Laserfiche WebLink
<br /> <br />White Bear Lake School District 7 <br />outlined in the City’s General Specification and Standard Details Manual or approved equal by the <br />City. <br /> <br /> 13. Lowest Floor Elevations. All minimum floor elevations shall comply with Section <br />90-171 of the Hugo Zoning Ordinance, the City’s Comprehensive Stormwater Management Plan, <br />or the approved Grading, Drainage, and Erosion Control Plan, whichever is more restrictive. <br />Except as may be specifically allowed under Exhibit A, no building shall be constructed on any of <br />the lots herein unless the lowest floor elevation is at least three (3) feet above the 100-year flood <br />elevation or four (4) feet above the high groundwater elevation, whichever is greater, for the subject <br />property. Additionally, the lowest floor elevation shall be specifically referenced and designated, <br />for each lot, on a certificate of survey, which survey shall be provided to the City before any <br />building permits are issued for any lots within the Project. <br /> <br /> 14. Landscaping. All disturbed areas within the project shall be landscaped in <br />accordance with the approved landscape plans, the City ordinances, and the City’s General <br />Specification and Standard Details Manual. All landscaping shall be complete, established and <br />growing within sixty (60) days of issuance of a Certificate of Occupancy, except that, if the <br />certificate of occupancy is issued between the dates of October 1 and May 1, then the landscaping <br />required herein shall be complete, established and growing no later than July 1. All landscaped <br />areas shall be tilled or otherwise worked mechanically in order to loosen compacted soils and shall <br />contain at least four (4) inches of black dirt containing no more than 35% sand, unless specific <br />arrangements are made and agreed to by the City. All landscaping installed within the Project shall <br />be maintained by the Developer and its successors. <br /> <br /> All areas, other than proposed street areas, disturbed by grading activities on the site shall be <br />seeded. Seeding shall be immediate upon completion of grading activities or as directed by the City <br />Engineer. Seeding shall be completed as follows: <br /> a) All areas shall be restored with a minimum of four (4) inches of adequate <br />topsoil prior to seeding. <br /> b) Upland areas shall be seeded in accordance with the grading, drainage, and <br />landscape plans listed in Exhibit A. The rate of application shall be one hundred (100) pounds per <br />acre. Areas seeded shall be mulched with Type 1 mulch at a rate of two (2) tons per acre. All <br />mulch shall be disk anchored. <br /> c) Wetlands, wetland replacement areas and storm water ponding areas shall be <br />seeded with MN/DOT Seed Mixture 25B, or as required by the permitting regulatory agency, or <br />otherwise approved by the City in the landscape plan. The minimum rate of application shall be <br />thirty (30) pounds per acre, or as recommended by the supplier. <br /> d) All seeded areas shall be maintained for the term of this Agreement. Upland <br />areas shall be mowed as necessary or as directed by the City Engineer.