My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 08.19.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 08.19.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:41:07 PM
Creation date
1/3/2022 3:38:20 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/19/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
145TH ST N = • ' <br />■ <br />L -••• <br />Y _"� � y 11 • - • �, <br />ADDED PEDESTRIAN - <br />RAMPSAND <br />CROSSWALKSFROM <br />EXISTING WALKS <br />AT 145TH ST N & <br />GOODVIEW AVE N <br />- <br />--- <br />--— <br />i <br />. ��• Ns I <br />- +•, <br />WAYFINDING SIGNS <br />ROUTE DESCRIPTION: <br />• ADDED PEDESTRIAN RAMPS AND CROSSWALKS <br />FROM EXISTING WALKS AT 145TH ST N & GOODVIEW <br />AVE N <br />• 5' CONCRETE SIDEWALK ON SOUTH SIDE OF 145TH ST <br />N BETWEEN GLENBROOK AVE N AND GOODVIEW AVE <br />N <br />• ON -STREET ROUTE FROM GLENBROOK AVE N/144TH <br />ST N TO GENEVAAVE N WITH WAYFINDING SIGNS <br />PRO'S: <br />• GENEVAAVE N IS A WIDE STREETABLE TO <br />{ ACCOMMODATE VEHICLES AND BIKES <br />• GENEVAAVE N HAS SLOWER TRAFFIC THAN <br />GOODVIEW AVE N <br />• FEWER OVERALL IMPACTS THAN THE GOODVIEW AVE <br />N ROUTE <br />CON'S: <br />LESS DIRECT ROUTE FROM GENEVAAVE N TO 145TH <br />ST N <br />• ROUTE MAY BE MORE CONFUSING TO USERS <br />• ON -STREET ROUTE IS NOT AS FAMILY FRIENDLY ASA <br />SEPARATED TRAIL OR WALK <br />• SOME LOCAL RESIDENTS MAY BE OPPOSED TO A <br />DESIGNATED PEDESTRIAN ROUTE THROUGH THE <br />NEIGHBORHOOD <br />3 <br />w. <br />r o tWtii y, p <br />0\1 <br />� 1 A <br />Ep <br />MATCH LINE -SECTION B <br />3 LOCATOR MAP <br />8 <br />Goodview Avenue Trail Feasibility 145th St N to Geneva Ave N 26' 100, <br />Hugo, Minnesota Section A V V S b <br />y August 14, 2020 1 WSB Project number: 016114-000 Scale in Feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.