My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:06:31 AM
Creation date
4/16/2021 10:58:59 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/5/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
White Bear Lake School District Elementary School <br />Page 4 <br />The site is not located adjacent to the public waters. <br />8. The proposed use will not damage or reduce the benefits the public receives from public <br />waters. <br />The site is not located adjacent to the public waters. <br />9. If located in the shoreland overlay district, the waterbody will be able to safely accommodate <br />the number, type, and uses of the watercraft the project will generate. <br />The site is not located in the shoreland overlay district. <br />10. If located in the shoreland overlay district, all structures and facilities are screened from <br />view from public waters. <br /> The site is not located in the shoreland overlay district. <br />11. If the permit is to approve a wetlands replacement plan, the plan is in conformance with the <br />rules of the state board of soil and water resources for such plans. <br />The project is not proposing any wetland impacts. <br />12. The applicant or operator shall obtain all necessary state and local permits for the <br />conditional use. <br />The applicant shall be responsible for all necessary state and local permits. <br />13. The proposed use is adequately buffered and screened from noncompatible land uses and <br />public rights-of-way <br /> <br />There is a buffer of over 350 feet from the residential development to the north. Staff is <br />recommending additional landscaping along the north side of the driveway and parking areas of <br />the project. <br /> <br />Site Plan <br /> <br />Elementary School <br /> <br />The site plan indicates the construction of an elementary school gymnasium at the north side of <br />the building. The proposed building is located on the eastern portion of the property, adjacent to <br />Highway 61. The primary parking lot is located northeast of the building with access to a <br />driveway that goes to Highway 61. A bus loop, along with a small parking area is provided to <br />the south of the building with access to Highway 61. Wetlands occupy the western portion of the <br />property, and athletic fields are proposed over a portion of the upland area to the north. Athletic <br />fields include two softball field sized to accommodate youth baseball. A small parking area is <br />indicated adjacent to the fields. The main parking lot and small parking lot will serve the athletic <br />fields located at that end of the property. Walking trails connect the fields to the school building
The URL can be used to link to this page
Your browser does not support the video tag.