Laserfiche WebLink
2 <br />0 <br />U <br />6 <br />Z <br />w <br />m <br />U) <br />Z <br />J <br />Z) <br />a <br />a_ <br />Z <br />a <br />0 <br />0 <br />N <br />W <br />D <br />U) <br />W <br />w <br />Ir <br />U) <br />w <br />00 <br />wsb <br />April 22, 2022 <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan Review <br />Oneka Elementary School <br />WSB Project No. 020118-000 <br />Dear Ms. Juba: <br />We have reviewed the site plan submittal for the Oneka Elementary School Addition site located <br />west of Oneka Parkway and north of Heritage Parkway. In particular, we have reviewed the <br />following plans related to this particular request: <br />• Oneka Site Submittal (2022.3.4 - Oneka ES City Submittal.pdo dated 3/4/2022 by Larson <br />Engineering and Wold Architects and Engineers <br />• Stormwater Report (22.03.23 Oneka Elementary School Stormwater Report.pdo dated <br />3/23/2022 by Larson Engineering <br />Based on the review of the above documents, we offer the following comments related to this <br />application: <br />Grading, Street, and Utility Plans <br />1. The site is not impacting either of their existing access points and only modifying their <br />northern parking lot to provide an additional row of parking. <br />2. The applicant is constructing an addition on their building that conflicts with their existing <br />looped water service. They will be rerouting the water service around the building addition <br />and providing a new stub to service it. All construction for the rerouting and new water service <br />connection will be outside the City right of way and on private property. <br />3. The sanitary service to the new addition will be provided by constructing a manhole and <br />connecting to their existing sanitary sewer service. All construction for the sanitary sewer <br />service connection will be outside the City right of way and on private property. <br />4. Grading is proposed adjacent to the building addition to blend into the surround existing <br />topography. Additional grading is also proposed to accommodate drainage from the parking <br />lot addition. <br />5. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br />K:\020118-000\Admin\Docs\020118-000 LTR RJuba- Oneka Elementary School 2022-04-22.docx <br />