My WebLink
|
Help
|
About
|
Sign Out
Home
2021.06.21 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.06.21 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:34:33 PM
Creation date
7/19/2021 4:33:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/21/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />April 2, 2021 <br />Page 6 <br />G:\.Clients All\Hugo\Proposals\2021 LaValle AUAR\LTR - RJuba - LaValle AUAR - 040221.docx <br />Estimated Timeframe Task <br />2 Months Concept Plan Development <br />1 Month Existing and Proposed Condition Analysis <br />1 Month Traffic Analysis <br />2 Months Prepare Draft AUAR <br />1 Month City Council Orders AUAR* <br />2 Months Draft AUAR Distribution and 30-day comment period <br />1 Month Comment Review and Preparation of Final AUAR (assumes no <br />significant comments) <br />1 Month Final AUAR Distribution and 10-day comment period <br />1 Month Council Adoption of AUAR <br /> <br />* There are 120 days allowed in the rule between the official ordering of the AUAR and when the <br />AUAR needs to be done. An AUAR cannot be reasonably completed in 120 days. Therefore, <br />works starts before the official order so that the document can be completed. <br /> <br />COST ESTIMATE <br />The cost to complete the above work plan for the AUAR is estimated at $110,000. This includes a <br />required review fee of approximately $125 to process the rare features review request. This <br />expense is considered reimbursable and will be invoiced to the client. Labor for the project will be <br />billed hourly and invoiced to the client monthly. <br /> <br />The following items are excluded from this fee proposal; however, WSB can provide these <br />professional services for an additional compensation, if requested: <br /> <br />• Presentation materials for Planning Commission and/or City Council Meetings related to <br />the Development Concepts. <br />• Cost Estimating services for the Development Concepts. <br />• Detailed Civil Engineering Design (i.e. grading, paving, watermain, sanitary sewer, storm <br />sewer, storm water management, erosion control) for the Development Concepts. <br />• Public Engagement processes. <br />• A Market Study. <br /> <br />Thank you for the opportunity to provide a scope of work for this project. If you wish to authorize <br />this work, we can execute a contract for this scope. If you have questions, please feel free to call <br />me at 763-231-4847 or email me at aharwood@wsbeng.com. <br /> <br />Sincerely, <br /> <br />WSB <br /> <br /> <br /> <br />Alison Harwood <br />Director of Natural Resources <br /> <br />cc: Mark Erichson, WSB
The URL can be used to link to this page
Your browser does not support the video tag.