My WebLink
|
Help
|
About
|
Sign Out
Home
013720-000-PlanSheets
Hugo
>
Community Development
>
Parks
>
Trails
>
130th Street, HCT Feasibility Study
>
Final Concept and Design
>
013720-000-PlanSheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:55:27 PM
Creation date
4/19/2021 2:02:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ly <br />TURF ESTABLISHMENT & EROSION CONTROL NOTES <br />1. ALL STREETS IN AND ADJACENT TO THE PROJECT SHALL REMAIN CLEAN AND PASSABLE AT ALL TIMES. <br />ADJACENT STREET AND CURB LINE TO BE SWEPT FREE OF DEBRIS AT THE END OF EACH WORK DAY, OR <br />AS OFTEN AS NEEDED TO ENSURE PUBLIC SAFETY. <br />2. THE CONTRACTOR SHALL PROVIDE PERIMETER CONTROL DAY-TO-DAY AT DISTURBED UNSTABILIZED AREAS <br />WHERE EROSION OR SEDIMENTATION COULD BE A PROBLEM. THE ENGINEER SHALL DIRECT THE <br />CONTRACTOR AS TO WHERE PLACEMENT OF PERIMETER CONTROL WILL BE REQUIRED. <br />3. ADDITIONAL EROSION AND SEDIMENT CONTROL MAY BE ADDED DURING ANY PHASE OF CONSTRUCTION AS <br />DIRECTED BY THE ENGINEER. <br />A. STABILIZATION OF DISTURBED AREAS SHALL BE DONE BY PERMANENT TURF ESTABLISHMENT WHENEVER <br />POSSIBLE. <br />5. IN THE EVENT THAT PERMANENT STABILIZATION CANNOT BE 1OLEM NTED j�ITHIN 14 DAYS AFTER <br />CONSTRUCTION ACTIVITY IN THE DISTURBED AREA HAS C ASED, TE PORARY STABILIZATION BI(IPS MUST <br />BE SCHEDULED TO OCCUR WITHIN THAT 14 DAY TIME FRAME. <br />6. ALL STOCKPILES MUST HAVE PERIMETER SEDIMENT CONTROL IMPLEMENTED AND MAINTAINED AT ALL <br />TIMES. STOCKPILES TO RECEIVE RAPID STABILIZATION METHOD 3 IF UNWORKED FOR 14 DAYS. <br />EROSION CONTROL LEGEND <br />SILT FENCE.TYPE MS <br />(PLACE SEDIMENT CONTROL LOG TYPE WOOD <br />FIBER AS NEEDED NEAR STEEP SLOPES) <br />® EIX <br />SEED <br />MMIX 33-261(35 LBS/ACRE) <br />FERTILIZER TYPE 3 (350 LBS/ACRE) <br />HYDRAULIC MULCH MATRIX (2100 LBS/ACRE) <br />TEMPORARYt <br />RAPID STABILIZATION METHOD 3 <br />2 ivu. <br />uAIt <br />°r <br />unn <br />—'n"a <br />uesignnyy. <br />TJS <br />I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL <br />ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. <br />WSI_T�T� <br />11�/\J\) <br />CITY OF <br />�,�,JI <br />_ EST.'9°e <br />HARDWOOD CREEK TRAIL <br />H U GO, M I N N ESOTA <br />CITY OF HUGO, MINNESOTA <br />SHEET <br />24 <br />OF <br />25 <br />SHEETS <br />a <br />Plan By: <br />TJS <br />TURF EST &EROSION CONTROL PLAN <br />Checked By <br />ACJ <br />Z <br />Approved By: <br />ACJ <br />ADAM JESSEN, PE <br />DATE: in/3nm9 LICENSE NO. xxxx <br />Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.