Laserfiche WebLink
6' WIDE OVERFLOW WEIR <br />@ 931.00 <br />RAIN <br />GAURDIAN <br />EX. 6" <br />DIP STUB \ <br />>X c� <br />0 <br />Know what's below. <br />Call before you dig. <br />F <br />l i <br />/ 1 -4�4J33.55 <br />932 x 33:9$...933. <br />TC <br />\k <br />940.06 <br />93j.92 <br />=`JZ .0 <br />B=929.0 <br />INS <br />.-TALL Fr, <br />'�N10�/ng �/Vl(SlX3 <br />2 C' Y CL <br />RIPRAP AT I <br />SpOtpr <br />(N S 933.36 <br />PJ X BIT <br />X 933.26 <br />BIT 933.29 <br />� rON <br />X BIT <br />4 BIT <br />933.32 <br />E T=932.0 XBIT <br />93............................. 933.17 B=929.0 X933.47 D <br />NURP BASIS (p2 BIT 0 <br />933.39 <br />- <br />933.11 XBIT � � U <br />X BIT <br />933.19 w BIT <br />93 5 x 933.00 <br />:.................... <br />.............................. <br />933.09......... ....... RIPRAP qT <br />if <br />IT <br />• . 932. �PpV T FO <br />. .. ... Br,� LDING B S S ...................... <br />I _ <br />1 F1 ...7 11 13� 0 °' "s o FOR LOwEq DEPTH <br />/ m v :: UT <br />AT <br />Z o0 o GRAD O SIDE <br />33 . E <br />�932.50 <br />IBIT 93dn7 <br />X BI1� 9 1.6 <br />IF <br />T=932.0 B <br />B=929.0 <br />i <br />932.32 <br />E <br />j 931.76 ch 93 <br />�S 'I EBT CD TC <br />S = <br />JTC <br />�. ....9. <br />.90 <br />TC <br />.�• ice % W <br />W � <br />_ O 0 Z N c <br />o c 2.s �' I - �1 ^� a <br />_ oo <br />M 0 Q) 9 2 <br />C-24 % <br />......' ,' ..... •............ <br />> TOP OF BER NN 9 m <br />_> 932. M 3 7...... .1 . .60 6 O s <br />_ 50 iTYP) �9 , <br />9 <br />>_> Y CL. �3 ......93.. <br />RAP q" I 3- `. RIP Sz <br />_> SPpur ���-� _ 931 Sb0 <br />cc_ S 3S / <br />w A y >=�P) 32. <br />,1 B <br />v _ROCK <br />>_ EN s-rRUCTION <br />NCE <br />� SAN• S EWE R >_ <br />933.37 Gr TC <br />3 .5 <br />2'92 3 .8 <br />UE _ <br />Y m <br />0 <br />a� <br />g rm <br />U rn <br />Z= <br />w C <br />> <br />w >� <br />r. 3.14 <br />V <br />V <br />I � <br />M <br />N <br />V G)V <br />I I <br />w <br />z <br />V V <br />V <br />9 IV <br />V <br />V <br />0 .� <br />W <br />X O V <br />V <br />V <br />V <br />MHO <br />00.0t'6 <br />INLET <br />PROTECTION <br />(TYP. ) <br />W <br />0 <br />y <br />V <br />Cn <br />V ~ <br />m <br />m <br />V T� <br />O <br />V Z <br />W <br />v / <br />V X <br />C) <br />V TAftft <br />O <br />rn <br />o � � <br />N o °; 00%tg <br />u <br />w z <br />> <br />zzz <br />SITE SEQUENCING <br />• PRIOR TO ANY GRADING OPERATIONS, THE CONTRACTOR SHALL INSTALL ROCK CONSTRUCTION ENTRANCE (LOCATIONS TO BE <br />DETERMINED - COORDINATE WITH OWNER) AND PERIMETER SILT FENCE AS SHOWN ON PLAN. (CONTACT CITY TO INSPECT EROSION <br />CONTROL MEASURES PRIOR TO GRADING OPERATIONS, IF NECESSARY.) ADDITIONAL SILT FENCE MAY BE NECESSARY IF LOCAL <br />CONDITIONS REQUIRE. <br />• THE CONTRACTOR SHALL PROVIDE ALL SOD, SEED, MULCH AND FERTILIZER WHICH SHALL CONFORM WITH THE FOLLOWING MNDOT <br />SPECIFICATIONS AS MODIFIED BELOW. <br />ITEM <br />MNDOT SPECIFICATION/NOTES <br />SOD <br />3878 <br />SEED ** <br />3876 <br />* FOR TURF ESTABLISHMENT <br />COMMERCIAL TURF <br />MNDOT MIX 25-131 (220 LBS/ACRE) <br />RESIDENTIAL TURF <br />MNDOT MIX 25-131 (120 LBS/ACRE) <br />TEMPORARY FALL COVER <br />MNDOT MIX 21-112 (100 LBS/ACRE) <br />SPRING/SUMMER <br />MNDOT MIX 21-111 (100 LBS/ACRE) <br />SOIL -BUILDING COVER <br />MNDOT MIX 21-113 (110 LBS/ACRE) <br />1-2 YEARS COVER <br />MNDOT MIX 22-111 (30.5 LBS/ACRE) <br />2-5 YEARS COVER <br />MNDOT MIX 22-112 (40 LBS/ACRE) <br />MULCH <br />3882 (TYPE 1 - DISC ANCHORED) <br />FERTILIZER <br />3881 <br />WOOD FIBER BLANKET <br />3885 (CATEGORY 2) <br />* MOW A MINIMUM OF ONCE PER 2 WEEKS <br />** SEEDED AREAS SHALL BE EITHER MULCHED OR COVERED BY FIBROUS BLANKETS <br />TO PROTECT SEEDS AND LIMIT EROSION. <br />• ALL EXPOSED SOILS MUST HAVE TEMPORARY EROSION CONTROL PROTECTION OR PERMANENT COVER WITHIN FOURTEEN (14) DAYS. <br />• THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY LINES AND MAKE SURE THE EROSION <br />CONTROL PRACTICES INPLACE IN THOSE AREAS PREVENT MIGRATION OF SEDIMENT ONTO ADJACENT PROPERTIES. <br />• THE CONTRACTOR SHALL MAINTAIN SILT FENCE, INCLUDING THE REMOVAL OF ACCUMULATED SEDIMENT, THROUGH COMPLETION OF <br />BUILDING CONSTRUCTION. SILT FENCE TO BE REMOVED ONLY AFTER COMPLETION OF BUILDING CONSTRUCTION AND UPON <br />ESTABLISHMENT OF VEGETATION. <br />• THE CONTRACTOR SHALL PROVIDE WOOD FIBER BLANKET FOR ALL AREAS OF CONCENTRATED FLOW AND FOR ALL SLOPES 3:1 OR GREATER. <br />• PROTECT ALL STORM WATER MANAGEMENT FACILITIES FROM CONSTRUCTION RUN-OFF. CONTRACTOR TO INSTALL AND CONSTRUCT SAID <br />FACILITIES ONCE SITE HAS BEEN STABILIZED. <br />• IF ANY SLOPES APPEAR TO BE FAILING, THE CONTRACTOR SHALL PROVIDE ADDITIONAL SILT FENCE, BIOROLLS AND EROSION <br />CONTROL BLANKET AS NEEDED. <br />• THE CONTRACTOR SHALL FINAL GRADE SWALE AREAS UPON STABILIZATION OF UPSTREAM AREAS. <br />• THE CONTRACTOR SHALL SOD ALL DISTURBED DRAINAGE AREAS, INCLUDING SWALES & OVERFLOWS. <br />• UPON GRADING COMPLETION THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOIL WITH SOD OR SEED, AND MULCH ANCHORED WITH A <br />STRAIGHT SET DISC WITHIN 48 HOURS OF FINAL GRADING. <br />• EXCESS SOIL SHOULD BE TREATED LIKE OTHER EXPOSED SOIL AND STABILIZED WITHIN 72 HOURS. ANY SOIL STOCKPILES ARE TO HAVE <br />SILT FENCE PLACED ON DOWNSTREAM SIDES. <br />• IF A STREET, ALLEY, SIDEWALK OR OTHER PUBLIC PLACE SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL CAUSE SUCH <br />SOILING OR LITTERING TO BE CLEANED UP BY SWEEPING NOT LATER THAN THE END OF THE WORKING DAY IN WHICH SUCH SOILING OR <br />LITTERING SHALL HAVE OCCURRED OR BEEN OBSERVED. <br />OTHER POLLUTION CONTROL MEASURES <br />CONSTRUCTION WASTE MATERIALS - ALL WASTE MATERIALS GENERATED AS A RESULT OF SITE CONSTRUCTION SHALL BE COLLECTED AND <br />REMOVED ACCORDING TO ALL LOCAL AND/OR STATE WASTE MANAGEMENT REGULATIONS BY A LICENSED SOLID WASTE MANAGEMENT <br />COMPANY. THE CONTRACTOR WILL ENSURE THAT ALL SITE PERSONNEL ARE INSTRUCTED IN THESE PRACTICES. <br />HAZARDOUS WASTES - ALL HAZARDOUS WASTE MATERIALS SHALL BE STORED PROPERLY TO PREVENT SPILLS AND VANDALISM. WHEN <br />NECESSARY, HAZARDOUS WASTES WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL AND/OR STATE REGULATION OR BY THE <br />MANUFACTURER. <br />SANITARY WASTE - ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS BY A LOCAL, LICENSED WATER MANAGEMENT <br />COMPANY, AS REQUIRED BY LOCAL REGULATION. <br />OFFSITE VEHICLE TRACKING - A ROCK CONSTRUCTION ENTRANCE HAS BEEN PROVIDED TO HELP REDUCE VEHICLE TRACKING OF <br />SEDIMENTS. IF A STREET, ALLEY, SIDEWALK OR OTHER PUBLIC PLACE SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL <br />CAUSE SUCH SOILING OR LITTERING TO BE CLEANED UP BY SWEEPING NOT LATER THAN THE END OF THE WORKING DAY IN WHICH SUCH <br />SOILING OR LITTERING SHALL HAVE OCCURRED OR BEEN OBSERVED. DUMP TRUCKS HAULING LOOSE MATERIALS (SAND, TOPSOIL, ETC.) <br />TO AND/OR FROM THE SITE SHALL BE COVERED WITH A TARPAULIN. <br />VEHICLE CLEANING - NO ENGINE DEGREASING IS ALLOWED ON -SITE. EXTERNAL WASHING OF VEHICLES TO BE CONFINED TO A DEFINED <br />AREA ("BONE YARD") ON -SITE. CONTRACTOR TO PROVIDE DESIGNATED TRUCK WASHOUT AREA WITH APPROPRIATE SIGNAGE. WASHOUT <br />AREA IS TO BE A MINIMUM OF 50' FROM DITCHES, PONDS, OR OTHER STORMWATER FEATURES. ALL LIQUID AND SOLID WASTE GENERATED <br />BY WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER (E.G. COMPACTED <br />CLAY LINER, IMPERMEABLE GEO-MEMBRANE) AND DISPOSED OF PROPERLY. <br />SPILL PREVENTION AND CONTROL ALL VEHICLES WILL BE CHECKED FOR LEAKING OIL AND FLUIDS. VEHICLES LEAKING FLUIDS WILL NOT <br />BE ALLOWED ON -SITE. SPILL KITS WILL BE STORED ON -SITE AND ALL SPILLS WILL BE CLEANED UP IMMEDIATELY DISCOVERY. SPENT <br />ABSORBENT MATERIALS AND RAGS WILL BE HAULED OFF -SITE IMMEDIATELY AFTER THE SPILL IS CLEANED UP AND PROPERTY DISPOSED <br />OF. SPILL PREVENTION AND CONTROL MEASURES SHALL BE IMPLEMENTED ONCE CONSTRUCTION BEGINS. <br />SOIL STOCKPILES - INSTALL SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AROUND ALL TEMPORARY SOIL STOCKPILES. LOCATE <br />SOIL OR DIRT STOCKPILES SUCH THAT DOWNSLOPE DRAINAGE LENGTH IS NO LESS THAN 8 M (25 FEET) FROM THE TOE OF THE PILE TO A <br />SURFACE WATER, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS <br />THERE IS A BYPASS IN PLACE FOR THE STORMWATER. IF REMAINING FOR MORE THAN 7 DAYS, STABILIZE THE STOCKPILES BY MULCHING, <br />VEGETATIVE COVER, TARPS, OR OTHER MEANS. DURING STREET REPAIR, COVER CONSTRUCTION SOIL OR DIRT STOCKPILES LOCATED <br />CLOSER THAN 8 M (25 FEET) TO A ROADWAY OR DRAINAGE CHANNEL WITH TARPS, AND PROTECT STORM SEWER INLETS WITH SILT SOCKS <br />OR STAKED SILT FENCE. <br />PROVIDE WIMCO (OR APPROVED EQUAL) FOR INLET PROTECTION AT ALL EXISTING STORM SEWER INLETS THAT WILL RECEIVE RUN-OFF <br />DURING CONSTRUCTION. INLET PROTECTION TO REMAIN IN -PLACE UNTIL AT LEAST 70% OF SITE VEGETATION HAS BEEN ESTABLISHED. <br />CONTRACTOR TO PROVIDE DESIGNATED CONCRETE TRUCK WASHOUT AREA WITH APPROPRIATE SIGNAGE. KEEP WASHOUT AREAS AS FAR <br />AS PRACTICAL FROM STORM DRAINS, DITCHES AND PONDS. DO NOT ALLOW RUN-OFF FROM THIS AREA BY CONSTRUCTING A TEMPORARY <br />PIT OR BERMED AREA LARGE ENOUGH FOR LIQUID AND SOLID WASTE. AFTER WASTE CONCRETE IS SET, BREAK-UP AND DISPOSE OF <br />PROPERLY. <br />THE CONTRACTOR MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING (E.G., PUMPED DISCHARGES, <br />TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROTECT SITE UNLESS INFEASIBLE <br />THE CONTRACTOR MAY DISCHARGE FROM THE TEMPORARY OR PERMANENT SEDIMENTATION BASINS TO SURFACE WATERS IF THE BASIN <br />WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT NUISANCE <br />CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IF THE WATER CANNOT BE DISCHARGED TO A <br />SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH THAT THE <br />DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM PROPERTIES. <br />PERSON WHO WILL OVERSEE IMPLEMENTATION OF SWPPP ("CONTRACTOR") <br />TBD <br />GRADING, DRAINAGE, AND EROSION CONTROL PLAN <br />EAGLES LANDING <br />DRAWN BY: DESIGN BY: <br />M.Q.A. C.W.P. <br />CHCKD BY: PROJ. NO. <br />M.Q.A. 20-1906 <br />ORIGINAL DATE: <br />MAY 1, 2020 <br />Z <br />0 <br />IY <br />U <br />U) <br />W <br />0 <br />z <br />0 <br />Cn <br />> <br />W <br />n <br />i <br />m <br />IY <br />U <br />Z <br />0 <br />m <br />m <br />0 <br />0 <br />Q <br />U) <br />W <br />0 <br />C� <br />0 <br />W <br />Q <br />0 <br />s <br />Q <br />z_ <br />0 <br />z <br />0 <br />W <br />06 <br />Z <br />Q <br />J <br />a- <br />W <br />I- <br />0 <br />w <br />U) <br />> <br />W <br />N <br />E <br />>, E <br />-0 m N <br />co <br />a: <br />cn m c <br />.o w <br />D <br />f6 ny� <br />L <br />a) L <br />L O <br />Z <br />J <br />0- <br />W <br />I.- <br />0 <br />W <br />U) <br />> <br />W <br />y <br />y <br />�V <br />U) <br />H <br />0 <br />0- <br />U) <br />LL <br />0 <br />IY <br />IY <br />0 <br />LL <br />0- <br />tY <br />d <br />iY <br />0 <br />W <br />0 <br />0 <br />Q <br />O <br />N <br />rn <br />N <br />Z <br />O <br />co <br />0 <br />W <br />0 Z <br />aJ <br />W a <br />00 <br />Q � <br />Z <br />Z <br />00 <br />U <br />C� <br />Z_ <br />0 <br />Q <br />0 <br />PREPARED FOR: <br />VICTOR LAND <br />HOLDINGS <br />SITE PLANNING <br />& ENGINEERING <br />PLOWE <br />ENGINEERING, INC. <br />6776 LAKE DRIVE <br />SUITE 110 <br />LINO LAKES, MN 55014 <br />PHONE: (651) 361-8210 <br />FAX: (651) 361-8701 <br />I• _ <br />0 <br />2 <br />0 15 30 <br />1 INCH = 30 FEET <br />C2 <br />