My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 12.15.21
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2021
>
Parks Packet 12.15.21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 4:16:22 PM
Creation date
1/3/2022 4:13:12 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/15/2021
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lions Park Construction <br />The final Lions Park plans were approved and bids were authorized in May. Bid <br />openings were held in June for the three separate projects. Contracts were <br />awarded at the Council meeting of June 21 to Peterson Companies for the storm - <br />water project and park site/street improvement projects. All of the alternates were <br />approved including the northwest parking lot and pedestrian lighting. Schreiber <br />Mullaney was awarded the contract for construction of the pavilion. Council also <br />asked for quote for the planned future phase of the playground which was initially <br />postponed due to cost. Phase 2 was a challenge course for teens. At their meet- <br />ing of July 19, Council approved the quote, but asked that the Parks Commission <br />select the surfacing. The Commission selected artificial turf for phase 2 at their <br />July 21 meeting. <br />A ground breaking was held on July 6 and construction started the following week. <br />Peterson Companies handled removals and began grading on the park. The <br />grading work within the park had a dramatic appearance because material was <br />sourced within the park for the base of the new 147th Street extension and swap- <br />ping of materials provided substantial cost savings and improved both projects. <br />The City Hall parking lot, downtown streets, sport courts, and more were finished <br />in the fall. The pavilion started taking shape in November. Electrical work includ- <br />ing street lights and bollards will continue, but construction of the rest of the park <br />will pause over the winter. The pavilion will be under construction with a comple- <br />tion date of April 1, 2022 after which site work will resume in the park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.