My WebLink
|
Help
|
About
|
Sign Out
Home
013720-000-PlanSheets
Hugo
>
Community Development
>
Parks
>
Trails
>
130th Street, HCT Feasibility Study
>
Final Concept and Design
>
013720-000-PlanSheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:55:27 PM
Creation date
4/19/2021 2:02:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hardwood Creek Trail <br />MATCH LINE STA 21+00 <br />O <br />i <br />IN <br />CQNST. LIMITS •r <br />I txx <br />CQNST. LIMITS �- <br />Hardwood Creek Trail <br />--- CQNST. LIMITS <br />--------Z---------y---------gam-------21T <br />uesip cyy. <br />I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY <br />TJS <br />DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL <br />r <br />Plan By: TJS <br />Checked By: <br />ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. <br />10 <br />b <br />�. CITY OF <br />ACJ <br />ADAM JESSEN, PE <br />WS <br />11H11,` <br />JI <br />Fsr lsos <br />Approved By: <br />-_ <br />ACJ <br />DATE: 10/3/2019 LICENSE NO. <br />HARDWOOD CREEK TRAIL <br />HUGO, MINNESOTA <br />0 50 FT 100 FT <br />LEGEND <br />REMOVE BITUMINOUS PAVEMENT <br />CLEARING AND GRUBBING (ACRE) <br />REMOVE CURB AND GUTTER <br />----" CONSTRUCTION LIMITS <br />O SA�ING BITUMINOUS PAVEMENT <br />(F LL DEPTH) <br />NOTES[ <br />2. SAtCUTTING FOR CONCRETE CURB AND <br />GUTTE SHALL BE INCIDENTAL. <br />X <br />• <br />0 50 FT 100 FT <br />CITY OF HUGO, MINNESOTA On` 1 <br />20 <br />OF <br />MISCELLANEOUS'REMOVALS PLAN 25 <br />SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.