRADE ELEVATION GUTTER <br />891.00 TC <br />SPOT GRADE ELEVATION TOP OF CURB <br />891.00 BS/TS <br />SPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS <br />891.00 ME <br />SPOT GRADE ELEVATION MATCH EXISTING <br />GB <br />GRADE BREAK - HIGH POINTS <br />CURB AND GUTTER (T.0 = TIP OUT) <br />EMERGENCY OVERFLOW <br />EOF=1135.52 <br />�■■■■WETLAND <br />I <br />I <br />h6 <br />9� <br />g <br />------ -I - _____-_ <br />I a I g+6 <br />I <br />I I I , <br />I I � • <br />� I <br />� I <br />II <br />LIMITS OF <br />_ �'46n CONSTRUCTION <br />E F s1 LOCK 4 EOF <br />+2 <br />I I 1 _ ■ o� � � <br />g Fl <br />I w I ► N <br />B 10/ R18 <br />S11 <br />1�fl <br />WETLANDD1 ♦ tuMirsoF <br />10,900S ,6 2 ♦ \ , 'P.CONSTRUCTION <br />M <br />N WETLAND H / / / <br />1 1555 SF <br />► a / / / 2 <br />(DITCHED) <br />`r ` <br />IFig) <br />u/ 4 I 5 / / N / ��m� <br />/ 0 i ` 'LOCK <br />LOC <br />_ 9 K6 \� o <br />\10 - � t . y I SS.14 <br />BASIN 1 i ` ;6 s <br />ANWL=914.59 <br />I I e ♦ OUTLET EL=914.50 <br />I I I F oN ♦ 100-YR HWL=915.64 <br />_ DITCH 7 <br />� WETLAND A a I <br />I I I d 1 63,656 SF <br />vo I I <br />-914�m000 <br />I I <br />LO <br />01 <br />- <br />\ <br />I I \ ♦ 1 1 f= i- II II I LIMITS OF <br />CONSTRUC <br />TION <br />N <br />ASlamq� I z <br />`� ♦ '6 I I L I <br />/ / E+ I I A6 // l / \ ♦ / - - I I I ET L 1. I I I G O <br />HWL 1 I O J <br />M � f I � <br />� 9'6 9,e � \ 16 / <br />T A <br />� II y r/ <br />II 9 w 13_4 - I� I I I �, Q <br />M- _0 <br />I g+6 <br />Ln I I BASIN 2 I I I O <br />O NWL=914.50 `s \ \ \ Ql N mmm <br />I omgom o� I I <br />I L OUTL'1T EL=914.9b '♦ r i I m I I, <br />o <br />100-YR HWL=915.54 <br />II <br />a LIMITS OF WEl I 11 r• r• / \ I M I � <br />coNsrRucrloN I I WETLAND F • / / OG r III 5$ <br />I I I $ k F / d \ \ > 9�6 rn � / I`✓ I I I /O^ O <br />7 ' V <br />O <br />��//��y I I <br />B_7 � t_ <br />y11 \ I I i �18 <br />' I I '�- <br />ti <br />\ S \ \ m I \\ 531-6 I W <br />O <br />.� 11 <br />kl \ » ZO \ / I 1 \ o 10 - 1 HEREBY CERTIFY THAT THIS PLAN, <br />_ I / SPECIFICATION, OR REPORT WAS <br />BASIN 3 ♦ PREPARED BY ME OR UNDER MY DIRECT <br />I I 1 NWL=915.00 \ / - 918 _ ETLAND 12 ♦ 9`ti <br />I I I - SUPERVISION AND THAT I AM A DULY <br />E F 4 TLET FL=915.0 Z� 774 SF I �' <br />I I 1 -YR HWL=916.4 LICENSED PROFESSIONAL ENGINEER <br />I I I I I WETLAN 9'6 I I os15 I - UNDER THE LAWS OF THE STATE OF <br />(C 0 \0\\ Ro\e <br />c m o U Y, <br />Civil Engineering - Surveying - Landscape Architecture <br />4931 W. 35th Street, Suite 200 <br />St. Louis Park, MN 55416 <br />civilsitegroup.com 612-615-0060 <br />ERODED AREAS WHERE TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED. I I 7 <br />16.3. WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR <br />ADVERSE WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND COMPACT TO REQUIRED <br />DENSITY PRIOR TO FURTHER CONSTRUCTION. <br />/ WETLANDX ` <br />I I I LIMITS OF ♦ _ <br />CONSTRUCTION �m m ♦ ,+, <br />9 9yo <br />LIMITS OF J Et <br />\ / CTION I <br />I <br />921. <br />24.5 <br />h \ <br />91 NV= <br />916.31 914fd OOS <br />V Inv=905;�17, CBR <br />Rim=919.12 <br />III nv=916.02 <br />IN � / <br />IN = MH <br />915.82 <br />/ O <br />SMH <br />Rim=9 95 <br />,avOC - <br />L - <br />LIMITS OF <br />CONSTRUCTION <br />r <br />�-� 16,910 <br />/ MINNESOTA. SF ;� � I I I - --- <br />� WETLAND 8Zk <br />I - - I I IMITS OF 2 s1o1a \�// 58,590 SF <br />1 I eN�T ° v1 / a \ \ 910 ~ l �I I� 1 0 ' Matthew R. Pavek <br />I I CIA <br />0 F -- 1 <br />�•.� / \ \ \\ I / DATE 12.13.20 LICENSE NO. 44263 <br />I I ISSUE/SUBMITTAL SUMMARY <br />\ 9 I <br />DATE DESCRIPTION <br />_m l I 1I 12/4/20 CITY SUBMITTAL <br />12/13/20 REVISED CITY SUBMITTAL <br />SB5 ' �'/ / 12/23/20 REVISED CITY SUBMITTAL <br />1/5/20 WATERSHED SUBMITTAL <br />O <br />1/26/21 CITY RESUBMITTAL <br />/ <br />1 <br />I sso <br />j WETLAND E I 9+e <br />W (/ 67,678 SF \ i� <br />1 4 �� r , <br />1 3 4 xd LIMITS OF <br />2 <br />1 BASIN 2 a �� /� CONSTRUCTION <br />/ NWL=913.00 1 <br />y ` OtYTLET EL=9t3.00 <br />i <br />-zo r�JI OU(Vo - - - -� ,� 00UOTLETEOF=914.3 au oU P S�l 9/ r WETL/ <br />918 16 S� LIMITS OF 4 n 4 LIMITS OF 1 0 <br />la3+ CONSTRUCTION 914 <br />CONSTRUCTION 916 ,a <br />SMH - - EOF <br />Ri- 914.50 LIMITS OF i - - LIMITS OF 9 - 2 907.64 <br />CONSTRUCTION CONSTRUCTION / DRAWN BY:mp, kt REVIEWED BY: mp, kt <br />PROJECT NUMBER: 18301 <br />LsLc♦ , I / <br />\ REVISION SUMMARY <br />❑_-o\ � I / DATE DESCRIPTION <br />I / / <br />\ LOW FLOOR-920.�-LOW F <br />00 I <br />LOOR=919.70 � / � // /♦ <br />LOW FLOOR \ =918_50(p@r{ot cert; verify <br />LOW FLOOR-918.00 per o cert, veufy�OW FLOOR=919.00 / <br />r blot-cer�erify) ' / \ OVERALL <br />\ _ LOW FLOOR=918.50 (per lot cent, verify) <br />lot <br />t cert, verify) n <br />- - / � / no`�kl <br />GRADING PLAN <br />\ <br />TNH= <br />\ I 92,." <br />Know what's below. 1" = 80'-0" <br />Call before you dig. nmnm%mmmmmmmm 40'-0" o BoUjimu <br />QC COPYRIGHT2020CIVIL SITE GROUP INC. <br />