My WebLink
|
Help
|
About
|
Sign Out
Home
013720-000-PlanSheets
Hugo
>
Community Development
>
Parks
>
Trails
>
130th Street, HCT Feasibility Study
>
Final Concept and Design
>
013720-000-PlanSheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:55:27 PM
Creation date
4/19/2021 2:02:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROUND OUT CUT .. 1'01'0" B <br />-AL ....... k. _ _ 18' 0" MIN. - - P.I. � P.I. <br />CONTOURING ROAD CUTS <br />ROADWAY CONSTRUCTION 20 DESIRABLE <br />LIMITS .f R/W LINE <br />I � <br />5' 5' vp�, 1;6 <br />I <br />ROUNDING SHOULDERS AND BACKSLOPES <br />CL ROADWAY <br />GROUND LINE � <br />SHAPING FOR DRAINAGE ALONG THE TOE OF FILL SLOPES <br />BITUMINOUS SHOULDER VARIES SEE TYPICAL SECTIONS <br />SHOULDER BASE <br />AGGREGATE 1ST STAGE CONSTRUCTION <br />1"(WHEN SOD IS PLACED) 2ND STAGE CONSTRUCTION <br />r OD OR SEED EED & ULCH <br />I TOPSOIL <br />3- MIN. TOPSOIL <br />SHAPING AND TOPSOILING INSLOPES <br />6' 0" MIN. <br />�jAY SHOULDER CURB TOP OF SOD EVEN <br />ROAD <br />1 1 l f WITH TOP OF CURB <br />L TOP OF TOPSOIL 1INCH <br />BELOW TOP OF CURB <br />SHAPING ADJACENT TO CURBS WHEN SOD IS PLACED <br />REVISION- <br />2 2 <br />APPROVED. 2-28-2017 <br />C-lEF EM/IR&okI lAL pr►ICER <br />NOTES: <br />SEE SPEC.2575.3 FOR ADDITIONAL INFORMATION. <br />Ql CONSTRUCT TAPER AS DIRECTED BY THE ENGINEER. <br />Z <br />N <br />N <br />PLAN VIEW <br />DITCH <br />TMDITCH <br />12-1 BOOM <br />�5c5 <br />IL 8' 0" DESIRABLE <br />O W <br />C] <br />T• n•• lQ• n-• 1h Ai Cnn IkTnTu <br />` EXTEND SOD AT 12'INTERVALS <br />SODDED DITCH CROSS SECTION <br />WHERE FRONT OR BACK SLOPE IS FLAT (LESS THAN 1/2"/FT.), <br />FIRST NOTCH DITCH AND THEN PROVIDE ROUNDING. <br />THEORETICAL DITCH GRADE J� FLO <br />FINISHED DEPRESSED JIcM. F�OI.-lo'o"`EXTEND SOD <br />SODDED DITCH GRADE r CRC c 3" MIN• INTO <br />TOPSOIL <br />FLO----=cc s�'� <br />DITCH PROFILE <br />SODDED DITCH DETAILS <br />mll REVISED, <br />M INN @ S O TA APPROVED, <br />DEPARTMENT 2 - 2 8 - 2 017 <br />TRANSPORTATION STATE DESIGN ENGINEER <br />NORMAL <br />BACK SLOF <br />PLAN VIEW <br />EXTEND SOD AT 12'INTERVALS� <br />n•• �' vI.TAcI r .L TnT. 11• _ 1n• I' 0" 1 ,• n•• <br />E � <br />Tp <br />P.I. I P.I. <br />EXTEND SOD PAST <br />APPROX.8' <br />SECTION A -A <br />TOP OF BACKSLOPE- <br />OF DITCH NORMAL <br />BACKSLOPE <br />ARIABLE <br />FLO_ <br />- TOE OF gE 1 $cc <br />BACKSLOPE ENV <br />c� EXTEND SOD <br />3" MIN. INTO <br />TOPSOIL <br />1' FINISHED DEPRESSED SODDED FLUME <br />SECTION B-B <br />SODDED FLUME DETAILS <br />PERMANENT EROSION CONTROL <br />STANDARD PLAN 5-297.404 (SHEET 1 OF 1) <br />SHEET NO. 12 OF 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.