6' WIDE OVERFLOW WEIR
<br />@ 931.00
<br />RAIN
<br />GAURDIAN
<br />EX. 6"
<br />DIP STUB \
<br />>X c�
<br />0
<br />Know what's below.
<br />Call before you dig.
<br />F
<br />l i
<br />/ 1 -4�4J33.55
<br />932 x 33:9$...933.
<br />TC
<br />\k
<br />940.06
<br />93j.92
<br />=`JZ .0
<br />B=929.0
<br />INS
<br />.-TALL Fr,
<br />'�N10�/ng �/Vl(SlX3
<br />2 C' Y CL
<br />RIPRAP AT I
<br />SpOtpr
<br />(N S 933.36
<br />PJ X BIT
<br />X 933.26
<br />BIT 933.29
<br />� rON
<br />X BIT
<br />4 BIT
<br />933.32
<br />E T=932.0 XBIT
<br />93............................. 933.17 B=929.0 X933.47 D
<br />NURP BASIS (p2 BIT 0
<br />933.39
<br />-
<br />933.11 XBIT � � U
<br />X BIT
<br />933.19 w BIT
<br />93 5 x 933.00
<br />:....................
<br />..............................
<br />933.09......... ....... RIPRAP qT
<br />if
<br />IT
<br />• . 932. �PpV T FO
<br />. .. ... Br,� LDING B S S ......................
<br />I _
<br />1 F1 ...7 11 13� 0 °' "s o FOR LOwEq DEPTH
<br />/ m v :: UT
<br />AT
<br />Z o0 o GRAD O SIDE
<br />33 . E
<br />�932.50
<br />IBIT 93dn7
<br />X BI1� 9 1.6
<br />IF
<br />T=932.0 B
<br />B=929.0
<br />i
<br />932.32
<br />E
<br />j 931.76 ch 93
<br />�S 'I EBT CD TC
<br />S =
<br />JTC
<br />�. ....9.
<br />.90
<br />TC
<br />.�• ice % W
<br />W �
<br />_ O 0 Z N c
<br />o c 2.s �' I - �1 ^� a
<br />_ oo
<br />M 0 Q) 9 2
<br />C-24 %
<br />......' ,' ..... •............
<br />> TOP OF BER NN 9 m
<br />_> 932. M 3 7...... .1 . .60 6 O s
<br />_ 50 iTYP) �9 ,
<br />9
<br />>_> Y CL. �3 ......93..
<br />RAP q" I 3- `. RIP Sz
<br />_> SPpur ���-� _ 931 Sb0
<br />cc_ S 3S /
<br />w A y >=�P) 32.
<br />,1 B
<br />v _ROCK
<br />>_ EN s-rRUCTION
<br />NCE
<br />� SAN• S EWE R >_
<br />933.37 Gr TC
<br />3 .5
<br />2'92 3 .8
<br />UE _
<br />Y m
<br />0
<br />a�
<br />g rm
<br />U rn
<br />Z=
<br />w C
<br />>
<br />w >�
<br />r. 3.14
<br />V
<br />V
<br />I �
<br />M
<br />N
<br />V G)V
<br />I I
<br />w
<br />z
<br />V V
<br />V
<br />9 IV
<br />V
<br />V
<br />0 .�
<br />W
<br />X O V
<br />V
<br />V
<br />V
<br />MHO
<br />00.0t'6
<br />INLET
<br />PROTECTION
<br />(TYP. )
<br />W
<br />0
<br />y
<br />V
<br />Cn
<br />V ~
<br />m
<br />m
<br />V T�
<br />O
<br />V Z
<br />W
<br />v /
<br />V X
<br />C)
<br />V TAftft
<br />O
<br />rn
<br />o � �
<br />N o °; 00%tg
<br />u
<br />w z
<br />>
<br />zzz
<br />SITE SEQUENCING
<br />• PRIOR TO ANY GRADING OPERATIONS, THE CONTRACTOR SHALL INSTALL ROCK CONSTRUCTION ENTRANCE (LOCATIONS TO BE
<br />DETERMINED - COORDINATE WITH OWNER) AND PERIMETER SILT FENCE AS SHOWN ON PLAN. (CONTACT CITY TO INSPECT EROSION
<br />CONTROL MEASURES PRIOR TO GRADING OPERATIONS, IF NECESSARY.) ADDITIONAL SILT FENCE MAY BE NECESSARY IF LOCAL
<br />CONDITIONS REQUIRE.
<br />• THE CONTRACTOR SHALL PROVIDE ALL SOD, SEED, MULCH AND FERTILIZER WHICH SHALL CONFORM WITH THE FOLLOWING MNDOT
<br />SPECIFICATIONS AS MODIFIED BELOW.
<br />ITEM
<br />MNDOT SPECIFICATION/NOTES
<br />SOD
<br />3878
<br />SEED **
<br />3876
<br />* FOR TURF ESTABLISHMENT
<br />COMMERCIAL TURF
<br />MNDOT MIX 25-131 (220 LBS/ACRE)
<br />RESIDENTIAL TURF
<br />MNDOT MIX 25-131 (120 LBS/ACRE)
<br />TEMPORARY FALL COVER
<br />MNDOT MIX 21-112 (100 LBS/ACRE)
<br />SPRING/SUMMER
<br />MNDOT MIX 21-111 (100 LBS/ACRE)
<br />SOIL -BUILDING COVER
<br />MNDOT MIX 21-113 (110 LBS/ACRE)
<br />1-2 YEARS COVER
<br />MNDOT MIX 22-111 (30.5 LBS/ACRE)
<br />2-5 YEARS COVER
<br />MNDOT MIX 22-112 (40 LBS/ACRE)
<br />MULCH
<br />3882 (TYPE 1 - DISC ANCHORED)
<br />FERTILIZER
<br />3881
<br />WOOD FIBER BLANKET
<br />3885 (CATEGORY 2)
<br />* MOW A MINIMUM OF ONCE PER 2 WEEKS
<br />** SEEDED AREAS SHALL BE EITHER MULCHED OR COVERED BY FIBROUS BLANKETS
<br />TO PROTECT SEEDS AND LIMIT EROSION.
<br />• ALL EXPOSED SOILS MUST HAVE TEMPORARY EROSION CONTROL PROTECTION OR PERMANENT COVER WITHIN FOURTEEN (14) DAYS.
<br />• THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY LINES AND MAKE SURE THE EROSION
<br />CONTROL PRACTICES INPLACE IN THOSE AREAS PREVENT MIGRATION OF SEDIMENT ONTO ADJACENT PROPERTIES.
<br />• THE CONTRACTOR SHALL MAINTAIN SILT FENCE, INCLUDING THE REMOVAL OF ACCUMULATED SEDIMENT, THROUGH COMPLETION OF
<br />BUILDING CONSTRUCTION. SILT FENCE TO BE REMOVED ONLY AFTER COMPLETION OF BUILDING CONSTRUCTION AND UPON
<br />ESTABLISHMENT OF VEGETATION.
<br />• THE CONTRACTOR SHALL PROVIDE WOOD FIBER BLANKET FOR ALL AREAS OF CONCENTRATED FLOW AND FOR ALL SLOPES 3:1 OR GREATER.
<br />• PROTECT ALL STORM WATER MANAGEMENT FACILITIES FROM CONSTRUCTION RUN-OFF. CONTRACTOR TO INSTALL AND CONSTRUCT SAID
<br />FACILITIES ONCE SITE HAS BEEN STABILIZED.
<br />• IF ANY SLOPES APPEAR TO BE FAILING, THE CONTRACTOR SHALL PROVIDE ADDITIONAL SILT FENCE, BIOROLLS AND EROSION
<br />CONTROL BLANKET AS NEEDED.
<br />• THE CONTRACTOR SHALL FINAL GRADE SWALE AREAS UPON STABILIZATION OF UPSTREAM AREAS.
<br />• THE CONTRACTOR SHALL SOD ALL DISTURBED DRAINAGE AREAS, INCLUDING SWALES & OVERFLOWS.
<br />• UPON GRADING COMPLETION THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOIL WITH SOD OR SEED, AND MULCH ANCHORED WITH A
<br />STRAIGHT SET DISC WITHIN 48 HOURS OF FINAL GRADING.
<br />• EXCESS SOIL SHOULD BE TREATED LIKE OTHER EXPOSED SOIL AND STABILIZED WITHIN 72 HOURS. ANY SOIL STOCKPILES ARE TO HAVE
<br />SILT FENCE PLACED ON DOWNSTREAM SIDES.
<br />• IF A STREET, ALLEY, SIDEWALK OR OTHER PUBLIC PLACE SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL CAUSE SUCH
<br />SOILING OR LITTERING TO BE CLEANED UP BY SWEEPING NOT LATER THAN THE END OF THE WORKING DAY IN WHICH SUCH SOILING OR
<br />LITTERING SHALL HAVE OCCURRED OR BEEN OBSERVED.
<br />OTHER POLLUTION CONTROL MEASURES
<br />CONSTRUCTION WASTE MATERIALS - ALL WASTE MATERIALS GENERATED AS A RESULT OF SITE CONSTRUCTION SHALL BE COLLECTED AND
<br />REMOVED ACCORDING TO ALL LOCAL AND/OR STATE WASTE MANAGEMENT REGULATIONS BY A LICENSED SOLID WASTE MANAGEMENT
<br />COMPANY. THE CONTRACTOR WILL ENSURE THAT ALL SITE PERSONNEL ARE INSTRUCTED IN THESE PRACTICES.
<br />HAZARDOUS WASTES - ALL HAZARDOUS WASTE MATERIALS SHALL BE STORED PROPERLY TO PREVENT SPILLS AND VANDALISM. WHEN
<br />NECESSARY, HAZARDOUS WASTES WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL AND/OR STATE REGULATION OR BY THE
<br />MANUFACTURER.
<br />SANITARY WASTE - ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS BY A LOCAL, LICENSED WATER MANAGEMENT
<br />COMPANY, AS REQUIRED BY LOCAL REGULATION.
<br />OFFSITE VEHICLE TRACKING - A ROCK CONSTRUCTION ENTRANCE HAS BEEN PROVIDED TO HELP REDUCE VEHICLE TRACKING OF
<br />SEDIMENTS. IF A STREET, ALLEY, SIDEWALK OR OTHER PUBLIC PLACE SHOULD BECOME SOILED OR LITTERED, THE CONTRACTOR SHALL
<br />CAUSE SUCH SOILING OR LITTERING TO BE CLEANED UP BY SWEEPING NOT LATER THAN THE END OF THE WORKING DAY IN WHICH SUCH
<br />SOILING OR LITTERING SHALL HAVE OCCURRED OR BEEN OBSERVED. DUMP TRUCKS HAULING LOOSE MATERIALS (SAND, TOPSOIL, ETC.)
<br />TO AND/OR FROM THE SITE SHALL BE COVERED WITH A TARPAULIN.
<br />VEHICLE CLEANING - NO ENGINE DEGREASING IS ALLOWED ON -SITE. EXTERNAL WASHING OF VEHICLES TO BE CONFINED TO A DEFINED
<br />AREA ("BONE YARD") ON -SITE. CONTRACTOR TO PROVIDE DESIGNATED TRUCK WASHOUT AREA WITH APPROPRIATE SIGNAGE. WASHOUT
<br />AREA IS TO BE A MINIMUM OF 50' FROM DITCHES, PONDS, OR OTHER STORMWATER FEATURES. ALL LIQUID AND SOLID WASTE GENERATED
<br />BY WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK -PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER (E.G. COMPACTED
<br />CLAY LINER, IMPERMEABLE GEO-MEMBRANE) AND DISPOSED OF PROPERLY.
<br />SPILL PREVENTION AND CONTROL ALL VEHICLES WILL BE CHECKED FOR LEAKING OIL AND FLUIDS. VEHICLES LEAKING FLUIDS WILL NOT
<br />BE ALLOWED ON -SITE. SPILL KITS WILL BE STORED ON -SITE AND ALL SPILLS WILL BE CLEANED UP IMMEDIATELY DISCOVERY. SPENT
<br />ABSORBENT MATERIALS AND RAGS WILL BE HAULED OFF -SITE IMMEDIATELY AFTER THE SPILL IS CLEANED UP AND PROPERTY DISPOSED
<br />OF. SPILL PREVENTION AND CONTROL MEASURES SHALL BE IMPLEMENTED ONCE CONSTRUCTION BEGINS.
<br />SOIL STOCKPILES - INSTALL SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AROUND ALL TEMPORARY SOIL STOCKPILES. LOCATE
<br />SOIL OR DIRT STOCKPILES SUCH THAT DOWNSLOPE DRAINAGE LENGTH IS NO LESS THAN 8 M (25 FEET) FROM THE TOE OF THE PILE TO A
<br />SURFACE WATER, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS
<br />THERE IS A BYPASS IN PLACE FOR THE STORMWATER. IF REMAINING FOR MORE THAN 7 DAYS, STABILIZE THE STOCKPILES BY MULCHING,
<br />VEGETATIVE COVER, TARPS, OR OTHER MEANS. DURING STREET REPAIR, COVER CONSTRUCTION SOIL OR DIRT STOCKPILES LOCATED
<br />CLOSER THAN 8 M (25 FEET) TO A ROADWAY OR DRAINAGE CHANNEL WITH TARPS, AND PROTECT STORM SEWER INLETS WITH SILT SOCKS
<br />OR STAKED SILT FENCE.
<br />PROVIDE WIMCO (OR APPROVED EQUAL) FOR INLET PROTECTION AT ALL EXISTING STORM SEWER INLETS THAT WILL RECEIVE RUN-OFF
<br />DURING CONSTRUCTION. INLET PROTECTION TO REMAIN IN -PLACE UNTIL AT LEAST 70% OF SITE VEGETATION HAS BEEN ESTABLISHED.
<br />CONTRACTOR TO PROVIDE DESIGNATED CONCRETE TRUCK WASHOUT AREA WITH APPROPRIATE SIGNAGE. KEEP WASHOUT AREAS AS FAR
<br />AS PRACTICAL FROM STORM DRAINS, DITCHES AND PONDS. DO NOT ALLOW RUN-OFF FROM THIS AREA BY CONSTRUCTING A TEMPORARY
<br />PIT OR BERMED AREA LARGE ENOUGH FOR LIQUID AND SOLID WASTE. AFTER WASTE CONCRETE IS SET, BREAK-UP AND DISPOSE OF
<br />PROPERLY.
<br />THE CONTRACTOR MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING (E.G., PUMPED DISCHARGES,
<br />TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROTECT SITE UNLESS INFEASIBLE
<br />THE CONTRACTOR MAY DISCHARGE FROM THE TEMPORARY OR PERMANENT SEDIMENTATION BASINS TO SURFACE WATERS IF THE BASIN
<br />WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT NUISANCE
<br />CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IF THE WATER CANNOT BE DISCHARGED TO A
<br />SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH THAT THE
<br />DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM PROPERTIES.
<br />PERSON WHO WILL OVERSEE IMPLEMENTATION OF SWPPP ("CONTRACTOR")
<br />TBD
<br />GRADING, DRAINAGE, AND EROSION CONTROL PLAN
<br />EAGLES LANDING
<br />DRAWN BY: DESIGN BY:
<br />M.Q.A. C.W.P.
<br />CHCKD BY: PROJ. NO.
<br />M.Q.A. 20-1906
<br />ORIGINAL DATE:
<br />MAY 1, 2020
<br />Z
<br />0
<br />IY
<br />U
<br />U)
<br />W
<br />0
<br />z
<br />0
<br />Cn
<br />>
<br />W
<br />n
<br />i
<br />m
<br />IY
<br />U
<br />Z
<br />0
<br />m
<br />m
<br />0
<br />0
<br />Q
<br />U)
<br />W
<br />0
<br />C�
<br />0
<br />W
<br />Q
<br />0
<br />s
<br />Q
<br />z_
<br />0
<br />z
<br />0
<br />W
<br />06
<br />Z
<br />Q
<br />J
<br />a-
<br />W
<br />I-
<br />0
<br />w
<br />U)
<br />>
<br />W
<br />N
<br />E
<br />>, E
<br />-0 m N
<br />co
<br />a:
<br />cn m c
<br />.o w
<br />D
<br />f6 ny�
<br />L
<br />a) L
<br />L O
<br />Z
<br />J
<br />0-
<br />W
<br />I.-
<br />0
<br />W
<br />U)
<br />>
<br />W
<br />y
<br />y
<br />�V
<br />U)
<br />H
<br />0
<br />0-
<br />U)
<br />LL
<br />0
<br />IY
<br />IY
<br />0
<br />LL
<br />0-
<br />tY
<br />d
<br />iY
<br />0
<br />W
<br />0
<br />0
<br />Q
<br />O
<br />N
<br />rn
<br />N
<br />Z
<br />O
<br />co
<br />0
<br />W
<br />0 Z
<br />aJ
<br />W a
<br />00
<br />Q �
<br />Z
<br />Z
<br />00
<br />U
<br />C�
<br />Z_
<br />0
<br />Q
<br />0
<br />PREPARED FOR:
<br />VICTOR LAND
<br />HOLDINGS
<br />SITE PLANNING
<br />& ENGINEERING
<br />PLOWE
<br />ENGINEERING, INC.
<br />6776 LAKE DRIVE
<br />SUITE 110
<br />LINO LAKES, MN 55014
<br />PHONE: (651) 361-8210
<br />FAX: (651) 361-8701
<br />I• _
<br />0
<br />2
<br />0 15 30
<br />1 INCH = 30 FEET
<br />C2
<br />
|