My WebLink
|
Help
|
About
|
Sign Out
Home
2022.02.22 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.02.22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 8:54:55 AM
Creation date
2/22/2022 8:53:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/22/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2022 Oneka Parkway Improvement Project <br />City of Hugo, MN <br />WSB Project No. 018888-000 Page 6 <br />6. NESSECITY AND EFFECTIVENESS <br />The improvements proposed in this study are necessary, cost-effective, and feasible. The reconstruction <br />of the street provides the City with a cost-effective means of continuing the City’s street improvement <br />efforts and providing an adequate means of transportation for residents. These improvements will <br />provide a longer lasting street section needing less maintenance over the expected service life. <br />The proposed improvements constitute a project large enough to provide a competitive bidding <br />environment, economy of scale, and are therefore deemed to be cost-effective. <br />Based on the information contained within this report, the proposed improvements as described can be <br />considered necessary, cost-effective, and feasible from an engineering standpoint.
The URL can be used to link to this page
Your browser does not support the video tag.