Laserfiche WebLink
<br />20 <br /> <br /> <br />i) Escrow for Street Signage. Developer shall deposit $0.00 into an <br />escrow account with the City. This amount represents an estimated <br />cost of $500/sign for 0 signs to be installed within the development. <br /> <br /> j) WCA Escrow. N/A <br /> <br />k) Sanitary Sewer Trunk Fee. The developer shall pay the City a <br />sanitary sewer trunk fee in the amount of $22,848.00. This sum is calculated to be $1,632.00 per lot <br />for the 14 residential lots within this phase. <br /> <br />l) Water Trunk Fee. The Developer shall pay the City water trunk fee <br />in the amount of $17,836.00. This sum is calculated to be $1,960 per lot, with credit provided for <br />the stormwater reuse/irrigation system based on the anticipated reduction in water demand. The <br />reduction is calculated at 35%, resulting in a trunk water fee amount of $1,274 per lot. The total is <br />based on the reduced per unit fee applied to the 14 lots in the plat. <br /> <br />m) Sanitary Sewer Oversizing. N/A <br /> <br />n) Watermain Oversizing. N/A <br /> <br />