My WebLink
|
Help
|
About
|
Sign Out
Home
2021.03.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.03.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 9:43:36 AM
Creation date
3/15/2021 9:40:45 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/15/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Adelaide Landing 6th Addition 5 <br /> 6. Project Completion: The Improvements listed herein on Exhibit A, including <br />street, sanitary sewer, storm sewer, and municipal water, shall be completed subject to the approval <br />of the City in accordance with the approved plans. All Improvements shall be substantially <br />completed to the reasonable satisfaction and approval of the City within twelve (12) months of the <br />execution of this Agreement. Substantial completion shall consist of all work with the exception of <br />placement of the bituminous wear course and completion of the final punchlist. The Developer <br />shall be excused from the strict completion date set forth herein if written notice is received from <br />the Developer of the existence of causes over which the Developer has no control which will delay <br />the completion of the work and approved in writing by the City. In that event, the City may extend <br />the date or dates herein specified. <br /> <br /> 7. Project Acceptance: Final project acceptance will be considered by the City <br />Council once the following have been completed: <br /> <br /> (a) All Improvements are installed according to the approved plans. <br /> (b) All punchlist items are completed. <br /> (c) All Record Drawing information has been provided to the City to its <br />satisfaction. <br /> (d) Escrow account for City costs and fees is current in accordance with the <br />provisions of this Agreement. <br /> (e) The City receives confirmation via lien waivers that contractors or other <br />parties have been paid for the work completed. <br /> (f) The City receives a written request from the Developer to accept the <br />Improvements. <br /> <br /> 8. Record Drawing Requirements and Engineer’s Certification. Following <br />completion of all development activities and prior to the release of security and acceptance of <br />Improvements, the Developer and/or their assignee shall provide to the City "as-built" plans for the <br />Improvements listed on Exhibit A. This information shall be provided to the City in the following <br />formats: <br /> <br /> (a) 1-set mylar drawings (22” x 34”) for all Improvements. <br /> (b) 1-set paper drawings (22” x 34”) for all Improvements. <br /> (c) Individual Adobe.pdf (or approved equivalent) for all plan sheets and the <br />final plat. <br /> <br /> All Record Drawings shall include the following information: <br /> (a) All bench marks shown on plans (bench marks shall be top nut of hydrants). <br /> (b) Swing ties to all gate valves shown on plans (ties should be to manholes, <br />catch basins, hydrants or other permanent objects. <br /> (c) Swing ties to curb stops shown on plans (ties should be to manholes, catch
The URL can be used to link to this page
Your browser does not support the video tag.