My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 04.15.20
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2020
>
Parks Packet 04.15.20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:58:39 PM
Creation date
1/3/2022 3:57:39 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/15/2020
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />LivingRealthy <br />Organization: City of Hui <br />Contact: Shayla Denaway <br />Address: Hugo City Hall <br />L14669 Fitzgerald Avenue North <br />:H <br />Code:55038 <br />E-mail: sdenawav@ci.hugo.mn.us <br />as9tm <br />County <br />Business <br />Address: <br />E-mail: <br />Code: <br />Phone: (651) 762-6342 1 Phone: <br />Potential number of community members impacted by this Federal Tax ID: 41-0954838 <br />project: 15,236 residents in Hugo <br />Date: February 19, 2020 <br />Has your organization ever received LHWC-SHIP funding? Yes <br />Project Description: <br />Master Planning Project: The trail feasibility study would assess a potential environmental change by identifying a pedestrian trail suitable for biking <br />and walking for numerous demographics between the residential neighborhoods along Goodview Avenue where there is an existing gap. This gap <br />currently prohibits residents from safely connecting to the Hardwood Creek Regional Trail to the west (via the sidewalk on Egg Lake Road), Diamond <br />Point Park to the north, and Hanifl Fields Athletic Park to the east (via future trail). This trail would promote physical activity for all ages in a much safer <br />environment than is currently the case, where pedestrians currently have to utilize the same road as vehicular traffic. If the trail is deemed feasible, <br />30% plans will be drafted. This includes support documentation defining the trail type, location, construction techniques and impacts, along with <br />planning level cost estimation for future implementation. This would provide the City of Hugo the ability to implement the trail through a capital <br />improvement plan or in conjunction with planned road improvement projects. The plan may even guide additional trail improvements with future <br />development projects. <br />Active Living Equipment Project: The City of Hugo has a population of over 15,000 residents and a mix of suburban and rural landscapes. There are <br />over 406 acres of park land and 14 miles of trails. As a developing community, the trail and sidewalk network continues to expand and be better <br />connected. In the fall of 2017, the City of Hugo conducted a survey of existing neighborhood parks/trails and identified areas that needed improvement. <br />This partner project would assist with providing needed trail benches as identified in the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.