My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 042822
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 042822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 11:40:37 AM
Creation date
5/4/2022 11:34:04 AM
Metadata
Fields
Template:
Commissions
Meeting Date
4/28/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� <br />2 � 3 4 5 � 6 7 � $ � <br />` SYMBOL LEGEND <br />JJ <br />INFILTRATION AREA, MNDOT SEED MIX 33-261 <br />JJ <br />-1 \ <br />Drainage & Utility Easement per plat of WATERS EDGE <br />Ponding & Flowage Easement over all of Drainage & / JJ NEW SOD <br />Utility Easement of Outlot A, WATERS EDGE per Doc. <br />No. 596408 & 3482732 , \ <br />A <br />LANDSCAPING NOTES <br />TI J <br />/ 1. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new <br />improvements on and off -site during landscape work activities. Report any damage to the General <br />\�vJ Contractor immediately. <br />2. Plant size and species substitutions must be approved in writing prior to acceptance in the field. <br />\\\ 3. Landscape Contractor is responsible for ongoing maintenance of all newly installed material until time of <br />\\\ owner acceptance. Any acts of vandalism or damage which may occur prior to owner acceptance shall be <br />\\\ the responsibility of the contractor. Contractor shall provide the owner with a maintenance program <br />\\\ including, but not limited to, pruning, fertilization and disease/pest control. <br />41 <br />4. Landscape Contractor shall provide the owner with a watering schedule appropriate to the project site <br />conditions and to plant material growth requirements. <br />5. Landscape Contractor shall guarantee newly planted material through one calendar year from the date of <br />\\\ / 14 ADDITIONAL FUTURE written owner acceptance. Plants that exhibit more than 10% die -back damage shall be replaced at no <br />\ \\� PARKING STALLS \ additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodent <br />\ \ protection measures for the plantings during the warranty period. <br />\�\\ \ > \ 6. Planting areas shall be edged with 6" black vinyl edging and have 4" colored hardwood wood mulch over a <br />\ \ weed barrier fabric. <br />O N D 4 � � � \\� <br />OTTOM = 917.00 \ 7. All trees not planted in landscaped areas shall have shredded hardwood mulch placed around the tree at 4' <br />�M <br />\ <br />ERMANENT POOL = 50 � � \\\ \ \ <br />B 100 YR HWL = 921.60 \\\ \ \ diameter and 6" deep. <br />\\ \ <br />/ <br />EOF = 922.30 � \� \ \ '� \ 8. Restore all disturbed turf areas with 6" of good quality topsoil and seed unless otherwise specified. <br />3 MEASURED ELEV. 11/03/ 1 = 920. 8 � � \ <br />MEASURED ELEV. 02/21/2 = 920.4 \ <br />�M (ICE) <br />PLANTING SCHEDULE <br />N <br />—IM <br />J� <br />Drainage & Utility Easement per plat of WATERS E GE <br />Ponding & Flowage Easement over all of Drainage & 3 <br />Utility Easement of Outlot A, WATERS EDGE per Doc. <br />No. 596408 & 3482732 <br />E <br />\ WL <br />F <br />A <br />QTY <br />COMMON NAME <br />BOTANICAL NAME <br />SIZE <br />CONTAINER <br />OVERSTORY TREES, SEE DETAIL 6/C700 <br />"� <br />Fraxinus Amerucana <br />- <br />J <br />4 <br />Autumn Blaze White Ash <br />2-1/2„ Cal <br />B & B <br />Autumn Blaze' <br />- <br />6 <br />Amur Cherry <br />Prunus Maackii <br />2-1/2" Cal <br />B & B <br />- <br />aka <br />8 <br />Prairifire Crabappple <br />Malus X 'Prairifire' <br />2-1/2" Cal <br />B & B <br />FF <br />1 \ \ <br />1 \ <br />1 \ <br />11 \\ FT \ <br />1 \ <br />1 <br />\ J <br />i \ 7 \ <br />� 1 \ <br />11 \\ <br />r \POND 3 <br />BOTTOM = 915.00 <br />PERMANENT POOL = 918.50 <br />NORTH <br />0 15 30 60 <br />Oneka Elementary <br />School Addition and <br />Renovation <br />4888 Heritage Pkwy North <br />Hugo, MN 55038 <br />INDEPENDENT SCHOOL <br />DISTRICT #624 <br />4855 Bloom Avenue <br />White Bear Lake, MN 55110 <br />WOLD ARCHITECTS <br />AND ENGINEERS <br />332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />woldae.com 1 651 227 7773 <br />Larson <br />Engineering, Inc. <br />3524 Labore Road <br />White Bear Lake, MN 55110 <br />651.481.9120 (f) 651.481.9201 <br />www.larsonengr.com <br />© 2021 Larson Engineering, Inc. All rights reserved. <br />I hereby certify that this plan, specifications or report <br />was prepared by me or under my direct supervision <br />and that I am a duly licensed Professional Engineer <br />under the laws of the state of Minnesota. <br />01 <br />Greg A. Buchal, P.E. <br />Date: 03.25.2022 Lic. No.: 23793 <br />Revisions <br />Description Date Num <br />Comm: 12216147 <br />Date: 03.25.2022 <br />Drawn: MTH <br />Check: GAB North <br />LANDSCAPE <br />PLAN <br />03.25.2022 CD SET <br />Scale: <br />C600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.