My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 042822
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 042822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 11:40:37 AM
Creation date
5/4/2022 11:34:04 AM
Metadata
Fields
Template:
Commissions
Meeting Date
4/28/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Premier Bank - Sketch Plan <br />It's unclear in the reading the meeting minutes of the Planning Commission or the City <br />Council, whether they imagined each parcel being rezoned individually or if they <br />imagined the area being redeveloped into commercial all together, such as a master plan <br />for the entire area. If this property is rezoned to C-1, the City should expect that each <br />parcel will be developed separately and individually, rather than a master planned for <br />development. Transitions between land uses are hard to incorporate in a plan when each <br />parcel is developed separately or there is not a master plan for the area. <br />Staff has not discussed this concept with the neighborhood along Flay Avenue. Staff is <br />also unsure if the neighborhood is aware and understands the intention of the FCB zoning <br />district. This is a unique zoning district, as it is a residential zoning district and holding <br />place for future commercial development. Staff recommends that a neighborhood <br />meeting be held with the property owners to provide background on the FCB zoning <br />district and how the area might develop. <br />General Design Standards <br />The guidelines state that "building should be oriented to the street with fully articulated <br />street facades based on traditional storefronts (doors and display windows) along the <br />sidewalk". The building is not oriented to the street, but rather more central to the site. <br />This is due to the drive -through lane. It is hard for a drive -through business to have a <br />building that is oriented to the street since it generally need circulation around the <br />building. The property also has the Hardwood Creek Trail along Highway 61, which <br />limits how close you can get the corner of the property to orient the building to the street. <br />Although not labeled, it is assumed the canopy for the drive -through is covered along <br />Highway 61. The design of the canopy will be important as this can help the orientation <br />of the building be closer to the streets to meet the intent of the design guidelines. <br />The guidelines state that "all new downtown development shall provide for pedestrian as <br />well as vehicle circulation and shall create linkages to existing and proposed sidewalks". <br />The applicant is not showing the public road easement or the additional 8 foot wide trail <br />easement on the south side of the property for construction of the trail along 1471h Street. <br />The proposed site plan will need to be revised to show the easement and trail along 1471h <br />Street. A connection from the site to the trail should be made with the revisions. <br />Based on the use, 18 parking spaces are required. The applicant is showing 21 parking <br />spaces and meets the parking ordinance. The guidelines discourage parking lots to be <br />located between the street and the building. The guidelines encourage parking adjacent to <br />the street to be minimized by a combination of landscaping, architectural fencing, or wall <br />plantings. The applicant has not shown how the property would be landscaped, but could <br />incorporate landscaping along the parking and drive -through lane as encouraged by the <br />design guidelines. <br />Streets and Access <br />The sketch plan shows access from Flay Avenue on the east side of the property. The <br />performance standards section of the City Code states that the main entrance of a drive - <br />through business shall be located on a State Highway, County Road or City Commercial <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.