My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 08.19.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 08.19.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:41:07 PM
Creation date
1/3/2022 3:38:20 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/19/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONUMENT <br />WIDE PAVED SHOULDER <br />LANES ON BOTH SIDES <br />OF EGG LAKE RD <br />BETWEEN GOODVIEW <br />AVE N AND HWY 61 <br />CONCRETE WALK <br />CONNECTION <br />TO HARDWOOD <br />CREEK REGIONAL <br />TRAIL AT HWY 61 <br />0' 25' 50' 100, <br />Scale in Feet <br />- 22' <br />IMPACT AREA <br />WETLAND BOUNDARY <br />EXISTING GROUND <br />ROUTE DESCRIPTION: <br />• 8' WIDE SEPARATED BITUMINOUS TRAIL <br />BETWEEN GENEVA AVE NAND EGG LAKE <br />RD WITH S WIDE BOULEVARD BUFFER <br />BETWEEN TRAIL AND ROAD <br />CONNECTION TO FUTURE TRAIL <br />TO HANIFL THROUGH PROPOSED <br />DEVELOPMENT <br />PRO'S: <br />• SEPARATED TRAIL PROVIDES BETTER <br />USER EXPERIENCE <br />• IMPROVED SAFETY AND A FAMILY - <br />FRIENDLY ROUTE COMPARED TO ON - <br />STREET ROUTE OPTION <br />CON'S: <br />• HIGHER DEGREE OF IMPACTS TO <br />WETLANDS AND UTILITIES <br />• ACQUISITION OF ROW / EASEMENT MAY <br />BE NECESSARY <br />OPTION2A: 10' WIDE BOARDWALK IN LIEU OF <br />TRAIL <br />PRO'S: MINIMIZES IMPACTS TO WETLANDS <br />AND HAS APPEALING CHARACTER WITH <br />POTENTIAL FOR VIEWING AREA BUMP -OUTS <br />CON'S: EXPENSIVE OPTION FOR <br />INSTALLATION, MAINTENANCE AND <br />REPLACEMENT THAT CAN BE SLIPPERY <br />DURING INCLEMENT WEATHER <br />LOCATOR MAP <br />rWETLAND <br />BOUNDARY <br />L 9' _ L 8' _ J 5' L 12' �_ 12' -30' <br />GRADE TAPER TRAIL BUFFER THRU LANE THRU LANE TO OHP <br />OPTION 2A: 8' WIDE SEPARATED TRAIL (WEST SIDE) <br />WETLAND <br />BOUNDARY WETLAND <br />BOUNDARY <br />EXISTING GROUND <br />10' 1 5' 1— 12' �_ 12' -30' <br />BOARDWALK BUFFER THRU LANE THRU IANE TO OHP <br />OPTION 213: 10' WIDE BOARDWALK (WEST SIDE) <br />Goodview Avenue Trail Feasibility I Geneva Ave N to Egg Lake Rd Hugo, Minnesota Option 2 WS b <br />August 14, 2020 1 WSB Project number: 016114-000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.