My WebLink
|
Help
|
About
|
Sign Out
Home
3.17.21 Park Minutes
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Minutes
>
2021 Park Minutes
>
3.17.21 Park Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 3:54:01 PM
Creation date
4/27/2021 3:54:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Concept 2: Drop off and unloading area, vehicle access off of homestead Dr and 125th St, looped <br /> internal trail with possibility to connect to a future trail along 125`h St N. <br /> Open floor discussion included: removing kayak storage rack, shelter, adding trash receptacles, bike <br /> rack, port a pot and changing drive to only go through 125th St N with parked cars facing nonresidential. <br /> Strub requested City Staff to have a third concept plan drafted before the fall budgeting and CIP <br /> planning meeting. <br /> McGinnity asked if something could be done during the planning interim to encourage the use. <br /> Shayla Denaway, Parks Planner informed a discussion has already occurred with Scott Anderson, Public <br /> Works Director about tree clearing and mowing minimal but to help with use access. <br /> 4. Beaver Ponds Playground Replacement <br /> Shayla Denaway, Parks Planner informed that the 2021 CIP funding allocated $60,000. to replace <br /> playground equipment at Beaver Ponds Park. Lions park play equipment needs to be removed for the <br /> construction of the new park. Staff is encouraging the equipment is removed and replaced in Beaver <br /> Ponds. Cost estimates$56,000 trail, curb, removal, relocation, new surfacing, irrigation repairs, site <br /> restoration and landscaping improvements. <br /> Tennyson made a motion, Moore-Arcand seconded to approve the budget cost of$56,000. to remove <br /> and reinstall the playground equipment from Lions Park to Beaver Ponds Park. <br /> Aye: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave <br /> Strub, Ranell Tennyson <br /> Motion Carried. <br /> _). 2021 Recreation Programs <br /> Forest Lake YMCA is continuing the Park Play Days at Hanifl Fields Athletic Park and Story time. Capacity <br /> limits due to Covid safety has increased cost and they are requesting the yearly contribution of$2000. <br /> be increased to $2500. <br /> Tennyson made a motion, Moore-Arcand seconded to approve the$2500. donation to the YMCA <br /> programming services. <br /> Aye: Cathy Moore-Arcand, Roger Clarke, Emily McGinnity, Mat Rauschendorfer, Nicole Schmid, Dave <br /> Strub, Ranell Tennyson <br /> Motion Carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.