My WebLink
|
Help
|
About
|
Sign Out
Home
2021.10.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2021 CC Packets
>
2021.10.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 1:26:20 PM
Creation date
10/5/2021 1:18:10 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/4/2021
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lakeview Family Dentistry Site Plan and Variance Requests <br />(2) Practical Difficulties. The applicant for a variance shall establish that there are practical <br />difficulties in complying with the provisions of the zoning regulations. The term “Practical <br />Difficulties” as used in the granting of a variance means: <br /> <br />a. Reasonable Use. The property owner proposes to use the property in a reasonable <br />manner not permitted by the zoning ordinance and; <br /> <br />The applicant is proposing to use the property in a reasonable manner that is consistent <br />with the use of the existing building. It is reasonable to add on to an existing business. <br />The property is subject to a maximum impervious surface coverage of 25% because it is <br />within the Shoreland Overlay District. However, standard C-1 zoning allows up to 90% <br />of the lot to be covered by impervious surface. It is reasonable for a commercial property <br />to need additional impervious surface to meet the minimum parking requirements. <br /> <br />b. Unique Circumstances. The plight of property owner is due to circumstances unique <br />to the property not created by the landowner and; <br /> <br />The property is unique in that it is legal nonconforming and the existing impervious <br />surface of the lot exceeds the maximum impervious surface requirement per ordinance, <br />and therefore any modification to the existing building requires a variance. Additionally, <br />the property is uniquely shape, limiting the design and layout of the site. <br /> <br />c. Character of Neighborhood. The variance, if granted, will not alter the essential <br />character of the neighborhood. <br /> <br />Other neighboring properties are also legal nonconforming to the zoning district <br />requirements and have similar uses and impervious surface coverage. The property is also <br />located within the Downtown District and the applicant is proposing to match the existing <br />architectural details of the building, meeting the Downtown Design Guidelines. The <br />proposed site plan will not alter the essential character of the neighborhood and will <br />continue to conform to the Downtown Design Guidelines. <br /> <br />It is in staff’s opinion that there are practical difficulties in meeting the impervious surface <br />coverage requirement outlined in the Shoreland Overlay District. The applicant’s request to add <br />on to an existing building is reasonable and the expansion is intended to meet the needs of the <br />growing business. The property is unique in that the existing building does not conform to the <br />Shoreland Overlay District standards, although it conforms to the C-1 zoning district standards. <br />The proposed addition and site plan will be of matching materials to the existing building and <br />therefore will not alter the character of the neighborhood. <br /> <br />(3) Spirit and Intent. The granting of the variance would be in keeping with the spirit and <br />intent of this chapter and with the policies of the City’s Comprehensive Plan. <br /> <br />The spirit and intent of the ordinance is to allow central business district properties to have a <br />sufficient amount of parking and buildable area on site to accommodate business operations. The <br />C-1 zoning district allows up to 90% of a lot to be covered by impervious surface coverage to
The URL can be used to link to this page
Your browser does not support the video tag.