My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 121621
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2021 PC Packets
>
PC PACKET 121621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:09:37 PM
Creation date
1/3/2022 3:03:35 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/16/2021
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2022- <br />Page 2 <br />Prior to the issuance of a building permit: <br />11. A Development and Assessment Agreement shall be executed for the extension of <br />140th Street North. <br />12. The applicant shall submit cut sheets for the wall mounted light fixtures to be <br />reviewed and approved by staff. <br />a. The applicant shall revise the plans to show shield over the wall lights in <br />the north side of the building. <br />13. The applicant shall submit the final building material samples and colors for the <br />building to be reviewed and approved by staff. The materials shall be compatible and <br />cohesive with the existing buildings in the campus development. <br />14. The proposed metal awing design shall be reviewed and approved by staff. <br />15. The internal roof drainage system that shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br />16. The trash receptacles shall be stored inside the building. <br />17. Cross access and maintenance agreement between the buildings shall be reviewed and <br />approved by staff. The document shall be recorded against the property. <br />Prior to issuance of a Certificate of Occupancy: <br />18. The extension of 1401h Street North shall be completed with at least the first lift of <br />bituminous. <br />19. All roof top and ground mechanical equipment must be screened from view of <br />adjacent properties. Staff shall perform an inspection when equipment is installed to <br />ensure compliance with City code. <br />20. All required landscaping shall be fully installed. <br />21. Drainage and utility easements shall be dedicated to the City over the wetland, <br />stormwater management facilities, and utility extensions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.