Laserfiche WebLink
Page 1 of 3 <br /> <br />MEMORANDUM OF UNDERSTANDING <br />BETWEEN THE CITY OF HUGO AND WASHINGTON COUNTY <br />FOR DESIGN AND INSTALLATION OF A TRAFFIC SIGNAL SYSTEM <br />ON COUNTY STATE AID HIGHWAY (CSAH) 8 <br />AT ITS INTERSECTION WITH ONKEA PARKWAY IN THE CITY OF HUGO <br /> <br /> <br />THIS MEMORANDUM OF UNDERSTANDING, by and between the City of Hugo, a municipal corporation, <br />herein after referred to as the "City", and Washington County, a political subdivision of the State of <br />Minnesota, hereinafter referred to as the "County.” <br /> <br />WHEREAS, the County has determined through its Intersection Control Ranking System (ICRS) that the <br />intersection of CSAH 8 (Frenchman Road) and Oneka Parkway will soon be a candidate location for <br />installation of a traffic signal; and <br /> <br />WHEREAS, the City is planning to construct roadway improvements on Oneka Parkway at its intersection <br />with CSAH 8, hereinafter referred to as the “Project”; and <br /> <br />WHEREAS, the City and County have determined that it would be mutually beneficial to incorporate the <br />design and construction of a traffic signal system into the city’s planned Project to improve Oneka <br />Parkway. <br /> <br /> <br />NOW THEREFORE, IT IS HEREBY MUTUALLY UNDERSTOOD BY THE PARTIES AS FOLLOWS: <br /> <br />1. PURPOSE <br />The City and County agree to incorporate the design and construction of a new fully actuated <br />traffic control signal system at CSAH 8 into the City’s planned Project to improve Oneka <br />Parkway, and to share in the design and construction costs of such traffic signal system and <br />associated components and pedestrian ramps, under the arrangement described in the <br />following sections. <br /> <br />2. PLANS AND SPECIFICATION PREPARATION <br />a. The City will be responsible for the preparation of all the plans and specifications for the <br />Project, including but not limited to, compliance with all applicable standards and <br />policies and obtaining all approvals required in formulating the bid specifications for all <br />County and City components of this Project. <br />b. The City shall provide for county review all draft plan submittals for work within the <br />county right-of-way, including at a 30%, 60%, and 90% level. The 30% plan submittal <br />shall indicate all proposed signal structure locations along with surveyed utilities, such <br />that the county may pothole for utility verification purposes. <br />c. The following County project numbers have been assigned to the Project: SAP 082-608- <br />012? and CP 22-10804. <br />d. The following City project numbers have been assigned to the Project: SAP 224-111-002. <br /> <br />3. PROJECT COMPONENTS <br />a. The traffic signal construction will conform to Washington County’s design preferences <br />and Division SS specifications and will include pedestrian ramps on all four corners