My WebLink
|
Help
|
About
|
Sign Out
Home
2022.04.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2022 CC Packets
>
2022.04.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 8:41:08 AM
Creation date
4/1/2022 8:40:42 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/4/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> <br />MEMORANDUM OF UNDERSTANDING <br />BETWEEN THE CITY OF HUGO AND WASHINGTON COUNTY <br />FOR DESIGN AND INSTALLATION OF A TRAFFIC SIGNAL SYSTEM <br />ON COUNTY STATE AID HIGHWAY (CSAH) 8 <br />AT ITS INTERSECTION WITH ONKEA PARKWAY IN THE CITY OF HUGO <br /> <br /> <br />THIS MEMORANDUM OF UNDERSTANDING, by and between the City of Hugo, a municipal corporation, <br />herein after referred to as the "City", and Washington County, a political subdivision of the State of <br />Minnesota, hereinafter referred to as the "County.” <br /> <br />WHEREAS, the County has determined through its Intersection Control Ranking System (ICRS) that the <br />intersection of CSAH 8 (Frenchman Road) and Oneka Parkway will soon be a candidate location for <br />installation of a traffic signal; and <br /> <br />WHEREAS, the City is planning to construct roadway improvements on Oneka Parkway at its intersection <br />with CSAH 8, hereinafter referred to as the “Project”; and <br /> <br />WHEREAS, the City and County have determined that it would be mutually beneficial to incorporate the <br />design and construction of a traffic signal system into the city’s planned Project to improve Oneka <br />Parkway. <br /> <br /> <br />NOW THEREFORE, IT IS HEREBY MUTUALLY UNDERSTOOD BY THE PARTIES AS FOLLOWS: <br /> <br />1. PURPOSE <br />The City and County agree to incorporate the design and construction of a new fully actuated <br />traffic control signal system at CSAH 8 into the City’s planned Project to improve Oneka <br />Parkway, and to share in the design and construction costs of such traffic signal system and <br />associated components and pedestrian ramps, under the arrangement described in the <br />following sections. <br /> <br />2. PLANS AND SPECIFICATION PREPARATION <br />a. The City will be responsible for the preparation of all the plans and specifications for the <br />Project, including but not limited to, compliance with all applicable standards and <br />policies and obtaining all approvals required in formulating the bid specifications for all <br />County and City components of this Project. <br />b. The City shall provide for county review all draft plan submittals for work within the <br />county right-of-way, including at a 30%, 60%, and 90% level. The 30% plan submittal <br />shall indicate all proposed signal structure locations along with surveyed utilities, such <br />that the county may pothole for utility verification purposes. <br />c. The following County project numbers have been assigned to the Project: SAP 082-608- <br />012? and CP 22-10804. <br />d. The following City project numbers have been assigned to the Project: SAP 224-111-002. <br /> <br />3. PROJECT COMPONENTS <br />a. The traffic signal construction will conform to Washington County’s design preferences <br />and Division SS specifications and will include pedestrian ramps on all four corners
The URL can be used to link to this page
Your browser does not support the video tag.