My WebLink
|
Help
|
About
|
Sign Out
Home
2021.03.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.03.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 9:43:36 AM
Creation date
3/15/2021 9:40:45 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/15/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4 <br /> <br /> <br /> <br /> <br /> d) Private Utilities: All private utilities that are installed, including <br />electricity, telephone, natural gas and cable television, shall be installed underground. <br /> e) Mailboxes: Developer shall coordinate mailbox locations with the <br />United States Postal Service. <br /> f) Street Lights: Street lights shall be installed within the Plat <br />according to the Street Lighting Plan, which will first be approved by the City Engineer. Developer <br />shall also submit its Street Lighting Plan to the applicable power company for its review, comment <br />and approval. The installation of the street lights shall be coordinated with the applicable power <br />company so that the street light system is installed, constructed and operated in such a manner as <br />will harmoniously exist with other street lights within the area. <br /> g) Working Hours: Construction activity, including equipment <br />startup and fueling, can only occur between the hours of 7:00 a.m. and 7:00 p.m. Monday through <br />Friday; 8:00 a.m. and 5:00 p.m. on Saturdays; at no time on Sundays or holidays. <br /> h) Street Sweeping: Developer shall sweep and/or otherwise clean all <br />streets, as needed, within and adjacent to the Development property as a result of construction <br />activities associated with the Plat until final acceptance of the Improvements. If the streets are not <br />maintained in a manner acceptable to the City, after reasonable notice to the Developer the City will <br />arrange for the street sweeping at Developer’s cost. <br /> i) Placement of Bituminous Wear Course: The bituminous wear <br />course can be placed on all streets once all of the following have occurred: <br /> 1. A Certificate of Occupancy has been issued for at least 75% <br />of the lots or a cash escrow in the amount of $10,000 has <br />been deposit with the City which will be held until 75% of <br />the lots have received Certificates of Occupancy. At the <br />City’s discretion, the wear course may be placed prior to <br />having 75% occupancy. If applicable, the warranty period <br />shall be extended an additional one (1) year for a total of two <br />(2) years from final acceptance. In no case shall the wear <br />course be placed with less than 50% occupancy. <br /> 2. The base course on all streets has been in place for at least <br />one full freeze-thaw cycle. <br /> 3. City staff or its assignees have visually inspected all <br />roadways and curb within the Development, and any repairs <br />necessary as a result of said inspection are complete and <br />written approval issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.