My WebLink
|
Help
|
About
|
Sign Out
Home
2021.03.01 RESO 2021-10 Meadows at Hugo PUD General Plan
Hugo
>
City Council
>
City Council Resolutions
>
2021 CC Resolutions
>
2021.03.01 RESO 2021-10 Meadows at Hugo PUD General Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 12:59:24 PM
Creation date
3/16/2021 12:59:24 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
3/1/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2021-10 <br />Page 2 <br />7. The preliminary phasing plan is generally approved per plans dated January 25, 2021. <br />The phasing plan shall be revised to include all improvements, such as stormwater <br />management and trails. Any major revisions to the phasing plan shall require a PUD <br />amendment. Minor modifications shall be reviewed and approved by staff. <br />a. In addition to the lots and improvements shown on the submitted plans, phase <br />1 shall include the passive trail connection to the City -owned park land west <br />of the development and the sewer and water infrastructure along the entire <br />length of the north property line. <br />b. Phase 2 shall include the passive trail path along JD3 and connection to the <br />Greenway Corridor. <br />8. The building setbacks and impervious surface coverage requirements for the PUD are <br />as follows: <br />Required Proposed <br />(R3) 2-Story Villa 1-Story Villa <br />Minimum lot size <br />10,400 5,400 sq. ft. <br />sq. ft. <br />80 ft. 44 ft. <br />6,750 sq. ft. <br />50 ft. <br />135 ft. <br />Minimum lot width at front setback line <br />Minimum lot depth <br />Minimum front yard building setback <br />100 ft. 135 ft. <br />25 ft. <br />30 ft.FUlp <br />25 ft. <br />Minimum side yard building setback <br />10 ft.7.5 ft. <br />5 ft. <br />30 ft. <br />Up to 60% <br />Minimum rear yard building setback <br />30 ft.30 ft. <br />Maximum lot area covered by impervious <br />surface <br />50% to 55% <br />9. The developer has indicated that covenants will be established for the development to <br />manage architectural design and aesthetics within the development. The covenant <br />document shall be reviewed and approved by staff prior to the recording of the final <br />plat for the Phase 1. <br />10. The developer must comply with the following, prior to Final Plat and Final PUD <br />Plan application approval: <br />Landscaping and Lighting <br />a. All trees shall be located outside of the public right of way. <br />a. The exact locations and design of the street lights will be evaluated with each <br />final plat application. The street lights shall be a decorative, lantern style and shall <br />comply with the City standards for street lighting within the public right-of-way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.