My WebLink
|
Help
|
About
|
Sign Out
Home
2021.04.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.04.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:06:31 AM
Creation date
4/16/2021 10:58:59 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/5/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\White Bear Lake Schools\Peloquin Property Site - New School\2021 Site Plan, CUP, PLA\Engineer <br />Comments\016105-000 LTR RJuba - ISD 624 New Elementary School.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM March 19, 2021 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br /> <br />Re: Site Plan Review <br /> ISD #624 Elementary School <br /> WSB Project No. 016105-000 <br /> <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the site plan submittal for the proposed ISD #624 Elementary School located <br />west of Highway 61 at 152nd Street. In particular, we have reviewed the following plans related to <br />this particular request: <br /> <br />• Civil Plan Sheets dated 2/5/21 by Larson Engineering <br />• Architectural Plan Sheets dated 12/18/20 by Wold Architects and Engineers <br />• Stormwater Report dated 2/5/21 by Larson Engineering <br />• Washington County Comments <br />• MNDOT Comments <br />• Traffic Impact Study dated 1/28/21 <br /> <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br /> <br />Grading, Street, and Utility Plans <br /> <br />1. The site is proposed to have one access from Forest Boulevard/US Hwy 61 at 152nd Street. <br />2. City staff has met with MNDOT, Washington County, and the White Bear Lake Elementary <br />School project team to discuss initial access options, identify what needs to be included in the <br />Traffic Impact Study, review of the Traffic Impact Study, and collectively selected the type of <br />intersection improvements needed at this intersection. <br />3. The intersection improvements consist of a signalized intersection with the addition of <br />northbound and southbound turn lanes along with turn lane additions on 152nd Street. The <br />White Bear Lake School District is currently working to develop an approved layout and will <br />continue to work through final design and right-of-way needs for the project. All costs for the <br />intersection improvements will be the responsibility of the White Bear Lake School District. <br />4. Access (permanent and temporary) will need to be coordinated and approved by MNDOT <br />and Washington County as the access crosses the Hardwood Creek Regional Trail. <br />5. All intersection improvements will need to be completed prior to a certificate of occupancy is <br />issued. <br />6. The short stub street extended from 157th Way N was originally intended to provide one of <br />two access points to the property; however this will no longer be the case with the proposed <br />school. Since this access point will no longer be used to access the site, the stub street will <br />need to be removed and restored with turf and the proposed trail extend up to 157th Way.
The URL can be used to link to this page
Your browser does not support the video tag.