Laserfiche WebLink
HARDWOOD TRAIL - ALTERNATE ROUTE <br />WSB Project: HARDWOOD CREEK TRAIL <br />Project Location: HUGO, MN <br />WSB Project No.: 013720-000 <br />Date: 10/3/2019 <br />STATEMENT OF ESTIMATED QUANTITIES <br />Item <br />No. <br />Description <br />Notes <br />Unit <br />Unit Price <br />ALTERNATE ROUTE TRAIL <br />COST <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />2101.505 <br />CLEARING <br />1 <br />ACRE <br />$4,000.00 <br />0.1 <br />$400.00 <br />2101.505 <br />GRUBBING <br />1 <br />ACRE <br />$3,500.00 <br />0.1 <br />$350.00 <br />2104.503 <br />REMOVE CURB AND GUTTER <br />LIN FT <br />$20.00 <br />20 <br />$400.00 <br />2106.507 <br />EXCAVATION - COMMON <br />CU YD <br />$12.00 <br />150 <br />$1,800.00 <br />2106.507 <br />COMMON EMBANKMENT C <br />CU YD <br />$8.00 <br />100 <br />$800.00 <br />2211.507 <br />AGGREGATE BASE C CLASS 5 <br />2 <br />CU YD <br />$25.00 <br />225 <br />$5,625.00 <br />2521.518 <br />6" CONCRETE WALK <br />3 <br />SQ FT <br />$6.00 <br />50 <br />$300.00 <br />2521.518 <br />3" BITUMINOUS WALK <br />SQ FT <br />$3.00 <br />9878 <br />$29,634.00 <br />2531.503 <br />CONCRETE CURB AND GUTTER DESIGN B618 <br />LIN FT <br />$26.00 <br />20 <br />$520.00 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />$42.00 <br />20 <br />$840.00 <br />2573.503 <br />SILT FENCE, TYPE MS <br />LIN FT <br />$4.00 <br />2000 <br />$8,000.00 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />LIN FT <br />$4.00 <br />1000 <br />$4,000.00 <br />2574.507 <br />COMMON TOPSOIL BORROW <br />CU YD <br />$20.00 <br />400 <br />$8,000.00 <br />2574.508 <br />FERTILIZER TYPE 3 <br />POUND <br />$0.80 <br />350 <br />$280.00 <br />2575.505 <br />SEEDING <br />ACRE <br />$1,000.00 <br />1.0 <br />$1,000.00 <br />2575.508 <br />SEED MIXTURE 33-261 <br />POUND <br />$20.00 <br />35 <br />$700.00 <br />2575.508 <br />HYDRAULIC MULCH MATRIX <br />POUND <br />$2.00 <br />2100 <br />$4,200.00 <br />20% CONTINGENCY <br />$13,369.80 <br />RAILROAD RIGHT OF WAY COST NOT INCLUDED <br />TRAIL CONSTRUCTION TOTAL <br />$80 218.80 <br />Page 1 K:\013720-000\Quantity\Preliminary\Preliminary Estimate (Alt B) <br />