My WebLink
|
Help
|
About
|
Sign Out
Home
Parks Packet 01.20.21
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2021
>
Parks Packet 01.20.21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 8:54:39 AM
Creation date
1/5/2022 8:49:27 AM
Metadata
Fields
Template:
Commissions
Meeting Date
1/20/2021
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H A G E N, CHRISTENSEN & MCILWAIN <br />A R C H I T E C T S <br />MEMORANDUM <br />TO: City of Hugo FROM: HCM <br />DATE: 01.15.2021 <br />COMM. NO: <br />SUBJECT: Lions Park Pavilion Design COPIES TO: File <br />Design Development Budget Summary <br />Main Pavilion Building ($350/sf): $ 2,072,700 <br />Exterior covered spaces ($175/sf): $ 277,725 <br />Picnic Shelter ($275/sf): $ 288,750 <br />Subtotal $ 2,639,175 <br />*Construction Escalation for 2021 (0%)* $ 0 <br />7.5% contingency $ 197,938 <br />Project Construction Budget $ 2,837,113 <br />Furniture & Equipment costs not included in above costs. <br />AV, Security, Low Voltage cabling and devices are not included in above costs. <br />Note: <br />*For construction start in 2022, assume 8% ($211,000) in project escalation costs. <br />P H 6 1 2- 9 0 4- 1 3 3 2 F A X 6 1 2- 9 0 4- 7 3 6 6 <br />4 2 O 1 CEDAR AVENUE SOUTH M I N N E A P O L I S, M N 5 5 4 0 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.