Laserfiche WebLink
SWPPP NOTES <br />AND DETAILS <br />C3-3 <br />C ADD f iles pr epar ed by t he Cons ult ant for this p roject ar e <br />instruments of the Consultant professional services for use solely <br />with respect to this project. These CADD files shall not be used <br />on other projects, for additions to this project, or for completion <br />of t his p r ojec t by ot her s w it hou t wr i t te n ap pr ov al b y t he <br />C onsultant . With t he Cons ultant's appr oval, ot hers may be <br />per mit t ed t o ob t ain cop ies of t he C AD D dr aw ing files f or <br />information and reference only. All intentional or unintentional <br />revisions, additions, or deletions to these CADD files shall be <br />made at the full risk of that party making such revisions, additions <br />or deletions and that party shall hold harmless and indemnify the <br />Consultant from any & all responsibilities, claims, and liabilities. <br />PLANNING <br />CIVIL ENGINEERING <br />LAND SURVEYING <br />LANDSCAPE ARCHITECTURE <br />ENVIRONMENTAL <br />7200 Hemlock Lane, Suite 300 <br />Maple Grove, MN 55369 <br />763.424.5505 <br />www.loucksinc.com <br />Plotted: 09 /16 / 2021 12:53 PMW:\2020\20499\CADD DATA\CIVIL\_dwg Sheet Files\C3-3 SWPPP NOTESOUCKSL <br />CADD QUALIFICATION <br />QUALITY CONTROL <br />PROFESSIONAL SIGNATURE <br />SUBMITTAL/REVISIONS <br />LAKEVIEW <br />FAMILY <br />DENTISTRY <br />14475 FOREST BOULEVARD NORTH <br />HUGO, MINNESOTA 55038 <br />LAKEVIEW <br />FAMILY <br />DENTISTRY <br />14475 FOREST BOULEVARD NORTH <br />HUGO, MINNESOTA 55038 <br />08/13/21 CITY SUBMITTAL <br />09/03/21 CITY SUBMITTAL <br />09/16/21 CITY SUBMITTAL <br />Review Date <br />SHEET INDEX <br />License No. <br />Date <br />I hereby certify that this plan, specification or report was <br />prepared by me or under my direct supervision and that <br />I am a duly Licensed Professional Engineer under the <br />laws of the State of Minnesota. <br />Project Lead <br />Drawn By <br />Checked By <br />Loucks Project No. <br />Trevor D. Gruys - PE <br />53706 <br />20499 <br />TDG <br />TDG/MDC <br />TDG <br />09/16/2021 <br />C1-1 EXISTING CONDITIONS <br />C1-2 DEMOLITION PLAN <br />C2-1 SITE PLAN <br />C3-1 GRADING PLAN <br />C3-2 SWPPP <br />C3-3 SWPPP NOTES <br />C4-1 UTILITY PLAN <br />C8-1 CIVIL DETAILS <br />C8-2 CIVIL DETAILS <br />L1-1 LANDSCAPE PLAN <br />L2-1 LANDSCAPE DETAILS <br />P1-1 PHOTOMETRICS PLAN <br />CONSTR <br />U <br />C <br />T <br />I <br />O <br />N <br />NOT FOR <br /> <br />SWPPP NOTES <br />AND DETAILS <br />C3-3 <br />SWPPP NOTES SITE VICINITY MAP CONSTRUCTION STORMWATER SPECIAL WATERS SEARCH MAP <br />1.THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING A <br />PROPOSED BUILDING ADDITION, PARKING LOT, SURFACE PAVEMENTS, <br />INFILTRATION BASIN, AND UTILITIES. <br />2.THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS <br />FOLLOWS: <br />1.INSTALL VEHICLE TRACKING BMP <br />2.INSTALL INLET PROTECTION <br />3.INSTALL SILT FENCE AND BIO-ROLLS AROUND SITE <br />4.CLEAR AND GRUB SITE <br />5.STRIP AND STOCKPILE TOPSOIL <br />6.REMOVE PAVEMENTS AND UTILITIES <br />7.ROUGH GRADE SITE <br />8.IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE <br />9.INSTALL UTILITIES <br />10.INSTALL BUILDING FOUNDATIONS <br />11.INSTALL CURB AND GUTTER <br />12.INSTALL PAVEMENTS AND WALKS <br />13.FINAL GRADE SITE <br />14.REMOVE ACCUMULATED SEDIMENT FROM STORMWATER SYSTEMS <br />15.SEED AND MULCH <br />16.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS <br />STABILIZED, REMOVE SILT FENCE, BIO-ROLLS, INLET PROTECTION, AND <br />RESEED ANY AREAS DISTURBED BY THE REMOVAL. <br />3.SITE DATA <br />DISTURBED AREA: 0.85 AC <br />PRE-CONSTRUCTION IMPERVIOUS AREA:0.26 AC <br />POST-CONSTRUCTION IMPERVIOUS AREA:0.43 AC <br />GENERAL SOIL TYPE:SEE GEOTECHNICAL EVALUATION REPORT <br />4.EROSION AND SEDIMENT CONTROLS WERE DESIGNED TO EFFECTIVELY <br />CONTROL STORMWATER RUNOFF WITHIN THE PROJECT AREAS. EROSION <br />AND SEDIMENT CONTROL HAVE BEEN PROPOSED TO MINIMIZE CHANNEL <br />EROSION AND SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS. <br />FACTORS THAT WERE CONSIDERED INCLUDE PROPOSED IMPERVIOUS AREAS, <br />SLOPE OF IMPERVIOUS SURFACES, STORMWATER INFRASTRUCTURE <br />DISCHARGE POINTS, AND ANNUAL AVERAGE PRECIPITATION DATA FOR THE <br />PROJECT AREA. <br />5.WASHINGTON COUNTY RECEIVES AN AVERAGE OF 33.94 INCHES OF <br />PRECIPITATION PER YEAR. THE FOLLOWING WASHINGTON COUNTY <br />24-HOUR STORM EVENTS ARE BASED ON ATLAS 14 RAINFALL DATA: <br />10-YR 4.16 INCHES <br />100-YR 7.14 INCHES <br />6.SEE "EXHIBIT:PROPOSED DRAINAGE AREAS" FOR SITE MAP WITH DRAINAGE <br />AREA BOUNDARIES. <br />7.THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH <br />FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. <br />8.CONTRACTOR SHALL INSTALL RAIN GAUGE ON SITE. <br />9.NO DEWATERING IS EXPECTED TO OCCUR ON SITE. <br />10.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7 OR MORE DAYS SHALL <br />BE STABILIZED BY SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO <br />SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT <br />CONTROL MEASURE. <br />11.ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS <br />AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. <br />DENOTES SLOPES GREATER THAN 3:1. ALL 3:1 SLOPES TO BE STABILIZED <br />WITH EROSION CONTROL BLANKET <br />12.ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES <br />OF POTENTIAL DISCHARGE ARE STABILIZED. <br />13.SOIL COMPACTION SHALL BE MINIMIZED DURING CONSTRUCTION. <br />14.TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL <br />AND CAN NOT BE PLACED IN SURFACE WATERS OR STORM WATER <br />CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT <br />AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEPMT EX: CLEAN <br />AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND <br />STOCKPILES. <br />15.SEDIMENT CONTROL PRACTICES SHALL BE INSTALLED ON ALL <br />DOWNGRADIENT PERIMETERS AND UPGRADIENT OF ANY BUFFER ZONES. <br />16.SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION <br />BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH <br />THE APPROPRIATE BMP'S. <br />17.SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH <br />MPCA DISPOSAL REQUIREMENTS. <br />18.EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A <br />DEFINED AREA OF THE SITE. RUNOFF MUST BE PROPERLY CONTAINED. <br />19.NO ENGINE DEGREASING IS ALLOWED ON SITE. <br />20.THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE <br />AND IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS <br />OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO SIGNS THE NPDES <br />PERMIT APPLICATION IS A PERMITTEE FOR PARTS II.B., PART II.C, PART II.B-F, <br />PART V, PART IV AND APPLICABLE CONSTRUCTION ACTIVITY REQUIREMENTS <br />FOUND IN APPENDIX A, PART C. OF THE NPDES PERMIT AND IS JOINTLY <br />RESPONSIBLE WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS <br />OF THE PERMIT. <br />21.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE <br />COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA. <br />ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER THE <br />FOLLOWING CONDITIONS HAVE BEEN MET: <br />A.PERMIT TERMINATION CONDITIONS, PER NPDES PERMIT SECTION 13.1 <br />HAVE BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE <br />PERMITTEE IS RESPONSIBLE. <br />A.A.PERMANENT UNIFORM PERENNIAL VEGETATIVE COVER MUST BE <br />ESTABLISHED AT 70% DENSITY OF ITS EXPECTED FINAL GROWTH. <br />A.B.THE PERMANENT STORMWATER TREATMENT SYSTEM IS <br />CONSTRUCTED, MEETS ALL REQUIREMENTS, AND IS OPERATING AS <br />DESIGNED. <br />A.C.ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND <br />SEDIMENT CONTROL BMPS MUST BE REMOVED. <br />A.D.CLEAN OUT SEDIMENT FROM CONVEYANCE SYSTEMS AND <br />PERMANENT STORMWATER TREATMENT SYSTEMS (RETURN TO <br />DESIGN CAPACITY). <br />15. INSPECTIONS <br />A.INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY <br />REPRESENTATIVE IS REQUIRED. <br />B.EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS <br />FOLLOWING A 0.5" OVER 24 HOUR RAIN EVENT. <br />C.STABILIZED AREAS: ONCE EVERY 30 DAYS <br />D.FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO <br />RESUMING <br />CONSTRUCTION. <br />E.INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 <br />YEARS AFTER FILING OF THE NOTICE OF TERMINATION AND MUST <br />INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S) <br />CONDUCTING WORK, FINDING OF INSPECTIONS AND <br />RECOMMENDATIONS FOR CORRECTIVE ACTION, DATE AND AMOUNT <br />OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR <br />PERIOD. <br />F.OBSERVE ANY DISCHARGE OCCURRING ONSITE AND DOCUMENT <br />CORRECTIVE ACTIONS TAKEN. DISCHARGE SHOULD BE DESCRIBED AND <br />PHOTOGRAPHED. <br />16. MINIMUM MAINTENANCE <br />A.ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR <br />SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT <br />BUSINESS DAY AFTER DISCOVERY OR AS SOON AS FIELD CONDITIONS <br />ALLOW. <br />B.SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN <br />NONFUNCTIONAL, OR 1/3 FULL; WITHIN 24 HOURS <br />C.SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES <br />1/2 STORAGE VOLUME. <br />D.SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN DAYS <br />E.CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED <br />WITH 24 HOURS. <br />F.PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER <br />FOR ALL EVENTS GREATER THAN 12" IN 24 HOURS <br />17.THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND <br />MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING <br />CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL <br />CONTROL OF THE SITE. <br />18.OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, <br />THE SWPPP, ALL INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION <br />AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR <br />TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. <br />THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES <br />NOTICE OF TERMINATION. <br />19.SWPPP MUST BE AMENDED WHEN: <br />A.THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER <br />OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON <br />DISCHARGE <br />B.INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND <br />DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS. <br />C.THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN <br />DISCHARGES OR IS NOT CONSISTENT WITH THE TERMS AND <br />CONDITIONS OF THE PERMIT. <br />19.CONCRETE WASHOUT AREA <br />A.CONTRACTOR TO PROVIDE PREFABRICATED CONCRETE WASH-OUT <br />CONTAINER WITH RAIN PROTECTION PER PLAN. <br />B.CONCRETE WASH-OUT TO BE IDENTIFIED WITH SIGNAGE STATING <br />"CONCRETE WASHOUT AREA DO NOT OVERFILL". <br />C.CONCRETE WASHOUT WATER NEEDS TO BE PUMPED WITHIN 24 <br />HOURS OF STANDING WATER IN WASHOUT AREA. <br />20.IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING <br />CONSTRUCTION CONTRACTOR TO CEASE CONSTRUCTION ACTIVITY AND <br />NOTIFY ENGINEER. <br />21.PIPE OULTETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT <br />ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE <br />WATER. <br />22.FINAL STABILIZATION <br />FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACVTIVITIES <br />HAVE BEEN COMPLETED AND THAT DISTURBED AREAS ARE STABILIZED BY A <br />UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE EXPECTED FINAL <br />DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. <br />ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND <br />SEDIMENT SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND <br />SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN <br />CAPACITY. <br />23.RESPONSIBILITIES <br />A.THE OWNER MUST IDENTIFY A PERSON WHO WILL OVERSEE THE SWPPP <br />IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION <br />AND MAINTENANCE: <br />CONTACT: __________________________________ <br /> COMPANY: __________________________________ <br />PHONE: __________________________________ <br />B.THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE <br />FOR LONG TERM OPERATIONS AND MAINTENANCE OF THE <br />PERMANENT STORMWATER MANAGEMENT SYSTEM: <br />CONTACT:__________________________________ <br />COMPANY: __________________________________ <br />PHONE: __________________________________ <br />24.THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR <br />INSPECTIONS OR AS-BUILT DRAWINGS VERIFYING PROPER CONSTRUCTION <br />OF THE BMPS. <br />* <br />PROJECT SITE <br />1 MILE BUFFER <br />* <br />PROJECT SITE <br />1 <br />EROSION CONTROL BLANKET <br />6" <br />6" <br />1' TO 3'ANCHOR TRENCH <br />1.DIG 6"X6" TRENCH <br />2.LAY BLANKETS IN TRENCH <br />3.STAPLE AT 1.5' INTERVALS <br />4.BACKFILL WITH NATURAL SOIL <br />AND COMPACT. <br />5.BLANKET LENGTH SHALL NOT <br />EXCEED 100' WITHOUT AN <br />ANCHOR TRENCH <br />NOTE: <br />SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL <br />CLUMPS, STICKS, VEHICLE IMPRINTS, AND GRASS. <br />BLANKETS SHALL HAVE GOOD SOIL CONTACT. <br />ANCHOR TRENCH <br />(SEE DETAIL AND NOTES BELOW) <br />OVERLAP END JOINTS MINIMUM <br />OF 6" AND STAPLE OVERLAP AT <br />1.5' INTERVALS. <br />OVERLAP LONGITUDINAL <br />JOINTS MINIMUM OF 6" <br />STAPLE PATTERN/DENSITY <br />SHALL FOLLOW <br />MANUFACTURERS <br />SPECIFICATIONS. <br />DI <br />R <br />E <br />C <br />T <br />I <br />O <br />N <br /> <br />O <br />F <br />SU <br />R <br />F <br />A <br />C <br />E <br /> <br />F <br />L <br />O <br />W <br />STAGGER JOINTS <br />DRAWN 2/2016 <br />LOUCKS PLATE NO. <br />3016LOUCKSBIO-ROLL OR <br />ROCK LOG <br />NOTES: <br />1.PLACE BOTTOM EDGE OF WIRE FENCE INTO 6 IN DEEP TRENCH. <br />2.POSTS SHALL BE: <br />·6 FT MAX. SPACING. <br />·STANDARD STEEL T-TYPE POSTS. <br />·5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE GROUND. <br />3.ATTACH WIRE FENCE TO STEEL POSTS WITH NO. 9 GA. ALUMINUM WIRE OR NO. 9 <br />GALVANIZED STEEL PRE-FORMED CLIPS. <br />4.ATTACH FABRIC TO WIRE FENCING WITH WIRE OR ZIP TIES. A MIN. OF 3 ZIP TIES <br />PER POST. EXTEND BOTTOM OF FABRIC INTO TRENCH. <br />5.BACKFILL TRENCH & COMPACT. <br />6.STRAW, WOOD CHIP, COMPOST OR ROCK LOGS PER MNDOT SPECS 3890, 3897. <br />DRAWN 11/2016 <br />LOUCKS PLATE NO. <br />3002LOUCKS <br />2'' X 2'' X 18'' LONG WOODEN <br />STAKES AT 2'-0'' SPACING. DRIVE <br />THROUGH NETTING, NOT <br />PENETRATING FIBER LOG. <br />STRAW OR WOOD FIBER 9" <br />OR 12'' DIA. SEDIMENT <br />LOG ROLL ENCLOSED IN <br />POLYPROPYLENE NETTING <br />FL <br />O <br />W <br />TRENCH IF LOOSE SOILS <br />FLOW <br />ENDS SECURELY CLOSED TO PREVENT <br />LOSS OF OPEN GRADED AGGREGATE <br />FILL. SECURED WITH 50 PSI. ZIP TIE <br />1 <br />NOTES: <br />SEE SPECS. 2573, 3137, 3890 & 3897. <br />MANUFACTURED ALTERNATIVES LISTED ON Mn/DOT'S APPROVED <br />PRODUCTS LIST MAY BE SUBSTITUTED. <br />1.GEOTEXTILE SOCK BETWEEN 4-10 FEET LONG AND 4-6 INCH <br />DIAMETER. SEAM TO BE JOINED BY TWO ROWS OF STITCHING <br />WITH A PLASTIC MESH BACKING OR PROVIDE A HEAT BONDED <br />SEAM (OR APPROVED EQUIVALENT). FILL ROCK LOG WITH <br />OPEN GRADED AGGREGATE CONSISTING OF SOUND <br />DURABLE PARTICLES OF COARSE AGGREGATE CONFORMING <br />TO SPEC. 3137 TABLE 3137-1; CA-3 GRADATION. <br />2 3 <br />4 <br />5 6