My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 121621
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2021 PC Packets
>
PC PACKET 121621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:09:37 PM
Creation date
1/3/2022 3:03:35 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/16/2021
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 1 7 <br />1 2 <br />n5 <br />T.O. PRECAST <br />130' - 0" <br />MEZZANINE_ <br />113' - 2" <br />FIRST FLOOR <br />100, - 0" <br />NORTH ELEVATION <br />3/32" = V-0" <br />KEYNOTES - ELEVATIONS <br />01 <br />INSULATED PRECAST PANEL WITH INSET RELIEF PATTERN; MATCH COLOR AND <br />TEXTURE AT EXISTING BUILDING'S; COLOR SHOWN IS APPROXIMATE <br />02 <br />HORIZONTAL RELIEF IN FACE OF PANEL, TYP. <br />03 <br />NOT USED. <br />04 <br />NOT USED <br />05 <br />PREFINISHED ALUMINIUM STOREFRONT <br />06 <br />PREFINISHED METAL ROOF COPING <br />07 <br />HOLLOW METAL DOOR & FRAME, PAINTED <br />08 <br />ENTRY CANOPY <br />09 <br />NOT USED <br />10 <br />POTENTIAL SIGN LOCATION <br />11 <br />2" INSULATED OVERHEAD SECTIONAL DOOR; PREFINISHED <br />EAST ELEVATION <br />3/32" = 1'-0" <br />M EZZAN I N <br />113' - 2" <br />WEST ELEVATION <br />3/32" = 1'-0" <br />3 4 5 <br />n4 n3 \-/ <br />I <br />06 05 <br />I <br />t t 10 <br />I I <br />I <br />6'-0" <br />TYP. <br />o a <br />E <br />ED <br />I <br />- - - <br />n n <br />02 01 <br />1 2 3 4 5 <br />06 05 <br />I I I I I <br />Now <br />I <br />E2 SOUTH ELEVATION <br />3/32" = 1'-0" <br />1 2 <br />107i 11 11 01 11 <br />3 4 <br />01 11 07 11 <br />T.O. PRECAST All <br />130' - 0" <br />MEZZANINE <br />113' - 2" <br />FIRST FLOORAL <br />100, - 0" <br />T.O. PRECAST <br />130'-0" <br />FIRST FLOOR <br />100' - 0" <br />T.O. PRECAST OIL <br />130' - 0" <br />FIRST FLOOR <br />100, - 0" <br />5 6 1 7 <br />un <br />O <br />d <br />Ln <br />Ln <br />z <br />J <br />O <br />r <br />Q <br />w <br />z <br />w <br />z w <br />C3) w <br />LLI Q <br />Q J <br />w <br />N rm <br />C3) m <br />CV m <br />I hereby certify this plan, specification or <br />report was prepared by me or under my <br />direct supervision and that I am a duly <br />Licensed Architect under the laws of the <br />MINNESOTA <br />`O <br />O <br />O--ntzell <br />Date: ' 10, 8 Reg. �N15125 <br />O <br />NO. DESCRIPTION DATE <br />Revisions <br />SITE PLAN <br />REVIEW <br />7/30/2021 <br />VICTOR LAND <br />HOLDINGS <br />BUILDING7 <br />11101Anll I1177A0TI IE)Inlr' <br />EXTERIOR <br />ELEVATIONS <br />Project number 21009.00 <br />Date 7/30/2021 <br />Drawn by ZHF <br />Checked by MW <br />Q <br />N <br />A300 <br />Scale 3/32" = 1'-0" <br />IN <br />0 <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.