LANDSCAPE
<br />DETAILS
<br />L2-1
<br />C ADD f iles pr epar ed by t he Cons ult ant for this p roject ar e
<br />instruments of the Consultant professional services for use solely
<br />with respect to this project. These CADD files shall not be used
<br />on other projects, for additions to this project, or for completion
<br />of t his p r ojec t by ot her s w it hou t wr i t te n ap pr ov al b y t he
<br />C onsultant . With t he Cons ultant's appr oval, ot hers may be
<br />per mit t ed t o ob t ain cop ies of t he C AD D dr aw ing files f or
<br />information and reference only. All intentional or unintentional
<br />revisions, additions, or deletions to these CADD files shall be
<br />made at the full risk of that party making such revisions, additions
<br />or deletions and that party shall hold harmless and indemnify the
<br />Consultant from any & all responsibilities, claims, and liabilities.
<br />PLANNING
<br />CIVIL ENGINEERING
<br />LAND SURVEYING
<br />LANDSCAPE ARCHITECTURE
<br />ENVIRONMENTAL
<br />7200 Hemlock Lane, Suite 300
<br />Maple Grove, MN 55369
<br />763.424.5505
<br />www.loucksinc.com
<br />Plotted: 09 /16 / 2021 12:54 PMW:\2020\20499\CADD DATA\LANDSCAPE\_dwg Sheet Files\LA 2-1OUCKSL
<br />CADD QUALIFICATION
<br />QUALITY CONTROL
<br />PROFESSIONAL SIGNATURE
<br />SUBMITTAL/REVISIONS
<br />LAKEVIEW
<br />FAMILY
<br />DENTISTRY
<br />14475 FOREST BOULEVARD NORTH
<br />HUGO, MINNESOTA 55038
<br />LAKEVIEW
<br />FAMILY
<br />DENTISTRY
<br />14475 FOREST BOULEVARD NORTH
<br />HUGO, MINNESOTA 55038
<br />08/13/21 CITY SUBMITTAL
<br />09/03/21 CITY SUBMITTAL
<br />09/16/21 CITY SUBMITTAL
<br />Nathan W. Ekhoff - LA
<br />Review Date
<br />SHEET INDEX
<br />License No.
<br />Date
<br />I hereby certify that this plan, specification or report was
<br />prepared by me or under my direct supervision and that
<br />I am a duly Licensed Landscape Architect under the laws
<br />of the State of Minnesota.
<br />52050
<br />Project Lead
<br />Drawn By
<br />Checked By
<br />Loucks Project No.20499
<br />NWE
<br />NWE
<br />TDG
<br />09/16/2021
<br />C1-1 EXISTING CONDITIONS
<br />C1-2 DEMOLITION PLAN
<br />C2-1 SITE PLAN
<br />C3-1 GRADING PLAN
<br />C3-2 SWPPP
<br />C3-3 SWPPP NOTES
<br />C4-1 UTILITY PLAN
<br />C8-1 CIVIL DETAILS
<br />C8-2 CIVIL DETAILS
<br />L1-1 LANDSCAPE PLAN
<br />L2-1 LANDSCAPE DETAILS
<br />P1-1 PHOTOMETRICS PLAN
<br />CONSTR
<br />U
<br />C
<br />T
<br />I
<br />O
<br />N
<br />NOT FOR
<br />
<br />LANDSCAPE
<br />DETAILS
<br />L2-1
<br />Gopher State One Call
<br />WARNING:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS
<br />OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY
<br />COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF
<br />LINES.
<br />THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT
<br />651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF
<br />ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES,
<br />VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE
<br />CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
<br />DURING CONSTRUCTION AT NO COST TO THE OWNER.
<br />LOUCKS
<br />Deciduous Tree Planting.dwgSCALE: 1/2" = 1'-0"
<br />2x ROOT BALL WIDTH
<br />NOTE:
<br />CONTRACTOR IS RESPONSIBLE FOR TESTING
<br />PERCOLATION RATES PRIOR TO PLANTING.
<br />NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF
<br />POOR DRAINAGE EXISTS.
<br />DECIDUOUS TREE PLANTING
<br />SET PLANT ON UNDISTURBED NATIVE SOIL
<br />SCARIFY BOTTOM AND SIDES OF HOLE PRIOR
<br />TO PLANTING
<br />EDGE VARIES
<br />WOOD STAKE
<br />BACKFILL WITH IN SITU TOPSOIL
<br />MULCH - 4" DEEP. NO MULCH IN CONTACT WITH
<br />TRUNK - SEE NOTES OR SPECS.
<br />ROOT FLARE EVEN WITH OR JUST ABOVE GRADE
<br />SAFETY FLAGGING - ONE PER WIRE
<br />TREE WRAP TO FIRST BRANCH
<br />16"X2" POLYPROPYLENE OR POLYETHYLENE STRAP
<br />NOTES:
<br />THE CONTRACTOR IS RESPONSIBLE FOR
<br />MAINTAINING ALL TREES IN A PLUMB POSITION
<br />THROUGH THE WARRANTY PERIOD. STAKING IS
<br />SUGGESTED, BUT NOT REQUIRED. ANY STAKING
<br />MUST CONFORM WITH PRACTICES AS DEFINED IN
<br />A.N.A. GUIDELINES FOR STANDARD PRACTICES.
<br />PRUNE DAMAGED AND CROSSING BRANCHES
<br />AFTER PLANTING IS COMPLETE.
<br />CUT BACK WIRE BASKET.
<br />WATER TREE THOROUGHLY DURING PLANTING
<br />OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS AND
<br />SATURATE SOIL WITH WATER. DO NOT COMPACT
<br />MORE THAN NECESSARY TO MAINTAIN PLUMB.
<br />-CONIFEROUS TREE PLANTING LOUCKS
<br />Coniferous Tree Planting.dwgSCALE: 1/2" = 1'-0"
<br />2 x ROOT BALL WIDTH
<br />NOTE:
<br />CONTRACTOR IS RESPONSIBLE FOR TESTING
<br />PERCOLATION RATES PRIOR TO PLANTING.
<br />NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF
<br />POOR DRAINAGE EXISTS.
<br />ROOT BALL SET ON UNDISTURBED SUBGRADE
<br />SCARIFY BOTTOM AND SIDES OF HOLE
<br />PRIOR TO PLANTING
<br />EDGE VARIES - SEE PLAN
<br />WOOD STAKE (OPTIONAL)
<br />BACKFILL WITH IN SITU TOPSOIL
<br />MULCH - 4" DEEP - SEE NOTES OR SPECS. MULCH
<br />MUST NOT BE IN CONTACT WITH TRUNK.
<br />SAFETY FLAGGING - ONE PER WIRE
<br />16" x2" POLYPROPYLENE OR
<br />POLYETHYLENE STRAP
<br />NOTES:
<br />THE CONTRACTOR IS RESPONSIBLE FOR
<br />MAINTAINING ALL TREES IN A PLUMB POSITION
<br />THROUGH THE WARRANTY PERIOD. STAKING IS
<br />SUGGESTED, BUT NOT REQUIRED. ANY STAKING
<br />MUST CONFORM WITH PRACTICES AS DEFINED IN
<br />A.N.A. GUIDELINES FOR STANDARD PRACTICES.
<br />PRUNE ANY DAMAGED BRANCHES AFTER PLANTING
<br />IS COMPLETE.
<br />WATER TREE THOROUGHLY DURING PLANTING
<br />OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS AND
<br />SATURATE SOIL WITH WATER. DO NOT COMPACT
<br />MORE THAN NECESSARY TO MAINTAIN PLUMB.
<br />-
<br />GENERAL NOTES
<br />COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING
<br />INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
<br />NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND
<br />CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA.
<br />ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL
<br />FLAGGING AND LABELS FROM PLANTS.
<br />IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY
<br />DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER
<br />SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT
<br />ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE
<br />DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO
<br />PROCUREMENT AND/OR INSTALLATION.
<br />PROTECT ALL EXISTING TREES ON SITE SCHEDULED TO REMAIN. IF EXISTING
<br />TREES ARE DAMAGED IN ANY MANNER, ABOVE OR BELOW GROUND IN THE
<br />ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT SHOULD BE APPLIED
<br />IMMEDIATELY AFTER WOUNDING.
<br />SOIL & GROUNDCOVER
<br />ALL PLANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS,
<br />AND/OR VINES SHALL RECEIVE A MINIMUM OF 12" DEPTH OF PLANTING SOIL
<br />CONSISTING OF AT LEAST 45 PARTS TOPSOIL, 45 PARTS PEAT OR MANURE
<br />AND 10 PARTS SAND.
<br />WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED
<br />SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC.
<br />SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS
<br />NOTED TO RECEIVE SOD. SEED SHALL BE INSTALLED AND MULCHED AS PER
<br />MNDOT SPECS.
<br />SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL BE
<br />LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS.
<br />ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE
<br />STAKED TO THE GROUND.
<br />LANDSCAPE CONTRACTOR SHALL VERIFY THAT SOIL AND COMPACTION
<br />CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND
<br />AROUND THE BUILDING SITE.
<br />PLANTINGS INFO
<br />ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE
<br />AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF
<br />NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT
<br />LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH.
<br />ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN
<br />BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND
<br />BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE
<br />FINISHED GRADE.
<br />ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE SALES
<br />SHALL NOT BE USED. ALL CONIFEROUS TREES SHALL BE FULL FORM,
<br />NATURAL TO THE SPECIES, WITHOUT PRUNING.
<br />PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS
<br />LOCATED AT THE TOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE
<br />CASE, SOIL SHALL BE REMOVED DOWN TO THE ROOT COLLAR/ROOT FLAIR.
<br />WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOT COLLAR/ROOT
<br />FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.
<br />ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON
<br />PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE
<br />NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE
<br />ARCHITECT MUST BE NOTIFIED.
<br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN
<br />QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES.
<br />NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL
<br />IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE
<br />CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND/OR QUOTATION.
<br />WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN
<br />CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY,
<br />WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL
<br />DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE ALL
<br />WRAPPING AFTER 5-1.
<br />FERTILIZER
<br />ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A
<br />27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER
<br />THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR
<br />SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR
<br />27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN
<br />ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREE
<br />SAUCER.
<br />EDGING FOR PLANTING BEDS
<br />BLACK METAL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND
<br />ANNUALS WHERE BED MEETS SOD/SEED UNLESS NOTED OTHERWISE.
<br />PLANTING BED PREPARATION
<br />ALL ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 3" DEEP
<br />SHREDDED HARDWOOD MULCH WITH NO WEED BARRIER.
<br />ALL SHRUB BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD
<br />MULCH AND FIBER MAT WEED BARRIER.
<br />ALL TREES NOT IN PLANTING BEDS TO RECEIVE 4" DEEP SHREDDED
<br />HARDWOOD MULCH RING WITH NO MULCH IN DIRECT CONTACT WITH
<br />TREE TRUNK.
<br />SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER
<br />MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS.
<br />MAINTENANCE STRIPS TO HAVE EDGER AND MULCH AS
<br />SPECIFIED/INDICATED ON DRAWING OR IN SPECIFICATION.
<br />INSPECTION AND WARRANTY
<br />CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER
<br />ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS.
<br />CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL
<br />NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY
<br />ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER
<br />ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE
<br />PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING,
<br />FERTILIZATION AND DISEASE/PEST CONTROL.
<br />CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE
<br />CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE.
<br />WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS
<br />SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT
<br />AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. NO
<br />PARTIAL ACCEPTANCE WILL BE CONSIDERED.
<br />TIMING OF INSTALLATION
<br />UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT
<br />MATERIAL INSTALLATION AND SEED/SOD PLACEMENT IS FROM THE TIME
<br />GROUND HAS THAWED TO JUNE 15.
<br />FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER 1.
<br />FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15; DORMANT SEEDING IN
<br />THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1. FALL CONIFEROUS
<br />PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1 AND DECIDUOUS
<br />PLANTING FROM THE FIRST FROST UNTIL NOVEMBER 15. PLANTING OUTSIDE
<br />THESE DATES IS NOT RECOMMENDED. ANY ADJUSTMENT MUST BE
<br />APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
<br />TREES ARE NOT TO BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN
<br />APRIL 15 AND JULY 1. NOTIFY LANDSCAPE ARCHITECT IF THESE DATES ARE
<br />UNAVOIDABLE.
<br />IRRIGATION NOTES:
<br />VERIFY EXISTING/PROPOSED IRRIGATION SYSTEM LAYOUT AND CONFIRM
<br />COMPLETE LIMITS OF IRRIGATION PRIOR TO SUPPLYING SHOP DRAWINGS.
<br />LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN
<br />IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE SCOPE OF
<br />WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE
<br />ARCHITECT PRIOR TO ORDER AND/OR INSTALLATION. IT SHALL BE THE
<br />LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL
<br />SODDED/SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING
<br />THOSE AREAS DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION.
<br />THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN
<br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND
<br />TO PLANT MATERIAL GROWTH REQUIREMENTS.
<br />IRRIGATION SYSTEM IS NOT TO SPRINKLE ACROSS PAVEMENT NOR SHALL THE
<br />SYSTEM SPRINKLE THE BUILDING.
<br />THE SYSTEM SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION SYSTEM.
<br />PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED
<br />REGULARLY UNTIL PLANTING/SOD/SEED HAS BEEN ESTABLISHED.
<br />LANDSCAPE INSTALLATION:
<br />SHRUBS TO BE PLACED SO THAT
<br />SHREDDED HARDWOOD MULCH - 3" DEEP.
<br />LANDSCAPE FABRIC - SEE SPEC.
<br />PLANTING SOIL - SEE SPEC.
<br />SCARIFY BOTTOM AND SIDES OF
<br />HOLE PRIOR TO PLANTING
<br />LOOSEN ROOTS OF ALLCONTAINERIZED PLANTS.
<br />EDGE VARIES - REFER TO PLAN
<br />REFER TO PLAN
<br />18" MIN.
<br />SCALE: 3/4" = 1'-0"
<br />SHRUB PLANTING DETAIL
<br />EDGING MATERIAL - SEE SPEC.
<br />BUILDING WALL (TYP)
<br />TOP OF CONTAINER SITS FLUSH
<br />WITH PROPOSED GRADE.
<br />1
<br />L2-1
<br />PERENNIAL PLANTING
<br />SCALE: 3/4" = 1'-0"Perennial.Dwg
<br />LOOSEN ROOTS OF
<br />PLANT MATERIAL PRIOR
<br />MULCH - 3" MIN. DEPTH
<br /> - SEE NOTES OR SPECS.
<br />EDGER - SEE NOTES OR SPECS.
<br />12" DEPTH (MIN). LOAM PLANTING
<br />SOIL - SEE NOTES OR SPECS.
<br />VARIES
<br />SEE PLAN
<br />TO PLANTING
<br />EDGE VARIES - SEE PLAN
<br />2
<br />L2-1
|